Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.4 L+₹2,439.43 (1.01%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹2.5 L+₹4,878.86 (2.02%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹5,940
Closing Date
11 May 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_309050_15
2ND TIME e-NIT No. 08 REW UDHAMPUR of 2026-27 Dated 29-04-2026
Open Tender
Civil Works
Percentage
30 days
XEW REW UDHAMPUR
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹5,940
18 May 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. (in-stretches). | 1.36 | cum | 479.3 | ₹651.85 |
| 2 | Providing and lying in position dry graded crushed stone aggregates 40mm size.excluding the cost of centring and shuttering all work upto plinth Level (in-stretches) | 4.38 | cum | 1,281 | ₹5,610.78 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:3:6 MIX. Including 30% stone filling.(IN-Stretches). | 7.25 | cum | 5,733.6 | ₹41,568.6 |
| 4 | Structural Steel Work In Built IN TUBULAR SECTIONup sections,truses and framed work including cutting hoisting ,fixing in position and applying apriming coat of approved steel primer all complete. | 450 | kg | 156.95 | ₹70,627.5 |
| 5 | P/L IN POSITION CHEQUERED TILE | 41.82 | cum | 1,150 | ₹48,093 |
| 6 | Cetring and shuttering including strutting, propping etc and removal of the formwork. Edges of slab | 62.45 | cum | 286.35 | ₹17,882.56 |
| 7 | P/F C.G.I SHEETROOFING INCLUDING VERTICAL /CURVED SURFACE WITH POLYMER COATED J OR L HOOKS ,BOLTS &NUTS 8MM DIA.WITH BITUMIN &G.ILIMPET WASHERS OR WITH G.I LIMPET WASHERSFILLED WITH WHITE LEAD,INCLUDING ACOAT OF APPROVEDSTEEL PRIMR ANDV TWO COATS OF APPROVED PAINTON OVERLAPPING OF SHEETS COMPLETEANY PITCH HORIZONTAL/VERTICALEXCLUDING THE COST OF PURLIN ,RAFTER &TRUSES&INCLUDING CUTTINGTO SIZE &SHAPE WHWEREEVER0.50MM THICKWITH ZINC COATING | 41.82 | cum | 852.5 | ₹35,651.55 |
| 8 | P/F G.I CHAIN LINK FABRIC FENCING OF REQUIRED WIDTH IN MESH SIZE 50X50MM INCLUDING STRENGTHNING WITH 2MM DIA WIRE OR NUTS ,BOLTS AND WASHERS AS REQUIRED COMPLETE | 74.35 | cum | 809.9 | ₹60,216.06 |
| 9 | Add cost of CIB | 1 | no. | 2,000 | ₹2,000 |
| 10 | Carriage of construction material(sand) 25 KM MT | 8.03 | cum | 465.14 | ₹3,735.07 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BOQ_1000782.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .