| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical document are not as per requirement |
Tender Value
₹8.8 L
EMD Value
₹9,000
Closing Date
27 Jan 2023, 12:00 pmClosed
SE,EUDC-VII,Ciss-Gomti,LESA,
33/11 K.V. Substation,sct-5D,Vrandavan Yojna,LESA, Lucknow.
Replacement of damaged Distribution Transformer of different capacity under jurisdiction of E.E, E.U.D.D-Vrindavan, LESA, Lucknow
2023_MVVNL_768063_1
39/EUDC-VII/LESA/2022-23
Open Tender
Miscellaneous Works
365 days
LUCKNOW
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
A/CNo-1277784945,IFSC Code-CBIN0280140,
₹9,000
Yes
20 Feb 2023
20 Jan 2023
27 Jan 2023
20 Jan 2023
27 Jan 2023
20 Jan 2023
Amount
Disconnection and removal of Damaged Transformer from present system, safe carriage from site of damage to Transformer work shop Aliganj for DTC. The work include loading, Unloding and safe carriage with in the area of E.U.D.D.- Vrindavan.
25 K.V.A. Transformer mounted on double pole/plinth.
63 K.V.A. Transformer mounted on double pole/plinth.
100 K.V.A. Transformer mounted on double pole/plinth.
250 K.V.A. Transformer mounted on four pole/plinth.
400 K.V.A. Transformer mounted on four pole/plinth.
630 K.V.A. Transformer mounted on plinth.
Safe carriage of healthy Transformer from store work shop Aliganj to site of damage including loading, unloading, dragging. Mounting, properly connecting T/F to the system and commissioning on load, within the area of E.U.D.D.- Vrindavan.
25 K.V.A. Transformer mounted on double pole/plinth.
63 K.V.A. Transformer mounted on double pole/plinth.
100 K.V.A. Transformer mounted on double pole/plinth.
250 K.V.A. Transformer mounted on four pole/plinth.
400 K.V.A. Transformer mounted on four pole/plinth.
630 K.V.A. Transformer mounted on plinth.
Safe carriage of Transformer Mobile trolley mounted with Transformer to site. Putting it at damaged Transformer site safely. Connecting the trolley Transformer to restart the electrical system safely including all electrical work so that supply may be re-started by this trolley Transformer.
Safe return carriage of Transformer mobile trolley from damage Transformer site to Sub-Station or other site (as) the case may be after disconnection the trolley from the electrical system.
GST Extra as per Rules
CHHATRA SHAKTI CONSTRUCTION PRIVATE LIMITED
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx