| Sl No | Description | Qty | Unit | SUDHAKAR L1 | VIHAAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Name of the work : 1. Renewal the Road from Karattupatty-Edayakottai Road Panchayath Limit KM 0/0-1/00 (R-403) Estimate Amounts :22.00 Lakhs | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 1,296 | Sqm | 6 ₹7,776 Lowest | 6.3 ₹8,164.8 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 540 | cum | 140.4 ₹75,816 Lowest | 147 ₹79,380 |
| 4.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 216 | cum | 341.01 ₹73,658.16 Lowest | 358 ₹77,328 |
| 5.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 3,750 | cum | 34.5 ₹1,29,375 Lowest | 36 ₹1,35,000 |
| 6.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 112.5 | CUM | 11,740.83 ₹13,20,843.38 Lowest | 12,327 ₹13,86,787.5 |
| 7.00 | Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc., | 1 | No | 2,197 ₹2,197 Lowest | 2,306 ₹2,306 |
| 8.00 | Supply of HM stone of size 1.65m x 0.45 x 0.15m including all charges etc., | 4 | No | 574.65 ₹2,298.6 Lowest | 602 ₹2,408 |
| 9.00 | Provision for 60 cm Equilateral triangle cautionary Sign Board | 6 | No | 4,999 ₹29,994 Lowest | 5,248 ₹31,488 |
| 10.00 | Provision for Name board | 1 | No | 17,797 ₹17,797 Lowest | 18,686 ₹18,686 |
Tender Value
Refer Docs
EMD Value
₹22,000
Closing Date
24 Feb 2026, 3:00 pmClosed
DRDA Dindigul
DRDA Dindigul
Renewal of 1 no road work in Reddiyarchatram block MGSMT (Additional) 2025-26 in Dindigul District TN0521
2026_RDTN_658270_1
DRDA-1084-Tender21
Open Tender
Civil Works
Works
180 days
DRDA Dindigul
Renewal of 1 no road work in Reddiyarchatram block MGSMT (Additional) 2025-26 in Dindigul District TN0521
2 documents required · 2 mandatory
₹0
₹22,000
DRDA Dindigul
20 Mar 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
20 Feb 2026
Name of the work : 1. Renewal the Road from Karattupatty-Edayakottai Road Panchayath Limit KM 0/0-1/00 (R-403) Estimate Amounts :22.00 Lakhs
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply of Kilometre stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Supply of HM stone of size 1.65m x 0.45 x 0.15m including all charges etc.,
Provision for 60 cm Equilateral triangle cautionary Sign Board
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 0.46 MB
BOQ_789703.xls
BOQ • 0.27 MB
PRICEBIDMGSMT.pdf
PDF • 0.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .