Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-Finance | ₹1.5 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.6 LRejected-Finance | ₹1.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹1.6 LRejected-Finance | ₹1.6 L | L3 | Rejected-Finance L3 |
Tender Value
₹1.5 L
EMD Value
₹3,098
Closing Date
16 Jan 2026, 6:00 pmClosed
Panchayat Pradhan Tashiding GP
Tashiding GP Office
Construction of drain for GWM from Binod pradhan house towards Pabitra Rai house sansad ll, at Tashiding GP within Kalimpong-I Dev Block Under 15TH FC (2024-2025)
2025_GTA_978818_3
PP/TSH-KPG-I/eNIT 05/2025-2026
Open Tender
CIVIL WORKS
Tashiding
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,098
Yes
2 Feb 2026
23 Dec 2025
19 Jan 2026
23 Dec 2025
16 Jan 2026
23 Dec 2025
PWD(WB)/BUILDING WORKS(CCS)/Page-1/Item-2 Earth work in excavation of foundation trenches or drains in all sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1.500 mm. .
PWD(WB)/BUILDING WORKS(CCS)/Page-229/Item-12 Laying 150 mm. to 200 mm. boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming.
PWD(WB)/BUILDING WORKS(CCS)/Page-229/Item-11A Cost of stone boulder 150 mm size delivered ans stacked at site.
PWD(WB)/BUILDING WORKS(CCS)/Page-34/Item-22II (II) Cement concrete with 30 mm. down graded shingles excluding shuttering.N.B. VarietyIn ground floor .(a) 1:3:6 proportion.
PWD(WB)/BUILDING WORKS(CCS)/Page-22/Item-44 Rubble masonry in cement (1:6) with hard dressed stones from approved quarries and clean, coarse and washed sand including carriage of all materials to site In Road and Jhora Work
PWD(WB)/BUILDING WORKS(CCS)/Page-42/Item-36 Hire and labour charge for shuttering with centreing and necessary staging up to 4 m. using approved stout props and thick hard wood planks of approved thick ness with required bracing for concrete slabs, beams, columns, lintels curved or staight including fitting fixing and striking out after complection of works. (up to roof of ground floor).(a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
PWD(WB)/BUILDING WORKS(CCS)/Page-189/Item-1 Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/stagin (ii) With 1:4 cement mortar .(a) 20 mm.thick plaster.
PWD(WB)/BUILDING WORKS(CCS)/Page-192/Item-15 Neat cement punning about 1.5mm thick in wall, dado, windowsill, floor etc.NOTE:Cement 0.152 cu.m per100 sq.m.
Please Enable Macros to View BoQ information
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_2385484.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid