Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20,830.91Admitted-Finance | +17.00% | ₹20,830.91 | L1 | Admitted-Finance |
| 2 | L2₹21,185.22Admitted-Finance | +18.99% | ₹21,185.22 | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
17 Feb 2026, 12:30 pmClosed
EXECUTIVE ENGINEER
PHED CAMPUS BAITU
Annual Rate Contract for Repairing of Source Un-lowering and Lowering of various sources under Block Patodi Sub Dn Gida
2026_PHCJO_537889_3
NIT NO 11
Open Tender
Civil Works - Water Works
365 days
BAITU
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Secretary, RREIS
₹10,000
Yes
20 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
2.1( PHED O&M 2020-21) Barmer Uniwering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine) 2.1.1 For three Phase pump set 2.1.1.1 G.I. Double Flanged Pipe Lowering Assembly of nominal dia. 2.1.1.1.1 50mm
2.1 ( PHED O&M 2020-21) Uniwering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine)2.1.1 For three Phase pump set 2.1.1.1 G.I. Double Flanged Pipe Lowering Assembly of nominal dia. 2.1.1.1.2 65mm
2.1( PHED O&M 2020-21) Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine) 2.1.1 For three Phase pump set 2.1.1.2 HDPE Pipe Lowering Assembly of nominal dia. 2.1.1.2.1 63mm
2.1( PHED O&M 2020-21) Uniwering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine) 2.1.1 For three Phase pump set 2.1.1.2 HDPE Pipe Lowering Assembly of nominal dia. 2.1.1.2.2 75mm
2.1( PHED O&M 2020-21) Uniwering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine) 2.1.1 For three Phase pump set 2.1.1.2 HDPE Pipe Lowering Assembly of nominal dia. 2.1.1.2.3 90mm
Add above item 2.1.1 for depth above 120 mtr for each 10 mtr depth
Add above item 2.1.1 for distance run above 20 Km for each 5Km distance run.
2.1 ( PHED O&M 2020-21) Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine) 2.1.2 For single phase pump set 2.1.2.2 HDPE Pipe Lowering Assembly of nominal dia.2.1.2.2.2 40 mm
2.1( PHED O&M 2020-21) Uniwering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from nube well, checking the pump set. tranponation of pump set from tube well tile to store as direction, receiving repaired new pump set from stre divisional store, testing the same, transportation to site and lowering back into tube well along with sherible cable, lowering pipes, specials mc and commissioning of the tube well The job also includes cable joing checking of discharge of pump set, interconnection of lowenag pipe from nearby distribution pipe liar, checking ef starter and reporting for completion of Job or fault problem if any (Upto 20 Km distance run by lowening machine) 2.1.2 For single phase pump set 2.1.2.2 HDPE Pipe Lowering Assembly of nominal dia. 2.1.2.2.3 50 mm
Add above item 2.1.1 for depth above 120 mtr for each 10 mtr depth
Add above item 2.1.1 for distance run above 20 Km for each 5Km distance run.
2.2 ( PHED O&M 2020-21)Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction. 2.2.1 From tube well For three phase pump set 2.2.1.1 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 2.2.1.1.1 50 mm
2.2 ( PHED O&M 2020-21) Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction. 2.2.1 From tube well For three phase pump set 2.2.1.1 G.I. Double Flanged Pipe Lowering Assembly of nominal dia 2.2.1.1.2 65 mm
Add above item 2.2.1 for depth above 120 mtr for each 10 mtr depth
Add above item 2.2.1 for distance run above 20 Km for each 5 Km distance run For single Phase pump set
2.2( PHED O&M 2020-21) Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction. 2.2.2 For single Phase pump set 2.2.2.2 HDPE Pipe Lowering Assembly of nominal dia 2.2.2.2.1 32 mm
2.2 ( PHED O&M 2020-21) Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction. 2.2.2 For single Phase pump set 2.2.2.2 HDPE Pipe Lowering Assembly of nominal dia 2.2.2.2.2 40 mm
2.2 ( PHED O&M 2020-21) Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction. 2.2.2 For single Phase pump set 2.2.2.2 HDPE Pipe Lowering Assembly of nominal dia 2.2.2.2.3 50 mm
2.3 ( PHED O&M 2020-21) Only lowering of the submersible pump set into tube well along with submersible cable, lowering pipes depth up to 120 mtr, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any.2.3.2 For single Phase pump set 2.3.2.2 HDPE Pipe Lowering Assembly of nominal dia2.3.2.2.1 32 mm
2.3 ( PHED O&M 2020-21) Only lowering of the submersible pump set into tube well along with submersible cable, lowering pipes depth up to 120 mtr, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any.2.3.2 For single Phase pump set 2.3.2.2 HDPE Pipe Lowering Assembly of nominal dia 2.3.2.2.2 40 mm
2.3 ( PHED O&M 2020-21) Only lowering of the submersible pump set into tube well along with submersible cable, lowering pipes depth up to 120 mtr, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any. 2.3.2 For single Phase pump set 2.3.2.2 HDPE Pipe Lowering Assembly of nominal dia 2.3.2.2.3 50 mm
Add above item no. 2.3.2 for depth above 120 mtr for each 10 mtr depth
Add above item 2.3.2 for distance run above 20 Km for each 5Km distance run.
2.4( PHED O&M 2020-21) Increasing of lowering pipes in tube wells including cost of nut bolts and rubber gaskets/jointing material and PVC rope and transporatation of cable and extra lowering pipe from store.. However submersible cable and extra lowering pipe shall be provided by the department at store. 2.4.1 For three phase pump set 2.4.1.1 G.I. Double Flanged Pipe Lowering Assembly of nominal dia (For incease up to 30 Mtr length of pipe) 2.4.1.1.1 50 mm
2.4 ( PHED O&M 2020-21) Increasing of lowering pipes in tube wells including cost of nut bolts and rubber gaskets/jointing material and PVC rope and transporatation of cable and extra lowering pipe from store.. However submersible cable and extra lowering pipe shall be provided by the department at store. 2.4.1 For three phase pump set 2.4.1.1 G.I. Double Flanged Pipe Lowering Assembly of nominal dia (For incease up to 30 Mtr length of pipe) 2.4.1.1.2 65 mm
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.25 MB
item03.pdf
Tender Documents • 1.28 MB
BOQ_958588.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid