Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Finance | ₹7.0 L | L1 | Admitted-Finance |
| 2 | L2₹7.9 LAdmitted-Finance | ₹7.9 L | L2 | Admitted-Finance |
| 3 | L3₹8.0 LAdmitted-Finance 100 FOOTA ROAD FCI COLONY BAREILLY | BAREILLY | UTTAR PRADESH | 243001 | ₹8.0 L | L3 | Admitted-Finance |
| 4 | L4₹8.0 LAdmitted-Finance | ₹8.0 L | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S EVERGREEN TRADERS L4 | S S Enterprises L3 | M/S ANANDESHWAR ENTERPRISES L1 | chauhan enterprises L2 |
|---|---|---|---|---|---|---|---|
| 1.00Safe Carriage of following Materials from ESC Store Centre Unnao to work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement. | |||||||
| 1.01 | PCC/STP Pole | 50 | Nos | 1,200 ₹60,000 | 1,250 ₹62,500 | 550 ₹27,500 | 1,190 ₹59,500 |
| 1.02 | HT XLPE Cable of Different Size | 100 | Mtr | 30 ₹3,000 | 25 ₹2,500 | 100 ₹10,000 | 25 ₹2,500 |
| 1.03 | ACSR Weasel Conductor/Rabit Conductor | 1,200 | Mtr | 15 ₹18,000 | 15 ₹18,000 | 50 ₹60,000 | 10 ₹12,000 |
| 1.04 | Arial bunch Conductor of Different Size | 200 | Mtr | 30 ₹6,000 | 15 ₹3,000 | 25 ₹5,000 | 25 ₹5,000 |
| 1.05 | Distribution Transformer 25 KVA/ 63KVA/ 100 KVA 11/0.4 KV | 10 | Nos | 3,500 ₹35,000 | 4,500 ₹45,000 | 4,500 ₹45,000 | 4,000 ₹40,000 |
| 1.06 | 11 KV Pilfer proof metering cubical and CT/PT unit | 1 | Nos | 3,800 ₹3,800 | 4,500 ₹4,500 | 4,500 ₹4,500 | 7,000 ₹7,000 |
| 1.07 | Loose line material. | 10 | Job | 3,200 ₹32,000 | 3,250 ₹32,500 | 2,000 ₹20,000 | 3,000 ₹30,000 |
| 2.00 | Erection of PCC/ STP Double Pole Structure including digging of pit and fitting of all accessories complete. | 10 | Nos | 1,500 ₹15,000 | 1,850 ₹18,500 | 2,500 ₹25,000 | 1,500 ₹15,000 |
| 3.00 | Erection of PCC/ STP Pole including digging of pits, fitting of all accessories with its cartage dump site as per RESPO norms. | 30 | Nos | 5,000 ₹1.5 L | 3,750 ₹1.1 L | 4,500 ₹1.4 L | 4,800 ₹1.4 L |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
6 Feb 2026, 5:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle-Unnao
QUANTUM OF WORK FOR CONSTRUCTION OF NEW 11 KV LINE AND S/S LT FOR RELEASING CONNECTION UNDER FULL DEPOSITE SCHEAME IN THE AREA OF EDSD-PATAN AND BHAGWANT NAGAR UNDER DIVISON-PURWA, UNNAO.
2026_MVVNL_1110180_1
122/E.D.C./Unnao/2025-26
Open Tender
Miscellaneous Works
180 days
Unnao
as per tender document
2 documents required · 2 mandatory
₹1,180
A/CNo.3355002101008374,IFSCCodePUNB0335500
₹8,000
16 Feb 2026
28 Jan 2026
7 Feb 2026
28 Jan 2026
6 Feb 2026
28 Jan 2026
Safe Carriage of following Materials from ESC Store Centre Unnao to work dump site/dump site to ESC Store along with loading unloading & proper stocking as per requirement.
PCC/STP Pole
HT XLPE Cable of Different Size
ACSR Weasel Conductor/Rabit Conductor
Arial bunch Conductor of Different Size
Distribution Transformer 25 KVA/ 63KVA/ 100 KVA 11/0.4 KV
11 KV Pilfer proof metering cubical and CT/PT unit
Loose line material.
Erection of PCC/ STP Double Pole Structure including digging of pit and fitting of all accessories complete.
Erection of PCC/ STP Pole including digging of pits, fitting of all accessories with its cartage dump site as per RESPO norms.
Making of H.T./L.T. Section points by brackets, clamps & Making of T-off arrangement for including fabrication and fitting of all accessories.
Grouting of PCC Pole as per RESSPO norms with grouting materials.
Earthing of PCC/ STP Pole as per RESSPO norms with clamp.
Digging of pits, fixing, nuzzling and grouting of stay rods as per RESSPO norms with grouting materials.
Fabrication/ Modifications of MS Items, for making sub station/HT/LT Line for 25/63/100 KVA Distribution Transformer, Nuts & Bolts as per requirement of site conditions.
Dismantling for Line Shifting of single pole/ Double Pole, Conductor, AB Cable and X-arms, brackets, Insulators, Channels and all hardware fittings.
Dismantling for Shifting Distribution Transformer on pole / plinth, Earthing and all related fittings.
Placement of 11/0.433 KV Distribution Transformer newly constructed T/F on Duble Pole Installation and commissioning of 25/63/100 KVA Transformer including lugs ,Jumpering & connecting Earthing of body & neutral with proper fitting with lugs,nut& bolt as per required.
Supply and Fixing of following materials
Holding clamps for PCC/STP with Nuts & Bolts.
Stay clamps for PCC/STP with Nuts & Bolts.
LT clamps with Insulator for PCC/STP with Nuts & Bolts.
F-clamps for PCC/STP with Nuts & Bolts.
Laying of 11 KV cable size 3x70 sq mm/120 sq mm, dragging of trench 1050 mm, deep 520 mm wide, including all materials etc. /overhead on pole as required on site.
Making of cable box for 11 KV 3x70 to 3x120 sq. mm cable jointing kit/cable box.
Laying Stringing & sagging of HT line by ACSR Weasel Conductor including all related work as joints /jumpers and binding on Insulators as required.
Laying, stringing Aerial Bunched Cable 1x16 / 3x50/ 3x95 sq mm including all related work as joints /jumpers and binding on Insulators as required.
Installation and testing and commissining New 11 KV Pilfer proof metering cubical in Metering Room and CT/PT unit on pole and Cable terimanison, connecting earthing etc.
New earthing for distribution transformers/Pilfer one neutral and one for body of transformer/Ppilfer 40 ft. deep GI pipe of size 40 mm, making all arrangements for its recharging funnel with open able cover steel cheuqured plate with hinges and making connections to transformer neutral/body by G.I. strip of size 35x5 mm after complete running welding and connecting with pipes by clamps/nut bolts and welding.
Cable hosting at pole with GI pipe & clamps as per RESPO Norms ( GI Pipe Provided by Contractor)
Laying, stringing, tensioning & final sagging Guarding of Earth wire/G.I. wire including of cross lacing (minimum 10 no. in each span)
Chopping of tree branches lying in the route of making new 11 KV / LT line.
Received Back of Dismentling Material from work dump site/dump site to ESC store along wit loading unloading & proper stocking as per requirement
Distribution Transformer of various capacity
Scrap Iron
Old & Used /damaged Cable /Conductor
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Doc122.pdf
Tender Documents • 1.39 MB
BOQ_2050164.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid