| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.0 LAdmitted-Finance | ₹29.0 L | L1 | Admitted-Finance |
| 2 | L2₹30.8 L+₹1.8 L (6.33%)Admitted-Finance | ₹30.8 L+₹1.8 L (6.33%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | RAHUL ELECTRIC ENGGINEERING WORKS L1 | M/S ABID CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.0011/0.4 KV Distribution Transformer Increasing Capacity The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) | |||||
| 1.01 | 250 KVA Distribution Transformer | 10 | No | 2,000 ₹20,000 Lowest | 4,000 ₹40,000 |
| 1.02 | LT XLPE CABLE 3.5x400 Sqmm | 365 | Mtr. | 60 ₹21,900 | 10 ₹3,650 Lowest |
| 1.03 | ABC CABLE 3x120+1x95+1x16 Sqmm | 480 | Mtr. | 20 ₹9,600 | 4 ₹1,920 Lowest |
| 1.04 | 11 KV FUSE SET | 9 | No | 150 ₹1,350 | 100 ₹900 Lowest |
| 1.05 | LINE MATERIAL (Insulator, Disc, X-Arm, Stay Set, Earthing ETC.) | 1 | Quintal | 400 ₹400 | 150 ₹150 Lowest |
| 2.00Complete work of installing the electrical material received from the store center at the site. | |||||
| 2.01 | Complete work of Laying/Installing LT ABC 3x120+1x95+1x16 Sqmm on the Established electric poles installed as per RESPO norms. | 480 | Mtr. | 25 ₹12,000 | 20 ₹9,600 Lowest |
| 2.02 | Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. | 10 | No | 18,000 ₹1,80,000 Lowest | 25,000 ₹2,50,000 |
| 2.03 | Complete work of Installing and Commissioning 250 KVA Distribution Transformer on Established Plinth as per RESPO standards. Inculding Dismantling of 100 KVA distribution transformer installed at site. | 10 | No | 2,500 ₹25,000 | 2,000 ₹20,000 Lowest |
Tender Value
₹38.1 L
EMD Value
₹38,150
Closing Date
3 Jul 2026, 12:00 pmClosed
SE EDC I MZN
H NO 60/168 LAXMAN VIHAR KAMBALWALA BAGH MUZAFFARNAGAR
VARIOUS SITE NEW DOUBLE POLE ERRECTION WORK INCREASING CAPACITY WORK AND TAILLESS UNIT INSTALLATION WORK IN BUSINESS PLAN 2026-27
2026_PVVNL_1156162_3
13/2026-27/EDC-I MZN
Open Tender
Electrical Works
Lump-sum
UNDER THE AREA OF EUDD JANSATH MZN
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE EDC I MZN
₹38,150
14 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
3 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 111/0.4 KV Distribution Transformer Increasing Capacity The work of delivering following material from the Departmental store center to the site in which includes loading and unloading on both sides. (distance 0 to 50 km) | |||||
| 1.01 | 250 KVA Distribution Transformer | 10 | No | 100 | ₹1,000 |
| 1.02 | LT XLPE CABLE 3.5x400 Sqmm | 365 | Mtr. | 100 | ₹36,500 |
| 1.03 | ABC CABLE 3x120+1x95+1x16 Sqmm | 480 | Mtr. | 100 | ₹48,000 |
| 1.04 | 11 KV FUSE SET | 9 | No | 100 | ₹900 |
| 1.05 | LINE MATERIAL (Insulator, Disc, X-Arm, Stay Set, Earthing ETC.) | 1 | Quintal | 10 | ₹10 |
| 2Complete work of installing the electrical material received from the store center at the site. | |||||
| 2.01 | Complete work of Laying/Installing LT ABC 3x120+1x95+1x16 Sqmm on the Established electric poles installed as per RESPO norms. | 480 | Mtr. | 100 | ₹48,000 |
| 2.02 | Complete work of Making New plinth (Size 2x2x1.5 Meter) for 250 KVA Distribution Transformer as per RESPO standards. In which cement, sand and other necessary Decentralized material will be provide by the Contractor/Firm. | 10 | No | 100 | ₹1,000 |
| 2.03 | Complete work of Installing and Commissioning 250 KVA Distribution Transformer on Established Plinth as per RESPO standards. Inculding Dismantling of 100 KVA distribution transformer installed at site. | 10 | No | 100 | ₹1,000 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_2183613.xls
BOQ • 0.32 MB
Tenderform.pdf
Tender Documents • 1.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .