Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 LAccepted-AOC 2 NEAR ASHOKA PLAZA DELHI ROAD ROHTAK ROHTAK HARYANA 124001 | ROHTAK | HARYANA | 124001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.0 L+₹36,104 (13.9%)Rejected-Finance 18 MAIN MARKET SECTOR 13 KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.3 L+₹70,904 (27.3%)Rejected-Finance MODEL TOWN 104 RL MODEL TOWN REWARI 123401 | REWARI | REWARI | HARYANA | 123401 | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹6,080
Closing Date
21 Jan 2021, 5:00 pmClosed
R. Nagender Singh
XEN (E) Rewari
Construction of Third Floor over existing in Judicial Complex at Rewari in Distt. Rewari _Pdg. LAN
2021_HRY_154916_1
PWD/Rewari/jan09
Open Tender
Electrical Works
Works
90 days
XEN (E) Rewari
Refer DNIT
2 documents required · 2 mandatory
₹500
₹6,080
23 Aug 2021
5 Jan 2021
22 Jan 2021
5 Jan 2021
21 Jan 2021
5 Jan 2021
Amount
Supply, Erection, testing and commissioning of Face Plate (Single/Duel) Make:D-LINK/AMP/MOLEX-
Supply, Erection, testing and commissioning of I/O Box complete in all Respect Make:D-LINK/AMP
Supply, Erection, testing and commissioning of UTP cat-6A mounting patch cords 3ft Lengtgh Make-AMP/D-LINK/R&M
Supply, Erection, testing and commissioning of UTP cat-6A mounting patch cords 7ft Length Make-AMP/D-LINK/R&M
Supply, Erection, testing and commissioning of 9U Rack Including Poer kit. Make: Comrack/D-link
Supply, Erection, testing and commissioning of 24 Port jack panel Cat-6A with cable manager Make:W-BOX/Molex/D-link
Supply Installation Testing & Commissioning of 24 Port 10/100/1000 Base-T, 2 x 10G SFP+ loaded with 2 x 1G modules, 1 x 10/100Base-T out of band management port,1 x Serial Console Port RJ-45 , Switch should support stacking up to 4 switches,Switch should have switching fabric performance of minimum 88Gbps switch fabric.Switch should have forwarding rate of 65 Mpps .Switch should have 16K MAC entries, Should support internal / external redundant PSU, Switch should have Operating temperature: (0°Cto 50°C) Make : Extreme - 210-24TGE2 / Cisco - WS2960X-24TD-L / Allied Telesis-GS924MX / Juniper- EX-3300-24T
Supply Eriction Testing and Commissioning Single Phase 240volt AC 1KVA UPS Make-Microtech/APC/Libert
Supply Eriction Testing and Commissioning of 25MM Pvc conduit pipe required to complete with job in all respect up to entire satisfaction of engineer in: charge of work make-AKG/D-PLAST
Supply Eriction Testing and Commissioning of 4 Pair.Cat 6A UTP Cable for data & voice points roll as required as per specification make-D-link/AMP/R&M
Annual Maintenance charges for above said LAN system after expiry of 1-year warrantee period complete with all labour & material required to complete the job in all respect upto the entire satisfaction of the Engineer-in-Charge For 1st year after guarantee and free mtc. period
For 2nd year
For 3rd year
For 4thyear
For 5thyear
Electrocare Systems and Services
P P ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .