| Sl No | Description | Qty | Unit | Allwin DumpYard segragation L1 |
|---|---|---|---|---|
| 1.00 | (a) Excavation the existing mixed compacted Garbage which underwent biological degradation in the land portion allocated / earmarked by Thiyagdurgam Town Panchayat Compost Yard and spraying with microbial innoculam for sanitizing and stabilizing the excavated mass sieving them using Mechanical Seiving machine or any other equipment at the cost of the Bidder. b) Stabilization of the open land fill site
(c) Control of mal outdoor using Deodorizing agent and stabilizing the waste using Bio Culture for aerobic composting using industrial sprayer
(d) Eco friendly and non pollution process in order to reduce the impact of dumping site in the adjacent areas
(e) Excavating the soil wich lost its stability due to Garbage Dumping with Necessary Dewatering Works in the portion of the land earmarked
(f) Segregate the excavated garbage in the land portion earmarked, into as many kind and categories as possible at the cost of the Bidder including cost of any power or fuel consumption
(g) Selling, diverting for recycling marketing and recycling the excavated materials with in seven Days of Segregation with out any accumulation in the storage facility at the project site.
(h) Creation and maintenance of infrastructure facilities and amenities at Bidder’s risk and cost, for sieving, the excavated garbage, storing the segregation materials before Selling / Tacking out them from the project site
(i) Deployment of necessary manpower, materials, equipments tools and construction of plants and sheds and creation of facilities for handling, separating, segregation and storing and weighing facilities for the operation of the plant and using only covered body Vehicles for the transportation of Materials.
(j) Create all facilities and Make arrangements for controlling the emission , pollution and contamination of environment including atmosphere, air, water and earth including control of dust and noise pollution. | 1,809 | 1.00 MT (One Metric Ton ) | 665 ₹12,02,985 Lowest |
Tender Value
₹11.5 L
EMD Value
₹11,478
Closing Date
21 Aug 2023, 3:00 pmClosed
Executive Officer
Executive Officer . Manalurpet Town Panchayat
Removal of Historical Garbage Waste Dumped at Solid Wastage Dumping Yard Site By Bio Mining Process in Manalurpet Town Panchayat
2023_DTP_359026_1
489/2022
Open Tender
Civil Works
Works
180 days
Work
Authorised Contractor
3 documents required · 3 mandatory
₹0
₹11,478
Yes
Executive Officer . Manalurpet Town Panchayat
20 Aug 2025
12 Aug 2023
22 Aug 2023
12 Aug 2023
21 Aug 2023
12 Aug 2023
14 Aug 2023
Amount
(a) Excavation the existing mixed compacted Garbage which underwent biological degradation in the land portion allocated / earmarked by Thiyagdurgam Town Panchayat Compost Yard and spraying with microbial innoculam for sanitizing and stabilizing the excavated mass sieving them using Mechanical Seiving machine or any other equipment at the cost of the Bidder. b) Stabilization of the open land fill site (c) Control of mal outdoor using Deodorizing agent and stabilizing the waste using Bio Culture for aerobic composting using industrial sprayer (d) Eco friendly and non pollution process in order to reduce the impact of dumping site in the adjacent areas (e) Excavating the soil wich lost its stability due to Garbage Dumping with Necessary Dewatering Works in the portion of the land earmarked (f) Segregate the excavated garbage in the land portion earmarked, into as many kind and categories as possible at the cost of the Bidder including cost of any power or fuel consumption (g) Selling, diverting for recycling marketing and recycling the excavated materials with in seven Days of Segregation with out any accumulation in the storage facility at the project site. (h) Creation and maintenance of infrastructure facilities and amenities at Bidder’s risk and cost, for sieving, the excavated garbage, storing the segregation materials before Selling / Tacking out them from the project site (i) Deployment of necessary manpower, materials, equipments tools and construction of plants and sheds and creation of facilities for handling, separating, segregation and storing and weighing facilities for the operation of the plant and using only covered body Vehicles for the transportation of Materials. (j) Create all facilities and Make arrangements for controlling the emission , pollution and contamination of environment including atmosphere, air, water and earth including control of dust and noise pollution.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .