Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.3 LAccepted-Finance | ₹39.3 L | L1 | Accepted-Finance LOWER RATE FOUND |
| 2 | L2₹39.3 L+₹1,573.78 (0.04%)Rejected-Finance | ₹39.3 L+₹1,573.78 (0.04%) | L2 | Rejected-Finance HIGHER RATE FOUND |
| 3 | L3₹39.3 L+₹2,360.66 (0.06%)Rejected-Finance 0 12 UTTAR PRADESH | GHAZIABAD | UTTAR PRADESH | 201001 | ₹39.3 L+₹2,360.66 (0.06%) | L3 | Rejected-Finance HIGHER RATE FOUND |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 May 2026, 10:00 amClosed
EO NPP SULTANPUR
EO NPP SULTANPUR
Ward Narayanpur mein Vinod Vishwakarma Ke ghar Ke paas naya tubewell Va pump House ka Nirman karya
2026_DOLBU_1149696_1
15/NPPSUL/2026-27 DT. 10.04.2026
Open Tender
Civil Works
Percentage
90 days
NPP
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
EO NPP SULTANPUR
₹1.2 L
15 Jun 2026
18 May 2026
23 May 2026
18 May 2026
23 May 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Transporation RIG MACHINE Transporation of rig machine including loading unloading erecion dismantling & labour in all respect | |||||
| 2AIR COMPERSSOR Transporation of 600psi compressor including loading unloading erecion dismantling & labour etc complte in all respect | |||||
| 3Q.P. Unit Transporation of 3 cusec OP Unit including loading unloading eretcion dismantling & labour etc complte in all respect | |||||
| 4TUBEWELL ASSEMBLY Transporation of Tube well assembly including loading unloading erecion dismantling & labour etc complte in all respect | |||||
| 5CONSTRUCTION OF TUBE WELL (DRILLING ) AS PER IS 2800(PART I&II) | |||||
| 5.01 | Drilling of Bore
Barricading | - | Job | - | - |
| 5.02 | Logging Bore | - | Job | - | - |
| 5.03 | Drilling of 600mm dia bore from G.L. to 65m BGL | - | Mtr | - | - |
| 5.04 | Drilling of 500mm dia bore from 65m BGL to 100m | - | mtr | - | - |
| 5.05 | Drilling of 500mm dia bore from 101m BGL to 200m | - | mtr | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_2152360.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .