Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹12.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹12.3 L+₹15,343.95 (1.26%)Admitted-Fee/PreQual/Technical/Finance | ₹12.3 L+₹15,343.95 (1.26%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹12.5 L+₹34,172.15 (2.81%)Admitted-Fee/PreQual/Technical/Finance | ₹12.5 L+₹34,172.15 (2.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹12.7 L+₹56,216.64 (4.62%)Admitted-Fee/PreQual/Technical/Finance | ₹12.7 L+₹56,216.64 (4.62%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M/S Y SOMORJIT SINGH L1 | SOCIAL SATISFACTORY CONSTRUCTION & SUPPLIER L4 | KH JITEN SINGH L2 | Laishram Guni Singh L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 276.73 | sqm | 13 ₹3,597.49 Lowest | 16 ₹4,427.68 | 15 ₹4,150.95 | 16.47 ₹4,557.74 |
| 2.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 32.23 | cum | 358 ₹11,538.34 | 352 ₹11,344.96 | 350 ₹11,280.5 Lowest | 633.76 ₹20,426.08 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering --All work upto plinth level:1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 13.67 | cum | 10,200 ₹1,39,434 Lowest | 11,000 ₹1,50,370 | 10,500 ₹1,43,535 | 11,088.6 ₹1,51,581.16 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work upto plinth level: 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.44 | cum | 12,600 ₹18,144 | 12,100 ₹17,424 Lowest | 12,500 ₹18,000 | 13,197.47 ₹19,004.36 |
| 5.00 | Brick work with Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | 16.12 | cum | 19,500 ₹3,14,340 | 19,200 ₹3,09,504 | 19,300 ₹3,11,116 | 17,667.89 ₹2,84,806.39 Lowest |
| 6.00 | Half brick masonry with Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in: Cement mortar 1 : 3 (1 cement : 3 coarse sand) | 212.14 | sqm | 2,350 ₹4,98,529 | 2,520 ₹5,34,592.8 | 2,400 ₹5,09,136 | 2,135.63 ₹4,53,052.55 Lowest |
| 7.00 | 12 mm cement plaster of mix: 1:4 (1 cement : 4 fine sand) | 212.14 | sqm | 350 ₹74,249 Lowest | 375 ₹79,552.5 | 360 ₹76,370.4 | 600.36 ₹1,27,360.37 |
| 8.00 | Supplying and filling in plinth with sandy soil under floors including, watering,ramming consolidating and dressing complete. | 48.61 | cum | 1,050 ₹51,040.5 | 980 ₹47,637.8 Lowest | 1,000 ₹48,610 | 1,205.69 ₹58,608.59 |
| 9.00 | Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required. In grating, frames, guard bar, railing, brackets, gates and similar works. | 255.63 | kg | 210 ₹53,682.93 Lowest | 235 ₹60,073.76 | 220 ₹56,239.26 | 219.13 ₹56,016.86 |
| 10.00 | Finishing walls with Deluxe Multi surface paint system for interiors and exteriors using Primer as permanufacturers specifications : Two or more coats applied @ 1.25 ltr/10 sqm. over and including one coat of Special primer applied @0.75 ltr/10 sqm. | 292.22 | sqm | 175 ₹51,138.5 Lowest | 195 ₹56,982.9 | 180 ₹52,599.6 | 254.78 ₹74,451.81 |
Tender Value
₹8.8 L
EMD Value
₹17,600
Closing Date
18 May 2026, 3:00 pmClosed
Executive Engineer, Manipur University.
Manipur University Canchipur.
Beautification/ Repairing work of Campus and providing of Outdoor Garden Seats for Commerce Department, MU.
2026_MU_908039_1
415/2026-27/ENGG/MU/Civil
Open Tender
Civil Works
Works
45 days
As Per Tender Document
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
The Registrar MU
₹17,600
Canchipur
26 May 2026
8 May 2026
19 May 2026
8 May 2026
18 May 2026
8 May 2026
13 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | - | sqm | 1 | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 1 | cum | 1 | ₹1 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering --All work upto plinth level:1:4:8 ( 1 Cement: 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 1 | cum | 1 | ₹1 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - -All work upto plinth level: 1:2:4 ( 1 Cement: 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1 | cum | 1 | ₹1 |
| 5 | Brick work with Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in:Cement mortar 1:4 (1 cement : 4 coarse sand) | - | cum | 1 | - |
| 6 | Half brick masonry with Ist class common burnt clay F.P.S. (non modular) bricks in foundation and plinth in: Cement mortar 1 : 3 (1 cement : 3 coarse sand) | 1 | sqm | 1 | ₹1 |
| 7 | 12 mm cement plaster of mix: 1:4 (1 cement : 4 fine sand) | 1 | sqm | 1 | ₹1 |
| 8 | Supplying and filling in plinth with sandy soil under floors including, watering,ramming consolidating and dressing complete. | 1 | cum | 1 | ₹1 |
| 9 | Steel work welded in built up section/framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using steel etc. as required. In grating, frames, guard bar, railing, brackets, gates and similar works. | 0.2 | kg | 1 | ₹0.2 |
| 10 | Finishing walls with Deluxe Multi surface paint system for interiors and exteriors using Primer as permanufacturers specifications : Two or more coats applied @ 1.25 ltr/10 sqm. over and including one coat of Special primer applied @0.75 ltr/10 sqm. | - | sqm | 1 | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_954375.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .