Loading…
Loading…
Tender ID
Tender Value
₹63,500
EMD Value
₹1,300
Closing Date
13 Apr 2026, 10:00 amClosed
Executive Engineer PMGSY Div. Ang.
Office of Executive Engineer PMGSY Div. Ang. near R and B Complex Khanabal
Pethdiagam to Ganoor Package No.JK01334 Block Anantnag
2026_KSRRD_147200_4
34/PMGSY/ANG/202526/ETendering of Dated 04-04-2026
Open Tender
CIVIL
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Executive Engineer PMGSY Div. Ang.
₹1,300
6 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
13 Apr 2026
6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Edge wall | - | - | - | - |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | - | Cum | 164.22 | - |
| 3 | Providing and Laying of (First Class) bedding/stone soling on well compacted Sand,moorum or approved granular material (bulder) as per clause 1105 (II) Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job. (Finished work to be measured). | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-10 1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). | - | Cum | 5,366.64 | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-15 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). | - | Cum | - | - |
| 6 | Providing and laying in position Reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:M-15 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured).Aproach Slabs over Drain | - | Cum | 6,076.77 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild Steel Bars.Including Loading,unloading,Twisting,Bending,binding, cost and carriage of all material from approved source to site of work complete Job | 1 | Kg | - | - |
| 8 | FORM WORK:-Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns, Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
Including Loading,unloading cost and carriage of all material from approved source to site of work complete Job (Finished work to be measured). | - | Sqm | 0.9 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_229140.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .