Loading…
Loading…
Tender Value
₹4.3 Cr
EMD Value
₹8.5 L
Closing Date
28 Sept 2026, 3:00 pmDue tomorrow
EXECUTIVE ENGINEER CD-VIII
OFFICE OF THE EXECUTIVE ENGINEER CD-VIII IFC DEPTT. SECTOR 15 ROHINI DELHI
Demolishing and Re-Construction of Badwali Chaupal at Village Sultanpur Dabas in Bawana AC-07 New Delhi.
2026_IFC_298723_1
EE/CD-VIII/NIT/2026-27/46
Open Tender
Civil Works
Percentage
545 days
DELHI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8.5 L
21 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. | 105 | Cum | 3,559.03 | ₹3,73,698.15 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar | 85 | Cum | 2,064.71 | ₹1,75,500.35 |
| 3 | Dismantling stone slab flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 metres lead. | 212 | Sqm | 267.04 | ₹56,612.48 |
| 4 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 21 | Cum | 2,439.59 | ₹51,231.39 |
| 5 | Demolishing mud phaska in terracing and disposal of material within 50 metres lead. | 32 | Cum | 916.3 | ₹29,321.6 |
| 6 | Disposal of building rubbish / malba / similar unserviceable, dismantledor waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 243 | Cum | 264.52 | ₹64,278.36 |
| 7 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead :Of area 3 sq. metres and below | 15 | Each | 368.01 | ₹5,520.15 |
| 8 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.. All Kinds of soil. | 929 | cum | 177.89 | ₹1,65,259.81 |
| 9 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m : All kinds of soil. Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 20 | Mtr | 352.92 | ₹7,058.4 |
| 10 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 441 | Cum | 127.08 | ₹56,042.28 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.59 MB
Tendernotice_2.pdf
PDF • 0.26 MB
BOQ_398443.xls
BOQ • 0.54 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .