| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAdmitted-Finance | ₹2.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.7 Cr+₹23.2 L (9.46%)Admitted-Finance | ₹2.7 Cr+₹23.2 L (9.46%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | EISHEN ENTERPRISES L1 | cmplus power & infra pvt ltd L2 |
|---|---|---|---|---|---|
| 1.00Poles and Stay Arrangement | |||||
| 1.01 | Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF@14 per Km | 508 | Nos | 16,000 ₹84,53,120 | 15,449.65 ₹82,40,842.04 Lowest |
| 1.02 | Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @6 per Km | 127 | Nos | 20,000 ₹26,41,600 | 18,817.5 ₹25,09,314.26 Lowest |
| 1.03 | Stay arrangement for 7M/8M steel poles | 317 | Nos | 3,000 ₹9,70,020 Lowest | 4,825 ₹15,29,525 |
| 2.00Installation Accessories & Fixtures for ADSS OF Cable: | |||||
| 2.01 | Formed OFC Dead End & Termination fittings: conveyance of all materials and in | 476 | Nos | 2,900 ₹14,49,420 | 2,895 ₹14,46,921 Lowest |
| 2.02 | OFC Suspension fittings | 159 | Nos | 2,500 ₹4,17,375 | 2,460.75 ₹4,10,822.61 Lowest |
| 2.03 | DemountablePulley–1Set | 5 | Nos | 1,500 ₹7,875 | 1,495.75 ₹7,852.7 Lowest |
| 2.04 | Adjustable Cable Storage Bracket | 17 | Nos | 1,500 ₹26,775 | 1,495.75 ₹26,699.18 Lowest |
| 2.05 | FDMS Type-III | 12 | Nos | 14,000 ₹1,76,400 | 12,545 ₹1,58,067 Lowest |
Tender Value
₹2.8 Cr
EMD Value
₹6.9 L
Closing Date
9 Jul 2024, 11:00 amClosed
AGM (MM)
O/o CGMT, NE-II Circle BSNL Dimapur
Price bid for procurement and ADSS OFC construction work on Turnkey basis in BSNL MNP BA
2024_BSNL_196463_1
NE2CO-23/17(11)/1/2024-CFA-ZIV
Open Tender
OFC Laying Works
Works
180 days
BSNL Manipur BA
Please refer Tender documents.
27 documents required · 27 mandatory
₹2,500
Yes
AO (Cash), O/o CGM NE-II Circle, Dimapur
₹6.9 L
Yes
23 Aug 2024
4 Jun 2024
10 Jul 2024
4 Jun 2024
9 Jul 2024
4 Jun 2024
4 Jun 2024 - 11 Jun 2024
Amount
Poles and Stay Arrangement
Galvanized steel poles of tubular in design and swaged of the length 7 meters, with top cap welded and lightning spike and including MUFF@14 per Km
Galvanized steel poles of tubular in design and swaged of the length 8 meters, with top cap welded and lightning spike and including MUFF @6 per Km
Stay arrangement for 7M/8M steel poles
Installation Accessories & Fixtures for ADSS OF Cable:
Formed OFC Dead End & Termination fittings: conveyance of all materials and in
OFC Suspension fittings
DemountablePulley–1Set
Adjustable Cable Storage Bracket
FDMS Type-III
Joint Closure Kits(24F ADSS)
Down Lead Clamp
Jumper Cable Clamp
Pig Tail 20M FCPC
Spare OF cable Box
Services inclusive of all of the following:
Erection of 7 m / 8m poles including excavation, Construction of RCC foundation for mounting/erecting the poles/fixing of MUFF concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint
Slinging / Laying and splicing of ADSS / AOF including fixing of installation accessories and fixtures etc. Splicing & Jointing of Optical Fibre Cable, Link Testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable / AOF Cable and accessories from BSNL’s Store Depot.
Installation of spare OF cable box, FDF and WSC, leading-in arrangement, jointing of Pig Tails and all other related activates for construction of ADSS /Aerial OFC route.
Optional Requirements
Construction of Joint Chambers of bricks, supply & Fixing of GI Pipe and PLB pipe for bringing down the OF Cable, supply of stone slab for covering the Chamber and sand for filling the chamber.
Coil earthing of poles
Laying of PLB pipes at appropriate depth, laying and splicing of underground OF cable
Laying of underground OF cable inside PLB Pipe / DWC Pipe, Concreting work on PLB Pipe / DWC Pipes including supply of cement, concrete and curing etc., laying and splicing underground OF cable along bridges, culverts etc.
Laying of OF Cable in PLB Pipe with protection of GI pipe/DWC pipe suspended by means of clamps outside the parapet wall of bridge including supply & fixing of clamps and associated work.
Supply of DWC pipe (63/51 mm)
Supply of GI Pipes 65 mm OD/Class-2
cmplus power & infra pvt ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 7.42 MB
BOQ_215003.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .