Loading…
Loading…
| # | Company | Offered Item | Rank | Status |
|---|---|---|---|---|
| 1 | L1Qualified Item Categories: Auto Refractometer (V2) 811 812 SAKAR 5 NEAR MITHAKHALI RAILWAY CROSSING OFF ASHRAM ROAD AHMEDABAD GUJARAT 380009 | AHMADABAD | GUJARAT | 380009 | Item Categories: Auto Refractometer (V2) | L1 | Qualified MSE, Category: General |
| 2 | L2Not Evaluated Item Categories: Auto Refractometer (V2) HOUSE NO 491 A3 AMBEDKAR NAGAR HAIDER PUR DELHI NORTH WEST DELHI DELHI 110088 | NORTH DELHI | DELHI | 110088 | Item Categories: Auto Refractometer (V2) | L2 | Not Evaluated Category: OBC |
Tender Value
₹8.1 L
EMD Value
Exempted
Closing Date
29 Sept 2025, 12:00 pmClosed
Auto Refractometer (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6632715 Dated : 18-09-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 807754 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : PFA Icf/stores
Indian Railways
Integral Coach Factory
Ministry of Railways (President Of India
Acting through PFA/ICF) (Pfa) Splitting 2/9
8293551
GEM/2025/B/6632715
Single Packet Bid
Auto Refractometer (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria
1 days
Murmu600038INTEGRAL COACH FACTORY MINISTRY OF RAILWAYS CHENNAI -
Total value wise evaluation
PRODUCT
3 documents required · 3 mandatory
Exempted
18 Sept 2025
18 Sept 2025
29 Sept 2025
Auto Refractometer (V2) (Q2) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6632715 Dated : 18-09-2025 Bid Document 1/9 Number of Auto Extension count 1 Bid to RA enabled No Comprehensive Maintenance Charges Required Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 807754 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 24 (a).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : PFA Icf/stores
Indian Railways
Integral Coach Factory
Ministry of Railways (President Of India
Acting through PFA/ICF) (Pfa) Splitting 2/9
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8293551.pdf
GEM_BID
TECHSPEC_619c550c-8a19-45e9-9edd1757393926963_smmsteel.pdf
SPECIFICATION
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .