Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | -36.11% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.3 L+₹13,052.64 (4.09%)Admitted-Finance | -33.50% | ₹3.3 L+₹13,052.64 (4.09%) | L2 | Admitted-Finance |
| 3 | L3₹3.3 L+₹13,702.78 (4.29%)Admitted-Finance | -33.37% | ₹3.3 L+₹13,702.78 (4.29%) | L3 | Admitted-Finance |
| 4 | L4₹3.4 L+₹20,054.06 (6.28%)Admitted-Finance | -32.10% | ₹3.4 L+₹20,054.06 (6.28%) | L4 | Admitted-Finance |
| 5 | L5₹3.5 L+₹30,556.20 (9.56%)Admitted-Finance | -30.00% | ₹3.5 L+₹30,556.20 (9.56%) | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
20 Apr 2026, 2:00 pmClosed
General Manager (Works)
Office of Addl. CEO. SASB
Repair To Damaged Langar Drains including other spots at Nunwan Camp for yatra- 2026.
2026_SASB_307702_9
SASB/eNIT/2026/08
Open Tender
Civil Works
Percentage
21 days
Pahalgam Axis
Please refer Tender documents.
2 documents required · 2 mandatory
₹472
J and K Bank 0110040100014077
₹10,000
23 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
20 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | providing and laying of soling stone for laying on bed foundation including all carriages of material all complete: | 47 | Cum | 1,000 | ₹47,000 |
| 2 | Providing and laying in position cement concrete of specified grade excluding cost of centering and shuttering all works upto plinth level as Mud mate in 1:4:8 using 20 mm nominal size crushed aggrigates. | 16 | cum | 5,381.6 | ₹86,105.6 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 30 | Cum | 6,217.8 | ₹1,86,534 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for column etc. | 198 | Sqm | 280.1 | ₹55,459.8 |
| 5 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 150 | Sqm | 451.5 | ₹67,725 |
| 6 | Carriage of cement by mechanical transport avg. distance 50Km. | 9.62 | MT | 652.95 | ₹6,281.38 |
| 7 | Sand and Aggrigates from avg. 50 Kms . | 70 | cum | 728.51 | ₹50,995.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_998073.xls
BOQ • 0.33 MB
DEALLL.pdf
PDF • 0.07 MB
DEALL.pdf
PDF • 0.07 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .