Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-AOC REDDIPATTY NAMAKKAL | NAMAKKAL | NAMAKKAL | TAMIL NADU | ₹11.3 L | L1 | Accepted-AOC Accept |
| 2 | L2₹11.4 L+₹11,235.47 (0.99%)Rejected-AOC | ₹11.4 L+₹11,235.47 (0.99%) | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | harishwar L1 | Mahamani T L2 |
|---|---|---|---|---|---|
| 1.00Construction of 30000 Lit OHT 7.50 Stage at Pottirettipatti HO Pottirettipatti AT Erumapatti BLOCK IN NAMAKKAL DISTRICT UNDER Pooled Assigned Revenue 2025 2026 | |||||
| 2.00Earthwork excavation and dwposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | |||||
| 3.00 | First depth of 2 M | 55.02 | cum | 260 ₹14,305.2 Lowest | 350 ₹19,257 |
| 4.00 | Second depth of 2 M | 6.35 | cum | 275 ₹1,746.25 Lowest | 450 ₹2,857.5 |
| 5.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | 4.23 | cum | 5,249.41 ₹22,205 Lowest | 6,000 ₹25,380 |
| 6.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 0.39 | cum | 7,273.29 ₹2,836.58 Lowest | 8,000 ₹3,120 |
| 7.00 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 0.8 | cum | 6,556.46 ₹5,245.17 Lowest | 6,556.46 ₹5,245.17 Lowest |
| 8.00RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | |||||
| 9.00 | For items 1.5 M to 4.5 M below GL | 3.64 | cum | 9,138.73 ₹33,264.98 Lowest | 9,138.73 ₹33,264.98 Lowest |
| 10.00 | For items 0 to 1.50 M below GL | 1.44 | cum | 8,997.66 ₹12,956.63 Lowest | 8,997.66 ₹12,956.63 Lowest |
Tender Value
₹11.5 L
EMD Value
₹11,500
Closing Date
20 Feb 2026, 3:00 pmClosed
Block Developement Officer, Erumapatti
Block Developement Office, Erumapatti
Construction of 30000 Lit OHT 7.50 Stage at Pottirettipatti HO Pottirettipatti AT Erumapatti BLOCK IN NAMAKKAL DISTRICT UNDER Pooled Assigned Revenue 2025 2026
2026_RDTN_658131_1
A2/355/2026
Open Tender
Civil Works - Water Works
Item Rate
180 days
Block Developement Office, Erumapatti
required Document
3 documents required · 3 mandatory
₹0
₹11,500
Yes
3 Sept 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
20 Feb 2026
14 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 30000 Lit OHT 7.50 Stage at Pottirettipatti HO Pottirettipatti AT Erumapatti BLOCK IN NAMAKKAL DISTRICT UNDER Pooled Assigned Revenue 2025 2026 | - | - | - | - |
| - | Earthwork excavation and dwposition on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by Board officers.Hard stiff clay, block cotton, hard red earth, shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B | - | - | - | - |
| - | First depth of 2 M | 55.02 | cum | - | - |
| - | Second depth of 2 M | 6.35 | cum | - | - |
| - | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for fooundation including the cost of mixing concrete, ramming, curing etc., complete as directed by Board officers. | 4.23 | cum | - | - |
| - | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 0.39 | cum | - | - |
| - | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 0.8 | cum | - | - |
| - | RCC 1:11/2:3 using 20mm HBG Metal excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing | - | - | - | - |
| - | For items 1.5 M to 4.5 M below GL | 3.64 | cum | - | - |
| - | For items 0 to 1.50 M below GL | 1.44 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_789486.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
1.pdf
Tender Documents • 0.68 MB
BOQ_789486.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .