Block development office BP
Block development office BP poonamallee Block
1 Reconstruction of drainage in Main road Samathuvapuram at Kuthambakkam panchayat 2Reconstruction CC road of drainage in Samathuvapuram Cross street at Kuthambakkam panchayat 3 Construction of 1.0 Span RCC Slab Culvert in Samathuvapuram Main
2022_RDTN_229210_1
3084/2021/A2
Open Tender
Civil Works
Works
150 days
Samathuvapuram
class II
5 documents required · 5 mandatory
₹0
₹1.3 L
Yes
BDO office BP
24 Jan 2023
14 Apr 2022
27 Apr 2022
14 Apr 2022
27 Apr 2022
19 Apr 2022
19 Apr 2022
Amount
1.Reconstruction of drainage in Main road Samathuvapuram @ Kuthambakkam panchayat.
Earth work excavasion in all soil includind all cost and conveancy charges
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
CC 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Plastering in cement morter 1:4 20mm thick including cost and conveyance of all materials site and all labour charges etc. complete
2.Reconstruction CC road of drainage in Samathuvapuram Cross street @ Kuthambakkam panchayat.
Earth work excavasion in all soil includind all cost and conveancy charges
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
CC 1:2:4 mix using 20 mm metal including cost and conveyance of all materials to site mixing, placing, curing and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Plastering in cement morter 1:4 20mm thick including cost and conveyance of all materials site and all labour charges etc. complete
Supply of Bitumen pads including cost and conveyance of all materials to site and all labour charges etc. complete.
3.Construction of 1.0 m Span RCC Slab Culvert in Samathuvapuram main road @ Kuthamabakkam panchayat ( 1no).
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Supply and fabrication of steel for RCC work including all cost and conveyance of materials and labour charges etc., complete.
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
4.Construction of 1.0 m Span RCC Slab Culvert in Samathuvapuram Community hall @ Kuthamabakkam panchayat ( 2no)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Supply and fabrication of steel for RCC work including all cost and conveyance of materials and labour charges etc., complete.
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
5.Providing of RCC Slab Culvert @ I at street Near Amma park Samathuvapuram @ Kuthambakkam panchayat.(NO -1)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
6.Providing of RCC Slab Culvert @ Balwadi street Samathuvapuram @ Kuthambakkam panchayat.(NO -2)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
7.Providing of RCC Slab Culvert @ Poomalai street Samathuvapuram @ Kuthambakkam panchayat.(NO -3)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
8.Providing of RCC Slab Culvert @ Poomalai 2nd street Samathuvapuram @ Kuthambakkam panchayat.(NO -4)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
9.Providing of RCC Slab Culvert @ Valvozhivadi 1st street Samathuvapuram @ Kuthambakkam panchayat.(NO -5)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
10.Providing of RCC Slab Culvert @ Valvozhivadi 2nd street Samathuvapuram @ Kuthambakkam panchayat.(NO -6)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
11.Providing of RCC Slab Culvert @ Samathuvapuram 7th street @ Kuthambakkam panchayat.(NO -7)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
12.Providing of RCC Slab Culvert @ Samathuvapuram 8th street @ Kuthambakkam panchayat.(NO -8)
Earth work excavasion in all soil includind all cost and conveancy charges
Supplying and fixing of M sand including all cost of matrial and conveyance to site and labour charges for laying, watering and compacting etc. complete
Cement Concrete 1:4:8 using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges etc. complete
Cost towards supply centering with planks including all cost and conveyance charges
Above base
Supply & fabrication of steel including cost and conveyance extra complete
RCC 1:1.5:3 mix 20mm metal including cost and conveyance etc. completed
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
P Saravanan
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .