Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.3 CrAccepted-AOC | ₹43.3 Cr | L1 | Accepted-AOC L1 position bidder |
| 2 | L2₹49.4 Cr+₹6.1 Cr (14.2%)Rejected-AOC SECOND FLOOR 10 3 277 2 B MEHDIPATNAM HUMAYUN NAGAR HYDERABAD TELANGANA 500028 | HYDERABAD | TELANGANA | 500028 | ₹49.4 Cr+₹6.1 Cr (14.2%) | L2 | Rejected-AOC L2 position bidder |
| 3 | Rejected-Technical 4TH FLOOR C 97 MAYAPURI INDUSTRIAL AREA PHASE 2 SOUTH WEST DELHI DELHI 110064 | WEST DELHI | DELHI | 110064 | - | - | Rejected-Technical Failed to comply with mandatory minimum technical specifications for various line items as per tender Cl.16.0(a),(d)))0 |
| 4 | Rejected-Technical 11A LAXMI VIHAR BANDHAN PALACE WALI GALI MODIPURAM MEERUT UTTAR PRADESH 250110 | MEERUT | UTTAR PRADESH | 250110 | - | - | Rejected-Technical 1.Complete SOW not provided against Technical BEC to establish similar work definition as per tender provisions 2.Failed to comply with mandatory minimum technical specifications for various line items as per tender Cl.16.0(a),(d) |
| 5 | Rejected-Technical | - | - | Rejected-Technical DPIIT certificate not in the name of Bidder and no responses against queries |
| Sl No | Description | Qty | Unit | PRO DIGITAL LABS PRIVATE LIMITED L1 | BT Convergence Technologies Pvt. Ltd L2 |
|---|---|---|---|---|---|
| 1.00PART A- SITC - Supply, Installation, Testing, Commissioing of Interiors, Civil, Electrical, Lighting, Automation and UPS, HVAC, Fire Supression system including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year as per tender specifications and requirement | |||||
| 2.00 | SITC - of Interiors including demolition, Civil, Electrical, Lighting, Automation and UPS, HVAC, Fire Supression system including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year (Covering BoQ Sl. Nos from 1 till 5.12) | 1 | Lumpsum | 4,20,00,000 ₹4,95,60,000 Lowest | 4,85,00,000 ₹5,72,30,000 |
| 3.00PART B -SITC - Supply, Installation, Testing, Commissioing of Complete Hardware/ Software/ Systems/ Solutions including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year as per tender specifications and requirement | |||||
| 4.00 | SITC - of Complete Hardware/ Software/ Systems/ Solutions including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year as per tender specifications and requirement (Covering BoQ Sl. Nos 6.2, 7.2, 8.2, 9.2, 10.2, 11.2, 12.2, 13.2, 14.2, 15.2, 16.2, 17.2, 18.2, 19.2, 20.2, 21.2, 22.2, 23.2, & 24.2 ) | 1 | Lumpsum | 19,50,00,000 ₹23,01,00,000 Lowest | 21,00,00,000 ₹24,78,00,000 |
| 5.00PART C - Use Case Development, Multimedia Content Development, hardware-Software integration day-to-day operations and warranty of all the media content and software integrations done for 1 year as per tender specifications and requirement | |||||
| 6.00 | Use Case Development, Multimedia Content Development, hardware-Software integration day-to-day operations and warranty of all the media content and software integrations done for 1 year as per tender specifications and requirement (Covering BoQ Sl. Nos 6.1, 7.1, 8.1, 9.1, 10.1, 11.1, 12.1, 13.1, 14.1, 15.1, 16.1, 17.1, 18.1, 19.1, 20.1, 21.1, 22.1, 23.1, & 24.1 ) | 1 | Lumpsum | 8,50,00,000 ₹10,03,00,000 Lowest | 9,80,00,000 ₹11,56,40,000 |
| 7.00Total of supply and site services (Part_A + Part_B +Part C) Without GST | |||||
| 8.00PART D -Comprehensive AMC and O&M charges (with requisite resource as resident engineer) applicable on Part_A, Part_B & Part_C after completion of 1 year warranty period | |||||
| 9.00 | PART D- Comprehensive AMC and O&M charges for 2nd year | 1 | Year | 0.03 ₹1,03,62,545.45 Lowest | 0.03 ₹1,14,72,818.18 |
| 10.00 | PART D- Comprehensive AMC and O&M charges for 3rd year | 1 | Year | 0.04 ₹1,25,60,661.16 Lowest | 0.04 ₹1,39,06,446.28 |
Tender Value
Refer Docs
EMD Value
₹36.9 L
Closing Date
16 Apr 2026, 2:00 pmClosed
MUKESH KR VERMA CM
GTI PLOT NO. 24 SECTOR 16 NOIDA
ESTABLISHING AI POWERED DIGITAL EXPERIENCE CENTRE AT GTI COMPLEX, NOIDA
2026_GAIL_271696_1
GAIL/GITN/BIS/CNP/FL-33
Open Tender
Miscellaneous Works
Turn-key
240 days
GTI NOIDA
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹36.9 L
Yes
GTI NOIDA
3 Aug 2026
18 Mar 2026
17 Apr 2026
18 Mar 2026
16 Apr 2026
1 Apr 2026
30 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART A- SITC - Supply, Installation, Testing, Commissioing of Interiors, Civil, Electrical, Lighting, Automation and UPS, HVAC, Fire Supression system including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year as per tender specifications and requirement | - | - | - | - |
| 2 | SITC - of Interiors including demolition, Civil, Electrical, Lighting, Automation and UPS, HVAC, Fire Supression system including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year (Covering BoQ Sl. Nos from 1 till 5.12) | - | Lumpsum | - | - |
| 3 | PART B -SITC - Supply, Installation, Testing, Commissioing of Complete Hardware/ Software/ Systems/ Solutions including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year as per tender specifications and requirement | - | - | - | - |
| 4 | SITC - of Complete Hardware/ Software/ Systems/ Solutions including transpotation,day-to-day operations and warranty of all the supplied and installed items for 1 year as per tender specifications and requirement (Covering BoQ Sl. Nos 6.2, 7.2, 8.2, 9.2, 10.2, 11.2, 12.2, 13.2, 14.2, 15.2, 16.2, 17.2, 18.2, 19.2, 20.2, 21.2, 22.2, 23.2, & 24.2 ) | - | Lumpsum | - | - |
| 5 | PART C - Use Case Development, Multimedia Content Development, hardware-Software integration day-to-day operations and warranty of all the media content and software integrations done for 1 year as per tender specifications and requirement | - | - | - | - |
| 6 | Use Case Development, Multimedia Content Development, hardware-Software integration day-to-day operations and warranty of all the media content and software integrations done for 1 year as per tender specifications and requirement (Covering BoQ Sl. Nos 6.1, 7.1, 8.1, 9.1, 10.1, 11.1, 12.1, 13.1, 14.1, 15.1, 16.1, 17.1, 18.1, 19.1, 20.1, 21.1, 22.1, 23.1, & 24.1 ) | - | Lumpsum | - | - |
| 7 | Total of supply and site services (Part_A + Part_B +Part C) Without GST | - | - | - | - |
| 8 | PART D -Comprehensive AMC and O&M charges (with requisite resource as resident engineer) applicable on Part_A, Part_B & Part_C after completion of 1 year warranty period | - | - | - | - |
| 9 | PART D- Comprehensive AMC and O&M charges for 2nd year | - | Year | - | - |
| 10 | PART D- Comprehensive AMC and O&M charges for 3rd year | - | Year | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
TENDERFIN.pdf
Tender Documents • 7.51 MB
BOQ_316886.xls
BOQ • 0.32 MB
Drawings.pdf
Additional Documents • 3.53 MB
CORRI-V.pdf
PDF • 0.05 MB
CorriIV.pdf
PDF • 0.21 MB
Corri-III.pdf
PDF • 0.21 MB
CORRII.pdf
PDF • 0.22 MB
CorriF.pdf
PDF • 27.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .