| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-AOC 4 DALURBANDH PANDAVESWAR PANDAVESWAR BARDHAMAN WEST BENGAL 713346 UDYAM WB 03 0006114 | PASCHIM BARDHAMAN | WEST BENGAL | 713346 | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.0 L+₹18,748.22 (2.74%)Rejected-Finance NATUNDANGA BANAGRAM BARDHAMAN 713381 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713381 | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.2 L+₹39,441.88 (5.77%)Rejected-Finance 104 SARAT GHOSH GARD EN ROAD CAL 31 700031 | KOLKATA | WEST BENGAL | 700031 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | MAZUMDER ELECTRICAL L1 | D.P. ENTERPRISE L3 | ENERGY ENGINEERING L2 |
|---|---|---|---|---|---|---|
| 1.00Repairing of 100 Amp, 6.6kv, 3 ph Andrew Yule Make VCB Sl.No- KTD/VCB/015 at Khottadih Colliery . (Inclusive of EPF/CMPF) | ||||||
| 1.01 | Door Mounting Earth Leakage Relay | 1 | nos | 28,000 ₹28,000 Lowest | 29,632 ₹29,632 | 28,722 ₹28,722 |
| 1.02 | CBCT | 3 | nos | 3,000 ₹9,000 Lowest | 3,175 ₹9,525 | 3,077 ₹9,231 |
| 1.03 | Indication | 2 | nos | 725 ₹1,450 Lowest | 767 ₹1,534 | 744 ₹1,488 |
| 1.04 | Supply of HT Bushing | 3 | nos | 2,000 ₹6,000 Lowest | 2,117 ₹6,351 | 2,052 ₹6,156 |
| 1.05 | Supply of HRC fuse for HT PT | 2 | nos | 1,000 ₹2,000 Lowest | 1,058 ₹2,116 | 1,026 ₹2,052 |
| 1.06 | Supply of current Tranformer (CTR+100/5) | 3 | nos | 2,000 ₹6,000 Lowest | 2,117 ₹6,351 | 2,052 ₹6,156 |
| 1.07 | Supply of Ammetre | 1 | nos | 1,200 ₹1,200 Lowest | 1,270 ₹1,270 | 1,231 ₹1,231 |
| 1.08 | Supply of voltmeter | 1 | nos | 1,400 ₹1,400 Lowest | 1,482 ₹1,482 | 1,436 ₹1,436 |
| 1.09 | Supply of incoming & outgoing jumper with socket | 1 | nos | 6,500 ₹6,500 Lowest | 6,879 ₹6,879 | 6,668 ₹6,668 |
Tender Value
₹6.8 L
EMD Value
₹8,600
Closing Date
4 Nov 2025, 6:00 pmClosed
Area Engineer(E and M)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Paschim Bardhaman, West Bengal-713346
Repairing and rewinding of 150/5 A, 6.6 KV, 3 Ph Mine Line Make VCB, Andrew Yule make TSU, Crompton Parkinson make Transformer, Alsthom Make French Motor,12.5 HP, 550 V 3 Ph. 720 RPM Motor and Brown Bravery make Motor of Khottadih Colliery
2025_ECL_346247_1
GM-PND/EandM/25-26/160/867 dated 24/10/2025
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Khottadih Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹8,600
26 Dec 2025
25 Oct 2025
5 Nov 2025
25 Oct 2025
4 Nov 2025
25 Oct 2025
25 Oct 2025 - 28 Oct 2025
Amount
Repairing of 100 Amp, 6.6kv, 3 ph Andrew Yule Make VCB Sl.No- KTD/VCB/015 at Khottadih Colliery . (Inclusive of EPF/CMPF)
Door Mounting Earth Leakage Relay
Indication
Supply of HT Bushing
Supply of HRC fuse for HT PT
Supply of current Tranformer (CTR+100/5)
Supply of Ammetre
Supply of voltmeter
Supply of incoming & outgoing jumper with socket
Supply of core Balace Transformer (CBT)
Supplyof vaccum relay of suitable range
Supply of vaccum contect holder
Repairing /rewinding of PT (3.3KV/110v)
Supply of connector (30 Amps. 12 way)
Supply of Shunt Trip Coil Assy
Supply of of pvc flexible copper wires of suitable grade
Supply of materials for cleaning & de-carbonizing
Supply of PVC adhesive tape, Non-adeshive tape, Mica Tape, HT tape etc
Supply of Paint & thinner and MS nut Bolt
Repairing and testing charges
OH & profit @ 10%
Transporting Charge both side
Repairing & rewinding of 12.5 HP, 550v, 3ph 720 RPM Motor sl.no- M-02 at Khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of super copper enamel wire(material Cost)
Cost of insulation require against copper (25% of copper cost) (Material Cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)(Material Cost)
Cost of winding of motor (20% of copper cost)(labour Cost)
Miscellaneous cost (15% of cost of copper)(Material cost)
Less Scrap value
OH & Profit @ 10%
Transpotation charge (Up & Down)
Repairing & rewinding of 01 Nos. 4.5 HP, 415v, 3ph 1470 RPM Brown Breavery make Motor at Khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of super copper enamel wire(material Cost)
Cost of insulation require against copper (25% of copper cost) (Material Cost)
Labour cost for insulation(15% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)(Material Cost)
Cost of winding of motor (20% of copper cost)(labour Cost)
Miscellaneous cost (15% of cost of copper)(Material cost)
Less Scrap value
OH & Profit @ 10%
Transpotation charge (Up & Down)
Repairing & Rewinding 110 KW, 550v, 3ph 1475 RPM Kirloskar make motor Sl.No- 29303013-1, M-01/51 at Khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of copper superanamel wire(material Cost)
Cost of insulation require against copper (25% of copper cost)
Labour cost for insulation(20% of copper cost)
Cost of striping Motor damaged copper conductor (15% of copper cost)(Material Cost)
Cost of winding of motor (20% of copper cost)(labour Cost)
Miscellaneous cost (15% of copper cost)(Material Cost)
Supply and fitting of N321 no Bearing(Material Cost)
Supply and fitting of N321 no Bearing(Labour Cost)
Supply and fitting of 6321 no Bearing(Material Cost)
Supply and fitting of 6321 no Bearing(Labour Cost)
less scrap value
OH & Profit @ 10%
Transportation charge (Up & Down)
Repairing & Rewinding of 750 kva ,3.3kv/550 v Andrew Yule Make Transwitch unit Sl.No- T-188 at Khottadih Colliery. (Inclusive of EPF/CMPF)
Dismantaning of core & winding from transformer tank
Supply of new electrolyte grade copper strips for primary coils
Cleaning of copper strips of secondry coils with removel of old insulation.
Re-insulation cost of primary & secondry coils with removal of old insulation.
Supply of f-class insulation materials such as glass fiber board face separatore, oil duct etc.
Re-formation of primary and secondry coils (borral type).
Supply of F-class varnish
Supply of thinner
Re-assembly of new coil with inter connetion with copper blazzing , backing /heating properly to improve IR value upto requires level.
Repairing of tap changer switch.
Testing charges of transformer
Less old unused copper stripes burnt primary coil
O.H. & profit @10%
Transportation & handling Charges.
Repairing & Rewinding of 200KVA, 3.3KV/550 V Transformer sl no -122B 117D at Khottadih Colliery. (Inclusive of EPF/CMPF)
Cost of transformer unit taken out from encloser(Labour cost)
Supply of copper conductor for primary side(Material cost)
Supply of copper conductor for Secondary side(Material cost)
Cost of stripping for primary & secondary(Labour Cost)
Cost of insulation of primary & secondary side(material Cost)
Cost of insulation of primary & secondary side(Labour Cost)
Cost of Wooden forma(material cost)
Cost of Wooden forma(Labour cost)
Reformation of primary & secondary coil
Cost of Varnish
Cost of thinner
Painting(inner & outer) both side-2 coat(material Cost)
Painting(inner & outer) both side-2 coat(Labour Cost)
Gaskit & Insulator
Re-assembling the new coil into transfromer heating to improve IR(Material cost)
Re-assembling the new coil into transfromer heating to improve IR(Labour Cost)
Filteration of transfromer oil 550 ltr(Labour Cost)
Less Scrap value
Profit @10%
Transporting Charges
Total impact of GST for the purpose of CTC
ENERGY ENGINEERING (BID ID -1194337)
D.P. ENTERPRISE (BID ID -1194360)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_358920.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .