| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC NO 164 HARERAM NAGAR RAJAJIIPURAM TVLR 602 001 | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 602001 | ₹1.8 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.0 CrRejected-AOC NO 99 A VILAPAKKAM ROAD ARUMBAKKAM VILLAGE MANNAVEDU POST TIRUVALLUR DISTRICT 602 021 | ARUMBAKKAM | TIRUVALLUR | TAMIL NADU | 602021 | ₹2.0 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | M/S. ABL CONSTRUCTIONS L2 | M/S.J M Constructions L1 |
|---|---|---|---|---|---|
| 1.00Formation of approach road and construction of Culvert to SIDCO New Industrial Estate in Kaverirajapuram Panchayat at Tiruvalangadu Block | |||||
| 2.00Clearing and Grubbing Road Land Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete. | |||||
| 3.00 | Km 0/0-1/260 | 1,701 | sqm | 6.5 ₹11,056.50 | 5.8 ₹9,865.80 |
| 4.00Earthwork for shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth) | |||||
| 5.00 | Km 0/0-1/260 | 1,578.17 | cum | 145 ₹2.3 L | 135.75 ₹2.1 L |
| 6.00Gravel Shoulder Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | |||||
| 7.00 | Km 0/0-1/0 | 311.21 | cum | 925 ₹2.9 L | 895 ₹2.8 L |
| 8.00 | Km 1/0-1/260 | 60.75 | cum | 925 ₹56,193.75 | 895 ₹54,371.25 |
| 9.00Granular sub base for widening portion Construction of Granular Sub base Grade III by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | |||||
| 10.00 | Km 0/0-1/0 | 697.73 | cum | 2,750 ₹19.2 L | 2,650 ₹18.5 L |
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
13 Feb 2026, 3:00 pmClosed
Project Director/Joint Director
DRDA Tiruvallur
Formation of approach road and construction of Culvert to SIDCO New Industrial Estate in Kaverirajapuram Panchayat at Tiruvalangadu Block
2026_RDTN_652445_1
1621/2025/A2
Open Tender
Civil Works
180 days
Tiruvalangadu Block
Refer tender document
5 documents required · 5 mandatory
₹0
₹2.0 L
Yes
2 Mar 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
9 Feb 2026
Formation of approach road and construction of Culvert to SIDCO New Industrial Estate in Kaverirajapuram Panchayat at Tiruvalangadu Block
Clearing and Grubbing Road Land Clearing the Scrub jungle removing from away site including incidential charges and all labour charges with burning and ashes including all labour charges etc,..complete.
Earthwork for shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1. (Using Borrow pit Earth)
Gravel Shoulder Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Granular sub base for widening portion Construction of Granular Sub base Grade III by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
WET MIX MACADAM Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 225mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
PRIMER COAT Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc., Complete
TACK COAT 2.5 KG Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
BITUMINOUS MACADAM Providing and laying 50mm Compacted thick Bituminous macadam using 0.20cum of 26.50-13.2mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
BITUMINOUS CONCRETE Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
CC ROAD -CORE WALL EARTH WORK Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
CC ROAD -LEVELLING COURSE Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
CC ROAD CONCRETE OVER EXISTING ROAD BASE Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cemente concrtee pavement thickness as per design,over a prepared sub base with 43 grade cement or any other type as per clause 1501.2.2 M30 (Grade), coarse including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Construction of 2m Span Rcc Box Culvert at Ch.830
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Levelling course
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for Foundation
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and superstructure for Abutment /pier using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers etc.
Cement concrete 1:1.5:3 using 20mm and 10mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and shall be finished smooth with cement mortar 1:3, 12mm thick. and with kraft paper without claiming extra as directed by the departmental officers complete complying with standard specifications.
Supplying and fabrication of steel including cost and conveyance of steel to site and all labour charges for straightening, cutting to length,bending to shape and tying in position and forming grills for all R.C.C works
Providing and fixing sign board
Road Marker /Road stud with lens Reflector
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703
Ordinar Kilometer Stone (Precast)
200 m stone (precast)
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TVG01_TechnicalBid.pdf
Tender Documents • 0.66 MB
BOQ_782309.xls
BOQ • 0.35 MB
TVG01_PRICEBID.pdf
Additional Documents • 0.35 MB
Download all tender documents and submit your bid