Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 BAMANAI LUHETA HATHRAS HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | Admitted-Finance |
| 2 | Admitted-Finance SANTOBI MATA GALI MURSAN HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | Admitted-Finance |
| 3 | Admitted-Finance 01 NAUJARPUR BASAI KAJI SASNI HATHRAS UTTAR PRADESH 202150 | ALIGARH | UTTAR PRADESH | 202150 | Admitted-Finance |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
6 Jan 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC Hathras
SE EDC Hathras
Work
2021_DVVNL_661711_1
EDCH-143/2021-22
Open Tender
Electrical Works
Item Rate
15 days
SE EDC Hathras
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL
₹2,000
7 Jan 2022
23 Dec 2021
6 Jan 2022
23 Dec 2021
6 Jan 2022
23 Dec 2021
30 days
Amount
Safe Carriage of following material from Electricty store center Hts to Pit site of work through the Kacha and Pakka road including loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-50 Kms.)
8.5/9 Mtr. PCC. Poles
9/11 Mtr. S.T. Poles
11 KV XLPE Cable
11 KV X-Arms, weasal conductor, G.I wire,Disc Insulators, Pin insulators, clamps Abc Bunch and other required line material, if any.
Safe Carriage of following from Electricty Store center Hathras to Pit Site of Work through the Kacha and Pakka road loading and unloading at the respective ends including the cost of arrangement of labour, T&P, etc. which required for proper completion of work.(Distance 00-70 Kms.)
250 KVA T/F
Dismentlling and removal of Conductor from the various area, stacking and placement their coils in the respective J.Es (store) duly stacked, as per direction of supervising engineer. It includes the work of cartage, the cost of labour, T&P carrier etc. required for proper completion of work.
ABC Bunch
Errection of following Poles including Cutting of kharanja/mettalic road/concrete portion while digging pit & complete H.T./L.T. fittings as per RESPO manual and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work.
8.5/9 Mtr. PCC. Poles
Double pole with complet fitting
Grouting of ST Pole (wherever required) with cement, sand and brick ballast/stone ballast in ration 1:4:8 including the cost of arrangement of cement, sand, brick ballast/stone ballast, stone pad etc. As per actual site requirement.
Errection and grouting of stays as per RESPO Norms and as per direction of supervising engineer. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
Fixing of earthing rod as per RESPO Norms and as per direction of supervising engineer.
Laying, sagging and stringing and jumpering / binding etc. of new & old ACSR Weasal conductor / GI in 11 KV / LT lines as per RESPO manual and as per direction of supervising engineer.
LT PVC Cable
ABC Cable
11 KV XLPE Cable
Construction of plinth of size 5' * 5 * 4' above ground level one ft below the ground level of 9" After Exavation of 4 "earth brick ballast shall be provided and rammering will be done properly After ballast shall be provided and rammering will be done properly After that a retaining wall 9"width by fist class brick in ratio 1:4 of cement & sand shall be made . The earth shall be filled up to one ft.below the top of the plinth After this brick ballast shall be provided upto 6"from the earth level and proper rammering shall be done one No. jall of 12 mm MS tor shall be fixed in the hollow of plinth and one ft. thick RCC in ratio of cement sand & stone ballast shall be laid on the top of the plinth. The 12 mm thick plastering shall be done all round the plinth in 1:4 ratio of cement and sand.
Earthing of medium Power Transformers
Net Fencing Shall be 1150*1200 mm made of 35*35 mm MS Angle covered by expended netal 14 SWG up to full Height 1200 mm duly steftened by MS flat by an 8 SWG dia bolt & nut
Providing and Fixing of Cable Jointing Kit I/D & O/D
Fixing of following accessories.
11 KV Disc Insulator with fitting.
11 KV Pin/F Bracket with insulator
Danger Board
Fuse Set
3 Phase Distribution Box
Cutting, chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Installation of following T/F on newly constructed double pole in proper alignment direction & making HT/LT connection.
250 KVA T/F
Re- sagging and stringing of existing Bunch conductor in HT /LT line as per direction of supervising engineer.
Straightening of tilted single PCC Poles in the existing lines as per direction of supervising engineer.
Straightening of tilted single ST Poles in the existing lines as per direction of supervising engineer.
GOSWAMI ENTERPRISES
Bobby Electricals
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .