| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 LAccepted-AOC BHUNANEHRA HARYANA | ₹1.8 L | L1 | Accepted-AOC OK |
| 2 | L2₹1.8 LRejected-Finance BHUTHAN KALAN | ₹1.8 L | L2 | Rejected-Finance Higher bid |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per notification issued by Haryana Govt Coop Department vide 4728 dated 27/06/2026 |
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
23 Feb 2026, 5:00 pmClosed
BHUPENDER SINGH
DIV 2 Hissar
ANNUAL MAINTENANCE ESTIMATE FOR SEWERAGE SCHEME IN SECTOR 3P-II, FATEHABAD (2025-2026)
2026_HBC_502728_1
20269D775078 CD0E 4343 ACFD 3E44C067F8FE260HSV
Open Tender
Civil Works
120 days
Fatehabad
42/2026
2 documents required · 2 mandatory
₹250
Yes
₹4,000
Yes
17 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
[11.11.1]12 mm cement plaster finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand)
[11.12.1]15 mm cement plaster on rough side of single or half brick wall finished with a floating coat of neat cement of mix : 1. 1:3 (1 cement: 3 fine sand)
[21.93.2]Providing and fixing SFRC MANHOLE COVERS AND FRAMES MARKED WITH IS: 12592 including setting the same to correct lines and levels in 1:3 cement sand mortar over manhole including carriage loading unloading stacking handling re-handling etc. complete in all respects to the satisfaction to the Engineer-in-charge. 2. Type:- Extra Heavy Duty Set (EHD-20) 560MM Clear Opening
[5.25]Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size)
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_581404.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid