Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹4.1 L+₹22,749.57 (5.85%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹4.5 L+₹57,898.91 (14.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
21 Sept 2026, 4:00 pmClosed
Executive Engineer Hydraulic Division Gurez
Executive Engineer Hydraulic Division Gurez
Construction of P-Bund near Agriculture Lan of Nasir U Din Lone and others at Daniyioj Achoora Gurez
2026_PWDJK_324811_1
(InFC) E-NIT No 17 of 2026-27 EE-Hyd-Grz-815-21 E-tendering Dated-15-09-2026
Open Tender
Civil Works
Percentage
30 days
Gurez
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
Executive Engineer Hydraulic Division Gurez
₹10,000
Executive Engineer Hydraulic Division Gurez
24 Sept 2026
16 Sept 2026
22 Sept 2026
16 Sept 2026
21 Sept 2026
16 Sept 2026
18 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 2.6.1 All kinds of soil : | 70.65 | Cum | 592.9 | ₹41,888.39 |
| 1.01 | Ordinary Rock | 12.45 | Cum | 940.3 | ₹11,706.73 |
| 2 | Hand-packing stones in wire-crates (BA)incl.cost of stones but exccluding cost of crates. | 175.8 | Cum | 1,071.15 | ₹1,88,308.17 |
| 3 | Supply of 4mm dia BA wire woven crates 4”x4” mesh as per ISI specification .As directed by EIC. | 711.45 | Sqm | 225.96 | ₹1,60,759.24 |
| 4 | Carriage of material by MT incl.loading,unloading and stacking complete job.Crates avg.lead of 90km. | 1.59 | MT | 3,147.78 | ₹5,004.97 |
| 4.01 | Stones avg.lead of 05km. | 175.8 | Cum | 236.16 | ₹41,516.93 |
| 5 | Carriage of material by manual labour incl.loading,unloading and stacking complete job.Crates avg.lead of 100mtr. | 1.59 | MT | 168.01 | ₹267.14 |
| 5.01 | Stones avg.lead of 100mtr. | 175.8 | Cum | 287.48 | ₹50,538.98 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
BOQ_1095954.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .