Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.2 CrAccepted-AOC | ₹20.2 Cr | L1 | Accepted-AOC Tender Accept |
| 2 | L2₹20.3 CrRejected-Finance | ₹20.3 Cr | L2 | Rejected-Finance Financial Bid rejected being higher rate |
| 3 | L3₹21.1 CrRejected-Finance | ₹21.1 Cr | L3 | Rejected-Finance Financial Bid rejected being higher rate |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹20.3 Cr
EMD Value
₹30.4 L
Closing Date
9 May 2020, 12:00 pmClosed
EE PD PWD Unnao
EE PD PWD Unnao
WIDENING and STRENGTHNING OF BHIMESHWAR SIKANDARPUR ROAD. (ODR) KM 1 TO 15(725) SANCTIONED IN F.Y.-2019-20 UNDER STATE SECTOR SCHEME (LENGTH 14.725 KM) IN DISTT. UNNAO
2020_CEUCZ_454188_1
1084M/1M/E-Tender Dt. 29-02-2020
Open Tender
Civil Works
365 days
Unnao
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
EE PD PWD Unnao
₹30.4 L
Yes
SE Unnao Circle PWD Unnao
14 Aug 2020
21 Mar 2020
11 May 2020
21 Mar 2020
9 May 2020
24 Mar 2020
24 Mar 2020
Amount
Construction of subgrade with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. (Including labour Cess & Excluding GST)
Excavation for roadwork in soil with hydraulic excavator of 0.9c um bucket capacity including cutting and loading in tippers, trimming bottom and side slope in accordance with requirements of lines, grades and cross section and transporting to the embankement location within all lifft and lead.(Including labour Cess & Excluding GST)
Construction of subgrade and earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2.(for compaction) (Including labour Cess & Excluding GST)
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(Including labour Cess & Excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including labour Cess & Excluding GST)
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site , laying with 1% OPC cement and 3.5% emulsion in uniform single layer on subbase/base and compacting with the road roller to achieve the desire density. (Including labour Cess & Excluding GST)
Construction of earthen shoulder with approved material obtained from borrowpits with all lifts and leads,spreading,grading to required slope and compected to meet requirement of table 300-2. (Including labour Cess & Excluding GST)
Providing and applying tack coat with VG-10 using bitumen distributor at the rate of 0.30 kg per sqm on the prepared surface cleaned with hydraulic broom. (Including labour Cess & Excluding GST)
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects. (Including labour Cess & Excluding GST)
For 600 mm H.P./1000 mm H.P. /3.0 m Span Culvert /U type Drain Earthwork in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom,brakfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. (Including labour Cess & Excluding GST)
3.0 m Span Culvert /U type Drain Providing and laying reinforced cement concrete M 20 grade in superstructure as per drawing and technical specifications clauses 800, 1205.4 and 1205.5 (Including labour Cess & Excluding GST)
3.0 m Span Culvert /U type Drain Supplying fitting and placing TMT bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses. (Including labour Cess & Excluding GST)
1000 Dia Hume Pipe Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
For 600 mm H.P./1000 mm H.P. / 3.0 m Span Culvert /U type Drain Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
For 600 mm H.P./1000 mm H.P. /3.0 m Span Culvert /U type Drain Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations . (Including labour Cess & Excluding GST)
For 600 mm H.P./1000 mm H.P./3.0 m Span Culvert Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. (Including labour Cess & Excluding GST)
For 600 mm H.P./1000 mm H.P. Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification. (Including labour Cess & Excluding GST)
600 Dia Hume Pipe Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation, protection works, back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
350 mm Hume pipe Culvert Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works, back filling, concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Construction of embankment with approved material obtained from availble land as permitted and approved by Engineer-in-Charge and as per Technical Specitaion Clause 301.3.4.1, with all lifts and leads, spreading, grading to required slope and compacting to meet requirement of Tables 300.1and 300.2 as per Technical Specification clause 301.5 (Including labour Cess & Excluding GST)
Construction of 5x6 box culver Laying of 1000 mm dia reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Laying brick soling on prepared sub-grade with brick on end edging according to lines,graded and cross-section shown on the drawing filling joints with sand and earth,spreading 25 mm thick layer of earth over brick soling,watering and rolling the same with three wheeled road roller 80-100 kN as per Technical Specification Clause 412 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres as per Technical Specification Clause 202 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert M-150 First class brick work in 1:3 cement and coarse sand of 1.25 FM mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of the work S.I. No. 307 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Providing and laying boulder pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications including supply of all material, labour T&P etc complete (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Making Island in river stream for a dry working area including cost of Bull piling soring G.I. Sheets E.C. Earth work etc at required. (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert KC Drain / Chute Drain Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Plain cement concrement 1:2:4 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days.as per drawing and technical speficiations Clauses 802,803,1202 & 1203 (M-15) (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Plain/reinforced cement concrete M 30 grade in sub-structure complete as per drawing and technical specifications clauses 802, 804, 805, 806, 807, 1202 and 1204 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Supplying fitting and placing mild bar reinforcement in superstructure complete as per drawing and Technical Specifications clauses 1002, 1010 and 1202 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert KC Drain / chute Drain Brick masonry work in 1:3 cement mortar in foundation complete excluding pointing and plastering as per drawing and technical speficiations clauses 600, 1202 & 1203 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Drainage spouts complete as per drawing and technical specifications Clause 1209 (Including labour Cess & Excluding GST)
Expansion Joint construction of 5x6 box culvert Providing and fixing expansion Joint as per drawing of all materials labour T&P etc.. required for proper completion of the work. (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Supply of plywood 12 mm thick century or equivalent for mid expansion joint as per direction of E/I as per SOR Ch-1 Si.no. 14(1) (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Sand Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Providing and applying 2 coat of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust oil grease afflorescence and applying paint @ of 1 litre for 2 sqm. as per SOR Ch-15 Si.no. 20 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert Wall painting with plastic emulsion paint of approved brand and manufacture to give even shade. two or more coats on new work (Ist Quality) as per SOR Ch-15 Si.no. 24 (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert KC drain / chute Drain Providing and laying Cement concrete 1:2:4 (1 cement : 2coarse sand : 4 graded stone ballast 20 mm. nominal size) including supply of all materials. labour and T&P etc. required for proper completion of the work and curing complete, also including cost of formwork in fou ndation and floors.as per SOR Ch-5 Si.no. 279(b) (Including labour Cess & Excluding GST)
Construction of 5x6 box culvert KC Drain /chute Drain Plastering with cement mortar (1:4) 15 mm thick on brickwork in substructure/ superstracutre as per technical specification clauses 613.4 & 1204 (Including labour Cess & Excluding GST)
M/s Progressive Construction Company
M/s Prabhu Nath Prasad Thekedar
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid