Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC RAMPUR HAZRA LANE BANKURA W B | BANKURA | BANKURA | WEST BENGAL | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.6 L+₹761.54 (0.21%)Rejected-Finance VEER SAVAKAR SARANI BANKURA | L2 | Rejected-Finance Rejected | |
| 3 | L3₹3.7 L+₹1,523.08 (0.42%)Rejected-Finance 334 1 SCHOOLDANGA BANKURA 722101 | BANKURA | WEST BENGAL | 722101 | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | GOENKA ENTERPRISE L2 | ABHIJIT MUKHERJEE L1 | TAPAN KUMAR SARKAR L3 |
|---|---|---|---|---|---|---|
| 1.00 | Labour charges for operation and guarding of Pumping Machinery (Auto Panel) including Operation of Valves, disinfection arrangement, internal & external illuminations etc. and round the clock guarding of the whole installation with all accessories complete by engaiging 1(one) nos operating personnel as per direction of EIC. | 365 | /day | 624 ₹2,27,760 | 622 ₹2,27,030 Lowest | 626 ₹2,28,490 |
| 1.10 | ESIC Contribution of Empleyers | 365 | /day | 15.83 ₹5,777.95 Lowest | 15.83 ₹5,777.95 Lowest | 15.83 ₹5,777.95 Lowest |
| 1.20 | EPF Contribution of Empleyers | 365 | /day | 63.31 ₹23,108.15 Lowest | 63.31 ₹23,108.15 Lowest | 63.31 ₹23,108.15 Lowest |
| 2.00 | Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period. | 12 | /month | 8,680 ₹1,04,160 | 8,678 ₹1,04,136 Lowest | 8,682 ₹1,04,184 |
| 3.00 | Add: 1% Cess | 1 | Item | 3,608.06 ₹3,608.06 | 3,600.52 ₹3,600.52 Lowest | 3,615.6 ₹3,615.6 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
3 Feb 2026, 6:00 pmClosed
Executive Engineer, BMD, PHED
Office of the Executive Engineer. Bankura Mechanical Division. P.H.E. Dte. Ailakundi, PO Kenduadihi, Bankura 722102.
Operation, and Guarding of pumping machineries and others accessories at Jibta and adj. mouzas Ground Water Based Piped Water Supply Scheme Block -Kotulpur under Bankura Mechanical Division, P.H.E. Dte. Block- Indus Dist- Bankura
2025_PHED_981198_114
WBPHED/EE/BMD/NIeT-21 OF 2025-2026
Open Tender
MECHANICAL
Item Rate
365 days
Bankura
Please refer Tender documents.
6 documents required · 6 mandatory
₹8,000
Yes
14 May 2026
16 Jan 2026
6 Feb 2026
16 Jan 2026
3 Feb 2026
16 Jan 2026
Labour charges for operation and guarding of Pumping Machinery (Auto Panel) including Operation of Valves, disinfection arrangement, internal & external illuminations etc. and round the clock guarding of the whole installation with all accessories complete by engaiging 1(one) nos operating personnel as per direction of EIC.
ESIC Contribution of Empleyers
EPF Contribution of Empleyers
Supervision charges for electrical installation by licensed electrician having requisite parts as per IE rules 1956 with latest amendments and overhead expenditures for the above period.
Add: 1% Cess
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.11 MB
Tendernotice_2.pdf
PDF • 0.11 MB
Tendernotice_3.pdf
PDF • 17.35 MB
BOQ_2411436.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .