Tender Value
₹11.1 Cr
EMD Value
₹22.3 L
Closing Date
24 Jun 2026, 2:00 pm
CTR (P) for a length of 60.902kms by PQRS / SQRS and 1.803kms by manual in SSE/Pway/VPT & TN sections.
MDU-W-07-2026-10
MDU-W-07-2026-10
Open
10 Months
Unknown (Unspecified Location)
₹0
₹22.3 L
2 Jun 2026
2 Jun 2026
10 Jun 2026
2021 of Madurai Division)
Item- 1 SW I A- CTR (P) for a length of 60.902kms by PQRS / SQRS in SSE/Pway/VPT & TN sections.
S No. Item Description of Item Unit Qty Rate Amount
Pulling & positioning of rails accurately on cess
including supporting rails, providing required
gap and squaring at ends for renewal
preparation, as directed by Engineer in-charge.
Dismantling and removing rail of all section &
length from track, laid on any type & density of
sleeper by removing fish plates, fastenings &
fish bolts and other materials including stacking
all released materials within an average
distance of 500 metres as directed by Engineer
in-charge. Note: 1.Cutting of rails shall be paid
separately. 2.Work to be done under traffic
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Insertion of rails of all types & length in track,
laid on any type & density of sleeper to the
specified gauge under traffic block. Rates
include fastening of rail with sleepers with
standard set of fastenings and fixing of fish
plates and bolts or, if required, providing gap
for welding and stacking of released material
without infringement within 250m as directed
by Engineer-in-Charge. Note: Rail drilling and
cutting to be paid separately.
Through Sleeper Renewal (TSR) with PSC
sleepers involving removal existing sleepers of
any type along with fittings from track,
insertion of PSC sleepers lying along the cess /
formation / slope / toe within 5 metres height
with all fittings to specified spacing, gauge and
squareness, one round of through packing to
make track fit for 20 kmph speed, dressing of
ballast to standard profile, all in accordance
with the latest provisions of IRPWM and
stacking of all released material neatly at
specified places within an average lead of 100
m as directed by Engineer in-charge.
4 062013 For PSC wider base sleepers - For location of Each 2000.00 398.24 796480.00
work not involving deep screening
5 063090 Lubrication of ERCs and its liner contact area by ERC 8000.00 6.54 52320.00
removal of ERCs and Metal / GFN liners in rail
panel, cleaning of rust / scale of ERC, Metal /
GFN liners & SGCI insert by using wire brush,
scrapper / sand emery paper etc supply and
application of graphite grease, as prescribed by
Railway for under side of liners & corresponding
area of rail foot & SGCI insert with ERCs and re-
fixing the same as per procedure prescribed in
latest edition of IRPWM with contractors grease
and all other tools & plants complete and as
directed. Note: Each ERC in this item shall
constitute 1 ERC and its Liner Contact area.
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
7 083030 Boxing and profiling of ballast as per procedure TRM 60902.00 29.22 1779556.44
prescribed in latest edition of IRPWM including
cess dressing on both sides of track. The work
will include removing excess ballast from track
and putting the same in crib and shoulder by
leading to a maximum of 50m including
crossing of track, deweeding on ballast section
etc and as directed by Engineer-In charge.
Providing Caution Watchman at a location
where caution order is imposed and ensuring to
be on continuous vigil and exhibit necessary
hand signals to the trains for their passage over
caution spot. Note: 1) Prescribed protection
equipment shall be supplied by Railways and
the same shall be returned after work is over.
2) If Contractor fails to post watchman at any
time during one day, penalty at double the
accepted rates will be levied and 3) The
watchman nominated by the contractor will be
screened for suitability as per Railway norms.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
9 135020 Providing temporary Buffer Rails of fish plated Set 10.00 9752.96 97529.60
joints of 3 pairs, measuring 6.5m each, duly
removing rails of the existing track including
cutting & drilling of rails as required for
isolating LWR/CWR on all types of track
structure. Work will be done under traffic block
condition. Note: 1.Each set comprises of 3 pairs
of rails 6.5 m long only. 2.Only Rails fish plate
and fish bolts will be supplied free by Railway
within free lead of 250m.
Painting 2 coats to various P.Way Reference
Post, Structures etc. with enamel paint of
approved make with 2 coats of different colours
& letters, as directed by Engineer in-charge.
11 151020 Assembling of 13m / 12.6m long track panels in TRM 160.00 43.81 7009.60
PQRS Depot by spreading PSC sleepers already
unloaded and stacked, to correct spacing as per
specified sleeper density per km, using
Railway's portal crane, placing service rails on
them and fixing rails to sleepers with standard
fastening properly to get correct gauge with all
contractor's labour, tools, plants etc.
12 151030 Loading pre-assembled panels with PSC TRM 160.00 6.31 1009.60
sleepers in layers on BFR with Railway's Portal
Crane in PQRS Depot, complete in such a
manner that it may be dispatched in train
formation to mid section, as directed by
engineer in-charge.
13 151040 PQRS: Pre Block activity: Removing of the TRM 60902.00 36.02 2193690.04
existing ballast from crib portion of the full
length of existing PSC sleeper and further up to
the bottom of sleepers to accommodate new
sleeper and dumping the ballast so removed on
the shoulders/cess with contractor own labour,
tools and plants etc, complete with all lead and
lift and as directed by the Engineer-in-charge at
site including crossing of track wherever
14 151050 PQRS: During line block activity: Dismantling TRM 60902.00 45.79 2788702.58
existing track, levelling disturbed and uneven
surface of bed up to bottom of sleeper, Loading
the released panels in to BFR with Railway's
portal cranes, Placing new panels from BFRs on
to track with Railway's portal crane, Linking of
Track with all fittings, placing ballast as
required in crib and shoulders, aligning and
surfacing of track, attending track parameters
and initial packing to track to allow traffic at
restricted speed of 20 kmph with contractor's
labour, tools etc, complete and lead & lift as
directed by the Engineer-in-charge at site
including crossing of track wherever necessary.
Note: The PQRS cranes with fuel and operators
will be provided by Railway.
15 151060 PQRS: Post Block activity, Pulling back the left TRM 60902.00 24.19 1473219.38
over ballast from shoulders/cess in to track and
dumping in cribs and shoulders, regulating and
boxing with available ballast to facilitate
surfacing of track during lifting with contractors
own labour, tools etc, complete and lead & lift
as directed by the Engineer-in-charge at site
including crossing of track wherever necessary.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Unloading of released track panels consisting of
all types of rails & sleepers from Railway wagon
at PQRS Depot, using portal cranes including
dismantling of released panels to rails, sleepers
& fastenings and stacking them material-wise
and classification-wise at nominated locations
within the yard limits with all leads, lift and
crossing of tracks.
16 151071 With Railway's portal crane for PSC sleeper TRM 160.00 70.64 11302.40
17 151110 Laying of auxiliary track with all types of rails, TRM 63402.00 48.81 3094651.62
already available on cess, fixing rails on
wooden blocks / CST-9 pots at 2m interval, true
to square, to required alignment & level, fixing
with spikes / screws / keys, linking rails with fish
plates, bolts & nuts to a gauge of 3400mm
(with reference to centre line of existing BG
track), levelling both the rails to same plane as
that of BG track over stone ballast by way of
removing ballast from shoulders of existing
track, providing one round of packing.
Subsequently, dismantling auxiliary track after
completion of PQRS work at site by way of
removing wooden blocks / CST-9 pots and
carrying same to next stretch / location, if
required, where auxiliary track has to be laid
and spreading the same at required locations
and leaving rails there itself for carrying out
TRR work later.
In PQRS work, through rail renewal of BG track
on PSC sleepers of any density with all types of
rails / rail panels lying in auxiliary track or on
cess for replacement of service rails including
handling of rails by way of dragging, pairing
etc. and leading released service rails to load
into BFR / Lorry or to shift to next location
including crossing of track with lead & lift and
any other incidental works as required.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Carrying out pre-tamping, during tamping and
post-tamping work for tamping track with all
types of rails, sleepers & sleeper density by
various Track Tamping machines, like
CSM,DUO/3X Machines which include : (1) Re-
adjustment of ballast, heaping-up of ballast,
filling-up of cavities in tamping zone by picking
ballast from stacks / shoulders / crib of
adjoining track up to lead of 50 m to ensure
effective packing; (2) Clearing of ballast on
sleepers to make them visible to operator, (3)
Clearing of ballast over rail foot to facilitate
holding of rail by rollers of TTRM; (4) Digging,
screening and replenishment of ballast at mud
pumping / rounded ballast in sleeper crib
location; (5) Tightening of loose fittings
immediately before & after tamping; (6)
Replacement of broken / missing fittings
supplied by Railway; (7) Correcting displaced
sleepers to position along with squaring; (8) Re-
setting of worked-out / fallen fittings. (9)
Removing and re-fixing joggled fish plates &
wooden blocks, wherever necessary; (10)
Manual consolidation of ballast in crib /
shoulders; (11) Removing and refixing of
traction bonds during the block in electrified
sections (12) Dressing of ballast Note: 1.
Tamping blocks are not identical & it may be
given at any time either during day or night. 2.
Stages of payment a) 30% of the rate will be
paid on completion of pre tamping attention, b)
Balance 70% of the rate will be paid on
completion of post tamping. 3. Recovery at the
rate of twice the above applicable rate will be
effected in case contractor fails to carry out
pre/during/post operation. 4.Payment shall be
made only once in irrespective of numbers of
TTRM packing round and after restoration of
normal speed and restoration of complete
ballast profile.
Pre, during & post tamping operations, for
tamping of track on level crossing portion on all
types of track structure and density, during
traffic block, duly opening the road surface by
digging up to the required width and up to
50mm below bottom of sleeper to facilitate
tamping, removing and refilling ballast,
adjustment of deficient ballast if necessary by
picking from adjoining track/shoulder/cribs,
removing and refixing all inter locking gears
interfering, removing and re-fixing of check
rails and painting of running rail & check rail
with coal tar emulsion, completing road surface
to smooth motorable condition after tamping is
over, including tightening of loose fittings,
replacement of broken/missing fittings,
correction of displaced sleepers to correct
position and as directed by Engineer in charge.
20 155022 Level crossing with CC block surface Sqm 5472.00 385.14 2107486.08
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Providing lighting arrangements with halogen
lamps on and around machine during machine
working in night time blocks, with contractor's
generator, consumables, all necessary
electrical fittings, operators etc. Note: 1.
Lighting arrangement is to be provided as per
advance planning of Night Blocks and written
communication. 2. In case lighting arrangement
is made available but not used due to non-
availability of block, payment @ 60% of the
item rate shall be made. 3. In place of Halogen,
LED lamps of equal lumen capacity may be
used with the approval of Engineer -in-Charge.
4. If lighting arrangement fails during block,
recovery shall be made twice the rate per day.
generator and 8x500 W)
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete as
directed by Engineer in-charge. Abrasive Rail
Cutter will be as per RDSO Specification No.
TM/SM/1 (Rev. 01 of 2012) with latest status of
RDSO; Rail Cutting Wheel Abrasive Disc will be
as per RDSO Specification No.TM/SM/2 (Rev. 01
Drilling holes of 16 mm to 32 mm dia. with Rail
Drilling machine including chamfering with
appropriate chamfering tools in all types of rail
section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
25 161050 Drilling holes of specified size for bond holes Each 2437.00 53.93 131427.41
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in charge
Loading of rails of any section and length up to
13 metres in Wagons / Truck / trailer including
lead up to 50 metres and lift up to 5 metres.
26 171014 I n Wagon where mechanical handling is MT 319.00 165.78 52883.82
possible and traffic block is not required or in
Unloading of rails of any section and length up
to 13 metre, in neat manner for Railway usage
from departmental material train (DMT) or
contractor's / Railway's Truck/trailer including
lead up to 50 metre, lift up to 5 metre and
stacking in prescribed manner.
27 171053 From Wagon where mechanical handling is MT 319.00 121.63 38799.97
possible and traffic block is not required or in
Truck / trailer.
Unloading of all type of rails of length 130
metre and beyond from end unloading rake and
keep the panels in head-up position at specified
distance from centre of track clear from any
infringement.. Note: Contractor has to keep
Oxygen and Acetylene gas with cutter as
standby during the period of work.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
m a t e r i a l except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall be
the shortest motorable road length between the
points of loading and unloading.
32 172048 Extra for every Km per MT beyond 150 Km over MT-Km 239810.00 3.30 791373.00
item no. 172047
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1 . Lead shall
be the shortest motorable road length between
the points of loading and unloading. 2. Loading
and unloading shall be paid extra under
relevant items.
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery, consumables
etc. Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
Overhauling of level crossing by digging out up
to 50mm below sleeper, screening of shoulder
& crib ballast, replacing unserviceable sleepers
& fastenings as necessary, removal of check
rails for examination of running rails and check
rails, scrapping of rails and painting running
rails and check rails and all fixtures with two
coats of coal tar emulsion, greasing of ERCs,
MCI inserts and liners oiling all the bolts,
correcting cross level, gauge, alignment,
surfacing and packing etc., re-fixing check rails
duly ensuring standard clearances, re-inserting
screened ballast, making good deficient ballast
with Railway's ballast from stacks /
heaps/borrowing from adjacent length of
adjoining track within 50m lead, ramming &
levelling road surface and refixing concrete
slabs/making motarable road surface as
required excluding re surfacing with bitumen as
directed by Engineer in-charge.
37 182012 Level crossings with concrete blocks road Sqm 1848.00 596.74 1102775.52
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
bending/machining and fixing of check rails of
all rail sections over PSC Sleepers as per
Railway's approved drawings & specifications
for level crossings / trolley paths/inspection
lines in yards duly cutting rail flanges, wherever
required to correct alignment and level, drilling
of holes with machine in check rails and fixing
to Running rail and sleepers with all Railway's
fittings, e.g. rail screws / grip expansion bolts,
brackets, packing pieces, bolts, washers etc
including grinding of brackets if required, fixing
of Railway's wooden blocks at flare ends duly
cutting and plaining, crossing of tracks and as
directed by the engineer in-charge Note: 1.
Drilling of holes in PSC Sleeper and fixing of
dowels shall be paid under relevant item. 2.
Required P.Way materials will be supplied at
SSE/P.Way stores.
39 186020 Fixing of Railway's existing precast concrete Sqm 5472.00 91.63 501399.36
slabs of different sizes in position for level
crossings / trolley path and filling gap between
check rail / running rail, slabs, approaches etc.
with asphalt complete and as directed.
Manufacturing, fabricating and supplying retro-
reflective Level Crossing Indicator boards,
made of 2mm thick aluminium sheet or 3mm
thick aluminium composite sheet, face to be
fully covered with high intensity encapsulated
type heat activated retro-reflective sheeting
conforming to type-IV of ASTM-D4956-01 in
yellow & black or other colour combination
including subject matter, message, symbols,
borders etc. as approved by Engineer In-charge
or as per IRPWM guidelines, pasted on
substrate by an adhesive backing which shall
be activated by applying heat and pressure
conforming to class-2 of ASTM-D-4956-01 and
fixing the same with suitable sized aluminium
alloy rivets @ 20 cm c/c to back-support frame
of M.S. angle iron of size 25mm x 25mm x 3mm
provided all along the edges of board with theft
resistant measures, back side of board shall be
with non-peelable weather-proof paint,
consisting of one coat of zinc chromate primer
and two coats of epoxy paint. Vertical post shall
have black & white anti-corrosive paint or
powder coating complete, as directed.
40 202011 Bilingual Whistle Boards for level crossing of Set 112.00 8004.87 896545.44
size 600mm x 600mm of each board with back
support frame welded to vertical post of MS T
section of size 75mm x 75mm x 6mm x
41 202012 Speed Breaker / Rumble Strips Board of size Set 58.00 7327.74 425008.92
900 mm equilateral triangular shape and
600mmx200mm boards with back support
frame welded to vertical post of MS T section of
size 80mmx80mmx8mmx3650mm
42 202015 Single Strip / Double Strip Level Crossing Road Set 44.16 7737.78 341700.36
Warning Board of size 900 mm equilateral
triangular shape and 900x300 board with back
support frame welded to vertical post of MS T
section of size 80mmx80mmx8mmx3650mm
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
43 202016 Manufacturing and supply of circular STOP Disc Each 48.00 4245.92 203804.16
of 600mm dia for fixing on emergency chains at
level crossings as given in IRPWM including
providing Retro reflective sheet fully covered
over board confirming to type-IV of ASTM-
D4956 in red back ground colour and text
"STOP" of white colour over back ground. The
circular board shall consists of 2mm thick
Aluminium sheet fixed to 1.5mm thick MS Sheet
of 600mm dia with suitable sized aluminium
alloy rivets @ 20 cm c/c to back-support .Retro
reflective sheet is to be pasted on substrate by
an adhesive backing which shall be activated
by applying heat and pressure conforming to
class-2 of ASTM-D-4956-01.A vertical holding
stand of 1000 mm length x15mm thick to be
jointed to back side of board along with a hook
for fixing emergency chain as directed by
Engineer In charge.
Manufacturing, fabricating and supplying retro-
reflective Engineering Indicator boards, made
of 2mm thick aluminium sheet or 3mm thick
aluminium composite sheet, face to be fully
covered with high intensity encapsulated type
heat activated retro-reflective sheeting
conforming to type-IV of ASTM-D4956-01 in
yellow & black or other colour combination
including subject matter, message, symbols,
borders etc. as approved by Engineer In-charge
or as per IRPWM guidelines, pasted on
substrate by an adhesive backing which shall
be activated by applying heat and pressure
conforming to class-2 of ASTM-D-4956-01 and
fixing the same with suitable sized aluminium
alloy rivets @ 20 cm c/c to back-support frame
of M.S. angle iron of size 25mm x25mm x
3mmprovided all along the edges of board with
theft resistant measures back side of board
shall be with non-peelable weatherproof paint,
consisting of one coat of zinc chromate primer
and two coats of epoxy paint. Vertical post shall
have black & white anti-corrosive paint or
powder coating complete, as directed.
1400mmx400mm with back support frame
fixed to vertical post of MS angle of size
50mmx50mmx6mm of 3650 mm long
45 202022 Speed Indicator Board of equilateral triangular Each 18.00 5715.38 102876.84
shape having each side of 1000mm with back
support frame fixed to vertical post of MS angle
of size 50mmx50mmx6mm of 3650 mm long
46 202023 Stop Indicator Board of size 1400mmx400mm Each 10.00 6677.49 66774.90
with back support frame fixed to vertical post
of MS angle of size 50mmx50mmx6mm of 3650
47 202024 Termination Indicator Board of Circular shape Each 10.00 8078.45 80784.50
having diameter of 1000mm with back support
frame welded to vertical post of MS angle of
size 50mmx50mmx6mm of 3950 mm long
Erection or removal of temporary Engineering
Indicator Board or any other board at specified
locations without causing infringement to track
etc. complete and as directed.
Item- 2 SW I B- Conversion of free rail panels into LWR.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
S No. Item Description of Item Unit Qty Rate Amount
1 063060 Opening and refixing of Joggled fish plates Set 468.00 58.37 27317.16
provided to weld joints/rail of any rail section
under traffic to enable examination of weld/rail
by departmental official nominated by Engineer
In charge and lubrication of fishplates by
applying departmental Grease graphite grade
'O' (IS:408) to fishing planes and bolts by
departmental black oil as per procedure laid
down in latest version of IRPWM, including all
tools required and as directed by Engineer-in-
charge. Note: 1. Grease Graphite, black oil, fish
bolts, K.Oil, wire brush, required for work shall
be given by department and issued at
concerned SSE/PW Stores. 2.Jammed fish bolts
shall be cut using chisel and hammer and
replaced with new bolt.
2 065020 Renewal of existing SEJ with improved SEJ with Set 37.00 9598.52 355145.24
PSC sleepers under traffic block conditions as
per approved drawing including fixing of special
size bearing plate, rubber pad and other
sleeper / rail fittings, greasing to the fittings,
leading rails, sleepers & fittings to site, leading
and stacking of released materials within a lead
of 250m, cutting of Rails, drilling of holes, fixing
of related fittings, providing temporary
connection with fishplates till welding of SEJ is
done and sleepers shall be given initial packing
to make track fit for 20KMPH speed. Note: (1)
Rail cutting and hole drilling shall be paid
separately. (2) One set comprise complete SEJ
on both rails at SEJ.
3 092030 25mm gap 'in-situ' welding during traffic block Each 945.00 1806.57 1707208.65
using Railway's welding portion & Welder and
finishing of weld to meet the prescribed
tolerances and pass all stipulated tests with all
required labour, materials, consumables, tools,
equipments etc. to complete the work in all
respect as per IR's "Manual for Fusion Welding
of Rails by Alumino - Thermic Process" with
latest correction slips, including marking of
welded joint, painting weld collar with
anticorrosive paint, restoration of track near
weld joint to original position and fixing of
joggled fish plate at new weld, to be removed
after passing of weld in USFD test as directed
by Engineer in charge. Note: 1. Only welding
portion and related accessories as per
Annexure - I and Welder shall be supplied by
Railways. 2. Hydraulic Weld trimmer shall be
used for chipping and profile Grinder for
finishing. 3. Required nos. of Joggled fish plates
shall be supplied by Railway at nearest P. Way
Stores and the same shall be returned at
nearest P. Way Store or at other location as per
direction of Engineer-in-Charge after release
Pulling back of rails / panels on running track
for creep adjustment or other incidental
activities by removing and re-fixing all the
fittings, and fastenings including squaring of
sleepers and slack picking of displaced
sleepers, as directed.
4 133013 For rail panel more than 40 metre length TRM 6090.00 48.15 293233.50
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
De-stressing of LWR/CWR track of any density
under traffic line block with contractor's
labours, tools, equipments and consumables
inclusive of all lead & lift. Activities include
cutting of LWR/CWR into convenient panels of
specified length, removal of ERCs, liners,
greasing of ERCs and liner contact area, lifting
rails and keeping them on rollers provided at
every 15 sleepers, working out elongation of
rail ends depending on prevailing site
conditions, pulling rails with the help of
Hydraulic Tensor to achieve the desired
elongation, cutting rails, as required, removing
rollers and placing rail in position, re-fixing
ERCs & liners and adjustment of gap at SEJs :
Note: (1) Welding of rail joints will be paid
separately. (2) Rail cutting and Hole drilling
shall be paid separately. (3) Opening and
closing of LC if required will be paid separately.
(4) As per procedure prescribed in latest edition
of IRPWM & CE's Circulars for destressing of
LWR/CWR, if any.
5 135012 With Contractor's Hydraulic Rail tensor TRM 60902.00 58.53 3564594.06
6 136060 Replacing existing glued joint rail with cut rails Each 94.00 1999.79 187980.26
or with glued joint rail or insertion of glued joint
by cutting existing track under traffic condition
by cutting rails, refixing with all rail sleeper
fastenings and providing required gaps for
carrying out welding as an alternative to drilling
holes or joining rails with fish plates duly drilling
holes as required including stacking of released
material and as directed by engineer in-charge.
Note: (1) Drilling holes & rail cutting will be
paid separately. (2) Transportation of materials
to the site of work from supply points, if more
than 250m, shall be paid separately.
Anti-corrosive painting of rail outside track on
rail bottom, web, foot and fishing plane with
two coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation, as
a complete job as per procedure prescribed in
latest edition of IRPWM.
Loading of tongue rail, stock rail, switch
assembly and crossings of any section and
length, SEJ, Glued joint etc. with / without
P.Way fittings and fastenings, in Wagon / Truck
/ trailer including lead up to 250 metre and lift
8 171024 I n Wagon where mechanical handling is MT 345.00 161.36 55669.20
possible and traffic block is not required or in
Loading of 52kg / 60kg PSC line and special
sleepers beyond 2.75 metre length including
existing fittings and fastenings in Depot /
Station / Mid-section between stations in a neat
manner to departmental material train (DMT) or
contractor's / Railway's Truck/trailer with crane
or any other means including crossing of one
track with free lead up to 250 metre and lift up
to 5 metre, if required with contractor's labour,
tools & plants, machinery, consumables etc.
Note: In case of any damage to sleeper during
loading, penalty @ 50% of the all inclusive cost
of sleeper shall be levied.
9 172024 I n Wagon/Truck / trailer where mechanical MT 105.00 160.92 16896.60
handling is possible a n d traffic block is not
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1 . Lead shall
be the shortest motorable road length between
the points of loading and unloading. 2. Loading
and unloading shall be paid extra under
relevant items.
14 172058 Extra for every Km per MT beyond 150 Km over MT-Km 67195.00 3.30 221743.50
item no. 172057
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery, consumables
etc. Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
Unloading of Switches / Crossings / SEJ Rails /
Glued Joints of any rail section and length with
or without P.Way fittings & fastenings in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with lead up to 250 metre & lift up
SW II - CTR (P) for a length of 1.803kms by manual in SSE/Pway/VPT sections. SW II A -
Transportation cost for CTR work.
S No. Item Description of Item Unit Qty Rate Amount
Loading, leading and unloading of 52Kg / 60Kg
rail up to 13 metre length by Railway's Rail
Dolly / Dip Lorry to the nominated location
under traffic with line protection in case road
carriage is not possible with different lead with
a lift up to 5 metre during block period.
Unloading of all type of rails of length 130
metre and beyond from end unloading rake and
keep the panels in head-up position at specified
distance from centre of track clear from any
infringement.. Note: Contractor has to keep
Oxygen and Acetylene gas with cutter as
standby during the period of work.
Loading, leading and unloading of PSC Sleepers
of 52Kg / 60Kg by Railway's Rail Dolly/ Dip Lorry
to the nominated location under traffic in case
road carriage is not possible for different leads
and lift up to 5 metres.
for every subsequent Km or part thereof and up
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Loading, leading and unloading of all types of
P.Way fittings and all other miscellaneous
m a t e r i a l except Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: Lead shall be
the shortest motorable road length between the
points of loading and unloading.
6 172048 Extra for every Km per MT beyond 150 Km over MT-Km 5436.00 3.30 17938.80
item no. 172047
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1 . Lead shall
be the shortest motorable road length between
the points of loading and unloading. 2. Loading
and unloading shall be paid extra under
relevant items.
Unloading of 52kg / 60kg PSC line and special
sleepers up to 2.75 metre length in Depot /
Station / Mid-section between stations in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with crane or any other means
including crossing of one track and lead up to
250 metre & lift up to 5 metre with contractor's
labour, tools & plants, machinery, consumables
etc. Note: In case of any damage to sleeper
during loading, penalty @ 50% of the all
inclusive cost of sleeper shall be levied.
Item- 4 SW II B- Labour cost for CTR by manual laying.
S No. Item Description of Item Unit Qty Rate Amount
Gas cutting of rail of various sections with
contractor's tools & plants, as directed by
engineer in-charge :
2 083030 Boxing and profiling of ballast as per procedure TRM 1803.00 29.22 52683.66
prescribed in latest edition of IRPWM including
cess dressing on both sides of track. The work
will include removing excess ballast from track
and putting the same in crib and shoulder by
leading to a maximum of 50m including
crossing of track, deweeding on ballast section
etc and as directed by Engineer-In charge.
Painting 2 coats to various P.Way Reference
Post, Structures etc. with enamel paint of
approved make with 2 coats of different colours
& letters, as directed by Engineer in-charge.
Quick cutting with abrasive rail cutter of all
types of rail sections including wear resistant,
head hardened rails up to 110 UTS, with
contractors tools & plants, equipment,
consumable with all lead & lift etc. complete as
directed by Engineer in-charge. Abrasive Rail
Cutter will be as per RDSO Specification No.
TM/SM/1 (Rev. 01 of 2012) with latest status of
RDSO; Rail Cutting Wheel Abrasive Disc will be
as per RDSO Specification No.TM/SM/2 (Rev. 01
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Drilling holes of 16 mm to 32 mm dia. with Rail
Drilling machine including chamfering with
appropriate chamfering tools in all types of rail
section with contractor's tools & plants,
equipment, consumable with all lead & lift etc.
complete, as directed by Engineer in-charge.
Rail Drilling Machine will be as per RDSO
Specification No. TM/SM/3, dated 24.04.1991.
6 161050 Drilling holes of specified size for bond holes Each 72.00 53.93 3882.96
with 7.2mm dia drill twist to correct spacing
and location on 60kg/52kg rails on cess or
under traffic block with contractor's tools and
plant, equipment, consumable, labour etc
complete as directed by the Engineer in charge
Item- 5 SW II C- Labour cost for CTR with manual alone.
S No. Item Description of Item Unit Qty Rate Amount
Dismantling and removing rail of all section &
length from track, laid on any type & density of
sleeper by removing fish plates, fastenings &
fish bolts and other materials including stacking
all released materials within an average
distance of 500 metres as directed by Engineer
in-charge. Note: 1.Cutting of rails shall be paid
separately. 2.Work to be done under traffic
Insertion of rails of all types & length in track,
laid on any type & density of sleeper to the
specified gauge under traffic block. Rates
include fastening of rail with sleepers with
standard set of fastenings and fixing of fish
plates and bolts or, if required, providing gap
for welding and stacking of released material
without infringement within 250m as directed
by Engineer-in-Charge. Note: Rail drilling and
cutting to be paid separately.
Through Sleeper Renewal (TSR) with PSC
sleepers involving removal existing sleepers of
any type along with fittings from track,
insertion of PSC sleepers lying along the cess /
formation / slope / toe within 5 metres height
with all fittings to specified spacing, gauge and
squareness, one round of through packing to
make track fit for 20 kmph speed, dressing of
ballast to standard profile, all in accordance
with the latest provisions of IRPWM and
stacking of all released material neatly at
specified places within an average lead of 100
m as directed by Engineer in-charge.
3 062011 For location of work not involving deep Each 2945.00 379.28 1116979.60
First or Second Through Packing of track of all
sleeper density including giving a general lift,
as desired to eliminate sag after Deep
Screening work, lifting of track, lowering of
track and major realignment of curves and
formation rehabilitation as per procedure
prescribed in latest edition of IRPWM. Note:
General lift is normally 25 mm and isolated lift
may be up to 50 mm.
4 131032 For PSC Sleeper Track with Sleeper Density of TRM 3606.00 153.04 551862.24
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Hiring of machinery for minor miscellaneous
works for short duration including
operator/driver, fuel, lubricants and
consumable. The contractor shall arrange all
statutory permits as required by rules and
regulations prevailing in the area of work.
Payment shall be made for actual working
5 211201 JCB Backhoe Loaders 3DX Plus or similar with Hour 10.00 867.49 8674.90
minimum 1.10 cum bucket capacity
Item- 6 SW II D- Conversion of free rail panels into LWR.
S No. Item Description of Item Unit Qty Rate Amount
1 063060 Opening and refixing of Joggled fish plates Set 16.00 58.37 933.92
provided to weld joints/rail of any rail section
under traffic to enable examination of weld/rail
by departmental official nominated by Engineer
In charge and lubrication of fishplates by
applying departmental Grease graphite grade
'O' (IS:408) to fishing planes and bolts by
departmental black oil as per procedure laid
down in latest version of IRPWM, including all
tools required and as directed by Engineer-in-
charge. Note: 1. Grease Graphite, black oil, fish
bolts, K.Oil, wire brush, required for work shall
be given by department and issued at
concerned SSE/PW Stores. 2.Jammed fish bolts
shall be cut using chisel and hammer and
replaced with new bolt.
2 065020 Renewal of existing SEJ with improved SEJ with Set 2.00 9598.52 19197.04
PSC sleepers under traffic block conditions as
per approved drawing including fixing of special
size bearing plate, rubber pad and other
sleeper / rail fittings, greasing to the fittings,
leading rails, sleepers & fittings to site, leading
and stacking of released materials within a lead
of 250m, cutting of Rails, drilling of holes, fixing
of related fittings, providing temporary
connection with fishplates till welding of SEJ is
done and sleepers shall be given initial packing
to make track fit for 20KMPH speed. Note: (1)
Rail cutting and hole drilling shall be paid
separately. (2) One set comprise complete SEJ
on both rails at SEJ.
3 092030 25mm gap 'in-situ' welding during traffic block Each 36.00 1806.57 65036.52
using Railway's welding portion & Welder and
finishing of weld to meet the prescribed
tolerances and pass all stipulated tests with all
required labour, materials, consumables, tools,
equipments etc. to complete the work in all
respect as per IR's "Manual for Fusion Welding
of Rails by Alumino - Thermic Process" with
latest correction slips, including marking of
welded joint, painting weld collar with
anticorrosive paint, restoration of track near
weld joint to original position and fixing of
joggled fish plate at new weld, to be removed
after passing of weld in USFD test as directed
by Engineer in charge. Note: 1. Only welding
portion and related accessories as per
Annexure - I and Welder shall be supplied by
Railways. 2. Hydraulic Weld trimmer shall be
used for chipping and profile Grinder for
finishing. 3. Required nos. of Joggled fish plates
shall be supplied by Railway at nearest P. Way
Stores and the same shall be returned at
nearest P. Way Store or at other location as per
direction of Engineer-in-Charge after release
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Pulling of welded rail panels to create a
specified gap under traffic block, including
opening of fittings & fastenings and re-fixing
them on track after pulling of rail and creating
standard gap for welding.
De-stressing of LWR/CWR track of any density
under traffic line block with contractor's
labours, tools, equipments and consumables
inclusive of all lead & lift. Activities include
cutting of LWR/CWR into convenient panels of
specified length, removal of ERCs, liners,
greasing of ERCs and liner contact area, lifting
rails and keeping them on rollers provided at
every 15 sleepers, working out elongation of
rail ends depending on prevailing site
conditions, pulling rails with the help of
Hydraulic Tensor to achieve the desired
elongation, cutting rails, as required, removing
rollers and placing rail in position, re-fixing
ERCs & liners and adjustment of gap at SEJs :
Note: (1) Welding of rail joints will be paid
separately. (2) Rail cutting and Hole drilling
shall be paid separately. (3) Opening and
closing of LC if required will be paid separately.
(4) As per procedure prescribed in latest edition
of IRPWM & CE's Circulars for destressing of
LWR/CWR, if any.
5 135012 With Contractor's Hydraulic Rail tensor TRM 1803.00 58.53 105529.59
6 136060 Replacing existing glued joint rail with cut rails Each 6.00 1999.79 11998.74
or with glued joint rail or insertion of glued joint
by cutting existing track under traffic condition
by cutting rails, refixing with all rail sleeper
fastenings and providing required gaps for
carrying out welding as an alternative to drilling
holes or joining rails with fish plates duly drilling
holes as required including stacking of released
material and as directed by engineer in-charge.
Note: (1) Drilling holes & rail cutting will be
paid separately. (2) Transportation of materials
to the site of work from supply points, if more
than 250m, shall be paid separately.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
Anti-corrosive painting of rail outside track on
rail bottom, web, foot and fishing plane with
two coats of thickness of 100 microns each by
bituminous black paint confirms to IS-9862 of
reputed make including surface preparation, as
a complete job as per procedure prescribed in
latest edition of IRPWM.
Loading of tongue rail, stock rail, switch
assembly and crossings of any section and
length, SEJ, Glued joint etc. with / without
P.Way fittings and fastenings, in Wagon / Truck
/ trailer including lead up to 250 metre and lift
8 171024 I n Wagon where mechanical handling is MT 18.00 161.36 2904.48
possible and traffic block is not required or in
Transportation of Rails, sleepers, switches,
crossings, SEJs and Glued Joints by road
vehicles for different leads. Note: 1 . Lead shall
be the shortest motorable road length between
the points of loading and unloading. 2. Loading
and unloading shall be paid extra under
relevant items.
11 172058 Extra for every Km per MT beyond 150 Km over MT-Km 3197.00 3.30 10550.10
item no. 172057
Unloading of Switches / Crossings / SEJ Rails /
Glued Joints of any rail section and length with
or without P.Way fittings & fastenings in neat
manner for Railway usage from departmental
material train (DMT) or contractor's / Railway's
Truck/Trailer with lead up to 250 metre & lift up
Item- 7 SW III - Standardization of formation
S No. Item Description of Item Unit Qty Rate Amount
Earthwork in excavation by mechanical means
(Hydraulic Excavator)/Manual Means for
foundations and floors of the bridges, retaining
walls etc. including setting out, dressing of
sides, ramming of bottom, getting out the
excavated material, back filling in layers with
approved material and consolidation of the
layers by ramming and watering etc. including
all lift, disposal of surplus soil up to a lead of
300m, all types of shoring and strutting with all
labour and material complete as per drawing
and technical specification as directed by
Engineer in charge. Note: This item will be used
for excavation work in connection with other
miscellaneous works also like side drains,
foundation for OHE masts and other
miscellaneous structures in connection with
Gauge Conversion, Doubling, New lines.
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
2 113010 Cess repair/widening work as per RDSO cum 30553.00 1014.51 30996324.03
Specifications and guidelines RDSO/2020/GE:
IRS-0004 or latest in running line with suitable
soil to the designed profile The work shall
include uprooting and disposing of all the
vegetation, benching at every 30 Cm vertical
height, earthwork in benching portion and
compaction using suitable slope vibratory
Rollers/Compactors etc. to achieve prescribed
MDD. Note: 1. Payment of cess repairs shall be
based on the quantities worked out from the
cross sectional calculations only and worked
out from the initial ground levels before doing
benching and final levels as done for new
embankment. The earth work in benching
portion shall not be paid extra as the same has
been included in the rate. 2. The earth work
shall be started only after Completing of the
benching and certified. 3. The benching Work
shall be done for a maximum height of 1.50 m
at any time based on the progress of earthwork
starting from toe of the embankment.
Removing /Re-erecting existing Gradient Post /
Kilometre Post, duly demolishing concrete
foundation, fixing the post in cement concrete
foundation as per drawing with 1:3:6 mix using
20mm hard aggregate, as directed (Cost of
concrete work will be paid under relevant item
Schedule Schedule A1b-(List of works which are covered in the printed Delhi Schedule of Rates 2023)
SW I & II : CTR (P) for a length of 60.902kms by PQRS / SQRS and 1.803kms by manual in
SSE/Pway/VPT & TN sections.
S No. Item Description of Item Unit Qty Rate Amount
4.0 CONCRETE WORK
4.1S CEMENT CONCRETE (CAST IN SITU)
Providing and laying in position cement
concrete of specified grade excluding the cost
of centering and shuttering - All work up to
derived from natural sources : 6 graded stone
aggregate 40 mm nominal size derived from
natural sources)
16.0 ROAD WORK
16.30S PREMIX CARPET
Providing and laying Bitumen Penetration
Macadam with hard stone aggregate of quality,
size and grading as specified, with bitumen of
suitable penetration grade, including required
key aggregate as specified, spreading coarse
aggregate with the help of self propelled/ tipper
16.36 tail mounted aggregate spreader and applying
bitumen by a pressure distributor and then
spreading key aggregate with the help of
aggregate spreader complete, including
consolidation with road roller of minimum 8 to
10 tonne capacity to achieve specified values of
compaction and surface accuracy :
MADURAI DIVISION-ENGINEERING/SOUTHERN RLY
16.36.2 For 75 mm compacted thickness in two layers Sqm 1796 744.15 1336493.4
using stone aggregate of size 63-41 mm
graded @ 0.90 cum per 10 sqm key aggregate
of size 20.0 mm graded @ 0.18 cum per 10
sqm. With paving asphalt grade VG - 10 @ 68
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
AddlSpecialconditionsofcontractforTrackNew_1.pdf
ATTACHMENT
USSORSpecifications.pdf
ATTACHMENT
DSRspecificationextract.pdf
ATTACHMENT
AncillaryWorksatsitewelding.pdf
ATTACHMENT
RailpaintingCEcircular.pdf
ATTACHMENT
Specialconditionforcontractormovementofvehicle.pdf movement of vehicle
ATTACHMENT
BidCapacityFormat.pdf
ATTACHMENT
GCCApr2022withCorrectionSlip1to11.pdf
ATTACHMENT
RulesandRegulations-Aug2023.pdf
ATTACHMENT
BankGuaranteeBond-Modelform.pdf
ATTACHMENT
RBCECECTImplementationofcontracteMB.pdf
ATTACHMENT
TWOpacketsystem-Aug22.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
CTRTrackworksplconditions.pdf
ATTACHMENT
LocationAnnexure.pdf
ATTACHMENT
Specialconditionforcontractormovementofvehicle.pdf
ATTACHMENT