Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹33.7 L
Closing Date
15 Mar 2023, 9:00 amClosed
CGMLPG
2nd Gariahat Road, Indian Oil Bhavan, Kolkata 68
Construction of 3m boundary wall at KGP BP
2023_WBSO_163921_1
KGPBP/2022-23/LT-11
Limited
Civil Works
Works
60 days
Kharagpur BP
Please refer Tender documents.
4 documents required · 4 mandatory
Exempted
24 Mar 2023
10 Mar 2023
16 Mar 2023
10 Mar 2023
15 Mar 2023
11 Mar 2023
Indian Oil Corporation eProcurement portal Created By: Nirmesh Kumar Sinha Created Date/Time: 24-Mar-2023 07:47 PM Tender Title: Construction of 3m boundary wall Tender ID: 2023_WBSO_163921_1
Tender Inviting Authority: CGM(LPG), WBSO
Name of Work: Construction of 3M boundary wall at KGP BP (LT-11)
Tender Ref. No: _KGPBP/2022-23/LT-11 Important Notes: 1. Party should quote by selecting EXCESS or LESS in the dropdown box and thereafter filling the percentage rate in figures only without any condition. In case party is intending to quote “at Par”, party must quote “0” in the space provided. Leaving the designated space for quoting percentage rate blank shall be taken as quoted “at par”. The party in their own interest should tally the quoted rate in words and quoted amount (in figures) which is displayed at the bottom of price bid sheet and calculated as per % rate quoted by the party. Name of bidder must also be provided at appropriate place in price bid.Scanned/Photocopy of Price bid are not acceptable and such bids shall be summarily rejected. BOQ (Bill of Quantity) is to be submitted after making entries in white coloured cells, without changing any format. 2. Scanned/Photocopy of Price bid are not acceptable and such bids shall be summarily rejected. BOQ (Bill of Quantity) is to be submitted after making entries in white coloured cells, without changing any format. 3. Applicable GST will be paid extra
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 Ma Tara Enterprise(GSTN-19AHAPG8560A1ZN) 2856266.30 -18.00 2342138.37 Twenty Three Lakh Fourty Two Thousand One Hundred and Thirty Eight
2.00 nirman enterprise(GSTN-19AEAPM0169A1ZY) 2856266.30 20.00 3427519.56 Thirty Four Lakh Twenty Seven Thousand Five Hundred and Ninteen
3.00 Mrityunjoy Ghosh(GSTN-19BQCPG4965M1ZB) 2856266.30 12.15 3203302.66 Thirty Two Lakh Three Thousand Three Hundred and Two
4.00 GORAKH PRASAD(GSTN-19AJMPP3612L1ZR) 2856266.30 -9.70 2579208.47 Twenty Five Lakh Seventy Nine Thousand Two Hundred and Eight
5.00 MIND CONSTRUCTION(GSTN-19ASTPS6314C3ZB) 2856266.30 -7.95 2629193.13 Twenty Six Lakh Twenty Nine Thousand One Hundred and Ninty Three
Lowest Amount Quoted BY: Ma Tara Enterprise(2342138.37)
BOQ Summary Details Tender Title: Construction of 3m boundary wall Tender ID: 2023_WBSO_163921_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 Ma Tara Enterprise 2342138.37 L1
2 GORAKH PRASAD 2579208.47 L2
3 MIND CONSTRUCTION 2629193.13 L3
4 Mrityunjoy Ghosh 3203302.66 L4
5 nirman enterprise 3427519.56 L5
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .