Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹6.2 L+₹1.8 L (40.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹6.2 L+₹1.8 L (40.4%)Admitted-Fee/PreQual/Technical/Finance CHENNAI | CHENNAI | TAMIL NADU | 600001 | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹6.3 L+₹1.8 L (40.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹6.3 L+₹1.8 L (41.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹7,500
Closing Date
19 Nov 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,WRD
O/o,The Executive Engineer, WRD., Periyar Main Canal Division, Melur.
Maintaining the Vandiyur Children Park in Madurai East Taluk in Madurai District for the year 2026-2027.
2026_WRD_719738_1
06 2026-2027 JDO2 F.105 DATED.29.10.2026
Open Tender
Civil Works
Percentage
150 days
Vandiyur
4 documents required · 4 mandatory
₹0
₹7,500
19 Nov 2026
31 Oct 2026
19 Nov 2026
31 Oct 2026
19 Nov 2026
31 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in all soils except hard rock requiring blasting and conveying earth by deploying earth moving machinery and tippers for formation of bund with a lead of 2KM MR and spreading the unloaded earth at site in layers of not more than 25cm thick, benching of slopes prior to placement of earth fill, breaking clods and compaction of each layer as directed by the engineer in charge of works and as per technical specifications. | 86.93 | Cubic Meter | 81.97 | ₹7,125.65 |
| 2 | Earth work excavating and dopositting on bank with intial lead of 10 m & intial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc., complete complying with standard specification and as directed the Engineer in charge of work. (SS20B For Cut open and Foundation) | 32.77 | Cubic Meter | 147.02 | ₹4,817.85 |
| 3 | Supplying and filling with M Sand of each layer not more than 15 cm thick including consolidation etc complete as directed by the Engineer in charge of works and as per the technical specifications etc complete as per specification | 6.9 | Cubic Meter | 1,924.45 | ₹13,278.71 |
| 4 | Providing and placing Plain Cement Concrete M10 grade using crusher broken hard coarse aggregate (well graded) of nominal maximum size of 40mm and downgraded to I.S specified grading (To achieve the specified characteristic strength of 10N/mm2 in 28 days) and mixing the ingredients in approved mixer including dewatering of the placement site by baling / pumping and diverting wherever necessary, placing concrete in layers, water curing, finishing the surface with all leads and lifts etc., complete as directed by the Engineer in charge of works and as per the technical specifications. | 3.57 | Cubic Meter | 5,833.7 | ₹20,826.31 |
| 5 | Cement concrete of grade M15 design Mix with well graded aggregates and the nominal maximum size of coarse aggregate of graded mix using 40% quantity of 20mm size hard broken granite stone jelly and 60 % quantity of 40mm and downgrade to I.S. specified grading mixing in mixer machine (to produce concrete of the specified characteristic strength of 10N/mm2 at 28 days) including dewatering the placement site laying Vibrating, compacting and finishing the surface with all leads and lifts watering, curing complete so as to attain the profile and strength specified in the drawing and specification for various height above ground level complete as directed by the Engineer complying with standard specification.1.50m BG.L to 1.0m AGL | 32.52 | Cubic Meter | 6,425.52 | ₹2,08,957.91 |
| 6Supplying and erecting STEEL CENTERING for sides and soffits including supports and strutting upto 3.29m height for plane surfaces as detailed below in all floors with all cross bracings using mild steel sheet of size 90cm x 60cm B.G.10 stiffened with welded M.S.angle of size 25x25x3mm for boarding laid over silver oak (country wood) joists of size 10cmx6.5cm spaced at about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre at suitable intervals etc. complete in all floors complying with standard specification.(The payment for centering shall be made only after the concrete is laid.The retrieved materials should be taken back by the contractor) (TNBP No.30 & 44-H) | |||||
| 6.01 | without strutting | 38.22 | Square Meter | 990.95 | ₹37,874.11 |
| 6.02 | with strutting | 59.72 | Square Meter | 1,098 | ₹65,572.56 |
| 7 | Supplying and laying TAMIN paver block of 60 mm thick, the cost include Base cushion of 10 cm depth transporting charges etc., complete with std specification. | 87.7 | Square Meter | 1,610.85 | ₹1,41,271.54 |
| 8 | Cleaning the debris and waste material from the channel and conveying and dumping the low laying areas, complete as directed by the departmental officers, using Backhoe Loader | 6 | Day | 6,899.2 | ₹41,395.2 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
document9.pdf
Tender Documents • 0.65 MB
BOQ_864338.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .