Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.4 LAccepted-AOC 1101 A WING SACHDEV COMPLEX JANGAL MANGAL RAOD BHANDUP W MUMBAI 400078 | MUMBAI SUBURBAN | MAHARASHTRA | 400078 | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.3 L+₹48,475 (3.07%)Rejected-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHAITANYA SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | L2 | Rejected-Finance L2 | |
| 3 | L3₹18.1 L+₹2.3 L (14.4%)Rejected-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON WEST MUMBAI 400 104 | MUMBAI | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | sapana enterprises L1 | Shree Ayyappa Engineering L3 | cooltech engineering services L2 |
|---|---|---|---|---|---|---|
| 1.00 | Repair /servicing to transformer at site of capacity 50 KVA to 250 KVA installed indoor/ outdoor by opening top cover & replacing unserviceable spares / components of transformer ,without lifting core assembely reassembling after repair & testing complete all as specified and directed by Engr-in-Charge.
Note
(a) Rewinding of transformer HT/LT Coils shall be carried out from ISO certified 2008 Coy.
(b) Dehyderation and filteration of transformer oil, and replacement of unserviceable spares shall be measured and paid seperately under appropriate Item of schedule however cost of renewal of Nut, bolts & washers and labour for replacement of unserviceable items shall deemed to be included in UNIT RATE QUOATED. | 6 | Each Job | 4,500 ₹27,000 | 4,400 ₹26,400 Lowest | 4,500 ₹27,000 |
| 2.00 | Repair /servicing to transformer at site of capacity 300 KVA to 500 KVA installed on Plinth / Pole mounted structure by opening top cover & replacing unserviceable spares / components of transformer ,without lifting core assembely reassembling after repair & testing complete as all specified and directed by Engr-in-Charge.
Note
(a) Rewinding of transformer HT/LT Coils shall be carried out from ISO certified 2008 Coy.
(b) Dehyderation and filteration of transformer oil, and replacement of unserviceable spares shall be measured and paid seperately under appropriate Item of schedule however cost of renewal of Nut, bolts & washers and labour for replacement of unserviceable items shall deemed to be included in UNIT RATE QUOATED. | 3 | Each Job | 5,900 ₹17,700 Lowest | 6,100 ₹18,300 | 6,000 ₹18,000 |
| 3.00 | Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 350 to 450 KVA, 11/0.433 Volts transformers | 4 | Each | 450 ₹1,800 Lowest | 800 ₹3,200 | 800 ₹3,200 |
| 4.00 | Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 200-250 KVA, 11/0.433 Volts transformers | 4 | Each | 450 ₹1,800 Lowest | 600 ₹2,400 | 800 ₹3,200 |
| 5.00 | Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 160 KVA, 11/0.433 Volts transformers | 4 | Each | 450 ₹1,800 Lowest | 600 ₹2,400 | 800 ₹3,200 |
| 6.00 | Supply only brass spindle on LT side as per existing size, shape and specification for capacity 350 to 450 KVA, 11/0.433 Volts transformers | 4 | Each | 1,250 ₹5,000 | 900 ₹3,600 Lowest | 1,200 ₹4,800 |
| 7.00 | Supply only brass spindle on LT side as per existing size, shape and specification for capacity 200-250 KVA , 11/0.433 Volts transformers | 4 | Each | 1,250 ₹5,000 | 900 ₹3,600 Lowest | 1,200 ₹4,800 |
| 8.00 | Supply only brass spindle on LT side as per existing size, shape and specification for capacity 160 KVA , 11/0.433 Volts transformers | 4 | Each | 1,150 ₹4,600 | 450 ₹1,800 Lowest | 700 ₹2,800 |
| 9.00 | Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 350 to 450 KVA, 11/0.433 Volts transformers | 1 | Set | 350 ₹350 Lowest | 1,400 ₹1,400 | 1,400 ₹1,400 |
| 10.00 | Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 200 to 250 KVA, 11/0.433 Volts transformers | 1 | Set | 350 ₹350 Lowest | 900 ₹900 | 1,200 ₹1,200 |
Tender Value
₹17.9 L
EMD Value
₹35,820
Closing Date
25 Jun 2026, 6:00 pmClosed
CWE (SUBS) MUMBAI
Commander Works Engineer Subs NCHC Powai Bhandup Post Office Mumbai 400 078
REPAIR AND MAINTENANCE OF HT/ VCBs/SF6 TRANSFORMETS AT INS HAMLA
2026_MES_769808_1
8437/E8
Open Tender
Civil Works
Works
335 days
HAMLA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (NW) BHANDUP
₹35,820
25 Sept 2026
4 Jun 2026
27 Jun 2026
4 Jun 2026
25 Jun 2026
18 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repair /servicing to transformer at site of capacity 50 KVA to 250 KVA installed indoor/ outdoor by opening top cover & replacing unserviceable spares / components of transformer ,without lifting core assembely reassembling after repair & testing complete all as specified and directed by Engr-in-Charge.
Note
(a) Rewinding of transformer HT/LT Coils shall be carried out from ISO certified 2008 Coy.
(b) Dehyderation and filteration of transformer oil, and replacement of unserviceable spares shall be measured and paid seperately under appropriate Item of schedule however cost of renewal of Nut, bolts & washers and labour for replacement of unserviceable items shall deemed to be included in UNIT RATE QUOATED. | 6 | Each Job | - | - |
| 2 | Repair /servicing to transformer at site of capacity 300 KVA to 500 KVA installed on Plinth / Pole mounted structure by opening top cover & replacing unserviceable spares / components of transformer ,without lifting core assembely reassembling after repair & testing complete as all specified and directed by Engr-in-Charge.
Note
(a) Rewinding of transformer HT/LT Coils shall be carried out from ISO certified 2008 Coy.
(b) Dehyderation and filteration of transformer oil, and replacement of unserviceable spares shall be measured and paid seperately under appropriate Item of schedule however cost of renewal of Nut, bolts & washers and labour for replacement of unserviceable items shall deemed to be included in UNIT RATE QUOATED. | 3 | Each Job | - | - |
| 3 | Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 350 to 450 KVA, 11/0.433 Volts transformers | 4 | Each | - | - |
| 4 | Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 200-250 KVA, 11/0.433 Volts transformers | 4 | Each | - | - |
| 5 | Supply only Ceramic Bush insulators on LT side as per existing size, shape and specification for capacity 160 KVA, 11/0.433 Volts transformers | 4 | Each | - | - |
| 6 | Supply only brass spindle on LT side as per existing size, shape and specification for capacity 350 to 450 KVA, 11/0.433 Volts transformers | 4 | Each | - | - |
| 7 | Supply only brass spindle on LT side as per existing size, shape and specification for capacity 200-250 KVA , 11/0.433 Volts transformers | 4 | Each | - | - |
| 8 | Supply only brass spindle on LT side as per existing size, shape and specification for capacity 160 KVA , 11/0.433 Volts transformers | 4 | Each | - | - |
| 9 | Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 350 to 450 KVA, 11/0.433 Volts transformers | 1 | Set | - | - |
| 10 | Supply only cork sheet gasket (set of four) for ceramic bushing on LT side as per existing size, shape and specification complete for capacity 200 to 250 KVA, 11/0.433 Volts transformers | 1 | Set | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
Tenderdocus.pdf
Tender Documents • 0.91 MB
BOQ_862068.xls
BOQ • 3.69 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .