Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.0 L+₹18,158.84 (9.78%)Admitted-Fee/PreQual/Technical/Finance AAGNOO VERINAG | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹3.0 L
EMD Value
₹8,880
Closing Date
10 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CO ROAD FROM AGRICULTURE OFFICE TO ABDUL REHMAN DAR AND OTHERS AT ANANTNAG BLOCK SAGAM
2026_RDPR_319100_25
ENIT84of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹8,880
12 Aug 2026
3 Aug 2026
11 Aug 2026
3 Aug 2026
10 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Engagement of JCB for site clearance including removing vegetation , tree stumps dumping material etc | 6 | Hours | - | - |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal
of excavated earth lead upto 50 meters and lift upto 1.5 m,
as directed by Engineer-in-Charge. | 6.28 | Cum | - | - |
| 0.0 | Supplying and filling of stone soling / nallah muck including watering consolidation ,carriage comlete | 117 | Cum | - | - |
| 0.0 | Supplying Stacking Laying Stone aggregate 63-45mm of specified size WBM GII INCLUDING screening and consolidation PRRcomplete including carriage lead 10Km | 34.15 | Cum | - | - |
| 0.0 | Supplying Stacking Laying Stone dust morum at site | 6.34 | Cum | - | - |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate mm nominal size) | 6.57 | Cum | - | - |
| 0.0 | P/L of Plum | 1.64 | Cum | - | - |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: | 25.3 | sqm | - | - |
| 0.0 | carriage of materials | - | - | - | - |
| 0.0 | Sand Lead 20 Km | 8.93 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_1056084.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .