| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹38.9 LAccepted-AOC | 1 | Accepted-AOC L1 BIDDER without GST | |
| 2 | 2₹44.9 L+₹4.8 L (12.0%)Rejected-Finance NO 01 ARCOT ROAD REMI COMPOUND AZHWARTHIRUNAGAR CHENNAI 600087 | CHENNAI | CHENNAI | TAMIL NADU | 600087 | 2 | Rejected-Finance L2 BIDDER |
Tender Value
₹42.6 L
EMD Value
₹42,600
Closing Date
13 Oct 2020, 2:00 pmClosed
CE/D/TANGEDCO/TIRUNELVELI
MAHARAJANAGAR TIRUNELVELI
Works Contract eTender for dismantling, loading and transporting of 6nos x 8MVA 33/11KV Power transformers and 4nos x 5MVA 33/11KV Power transformers from various Sub stations and unloading erection, hot oil circulation, cable laying, wiring, etc.
2020_EB_181262_1
CE/D/TIN/EE/SCH/WET-01/2020-21
Open Tender
Electrical Works
Works
365 days
TIRUNELVELI
AS PER SPECIFICATIONS
3 documents required · 3 mandatory
₹0
₹42,600
Yes
7 Dec 2020
25 Sept 2020
14 Oct 2020
25 Sept 2020
13 Oct 2020
25 Sept 2020
Amount
ABSTRACT
Labour charges for dismantling, loading and transporting of 6 nos x 8MVA 33/11KV Power transformer with RTC Panels from various Sub stations and unloading erection,hot oil circulation, cable laying, wiring, earthing, co-ordinate for testing, painting and commissioning at various Sub stations as per Allotment in Tirunelveli region for the period of one year contract basis.
Labour charges for dismantling, loading and transporting of 4nos x 5MVA 33/11KV Power transformer from various Sub stations and unloading erection,hot oil circulation, cable laying, wiring, earthing, co-ordinate for testing, painting and commissioning at various Sub stations as per Allotment in Tirunelveli region for the period of one year contract basis.
Description of Work / Item(s)
Dismantling of 8 MVA Power Transformer HV, LV Bushings, Radiators, Conservator Tank and other accessories including all lead, lift, T&Ps, Crane charges etc. complete
Labour for the Dismantling of RTC Control Panels includings consumables as directed by the field engineer.
Pull and placing of the allotted new Power Transformer at the existing substation for loading if required (30 Mtrs. For each Transformer) 22MT x 30
Loading of the Power Transformer main tank with oil and dismantled accessories including pulling distance of 5 Mtrs. In to the low bed truck, tieing with truck by steel rope, turn buckle etc. including all T&Ps complete.
Transporting of Power Transfomer wih accessories from one place to another substation as per allotment by low bed truck. (upto 600Km / Unit)
Upto 30MT Upto 100 Km ( fixed rate )
Beyond 100 km ( Rate / KM/MT ) PWD rate FOR 1 No. 8MVA 33/11 KV PR.TR (22MTx700KM)
Unloading of the Power Transformer main tank with oil and dismantled accessories including pulling distance of 5 M from the low bed truck to plinth or near by plinth including all T&Ps complete.
Pull and placing of the existing Power Transformer for distance of 30M (30M for each Transformer) if required at site to vacate the plinth (22MTx 30M)
Pull and placing the alloted New/SH Power Transformer upto plinth as per site condition(22MT x 30M)
Turning of new/SH Transformer for 90o at site if required as per the site condition.
Labour charges for erection of 8MVA Power Transformer's Radiators, conservator tank and other accessories including minor welding works wherever necessary, minor transport of transformer accessories, tools etc. complete including the cost of sundry items such as soap, cotton waste, enamel paint, kerosin, in all respect, all lead, lift, T&Ps, Crane charges etc. complete. excluding the cost of Gasket, electricity used for this work.
Labour for the Erection of RTC Control Panels includings consumables as directed by the field engineer.
Labour charges for transformer oil in the transformer and OLTC under Hot oil circulation including vacuum drying whenever applicable for 72Hrs. Or necessary to achieve the required level and circulation of oil till satisfactory results are obtained before commissioning. The fillter will be provided by contractor.
Upto 5,000 Litres
Above 5000 Ltrs
Labour charges for providing neutral bushing earthing, body earthing, channel erection, stop block welding, excavation and refilling etc. excluding the cost of MS channel and MS flat which will be supplied by the Board
Labour charges for spray painting of Power transformer and accessories including cost of enamel colour paint for valve marking waste, kerosine, soap etc. complete upto but including the cost of paint
Labour charges for loading transporting unloading of 40 - 45 Gallen capacity of empty barrels from the store to the site where the power transformer to be loaded by 10MT capacity lorrry upto 1800KM (5 Barrels x 200KM per unit)
Laying of control cable in cable duct including minor transporting binding etc. excluding cost of cables and loading of balance materials from the site for devolution.
Up to 8 Core
Above 8 Core
Labour charges for removing the cables sheaths, checking continuity inserting number and letter ferreules taping perfectly and neatly routing the leads inside the panels and mechansim box terminating the leads with lugs and tieing with belt as per drawing including cost of lugs, ferrules belt and button etc. complete
Labour charges for removing the cables sheaths, cutting armour and providing with cable glands including providing holes in the panels, mechanism box etc. for inserting of cables as per drawing including the cost of cable glands, Excluding cost of electricity used for this work including the cost for extra holes for future usage as per instruction of site Engineer
16mm cable gland
19mm cable gland
32mm cable gland
35mm cable gland
Supply of Terminal connectors various size "T", "L", "SE" Clamps
Supply of Yellow empire tape
Supply of Gasket 900 x 900 x 8mm
Supply of Gasket 900 x 900 x 6mm
Supply of Gasket 900 x 900 x 3mm
Supply of Gasket 900 x 900 x 10mm
Description of Work / Item(s)
Amount
Dismantling of 5MVA Power Transformer HV, LV Bushings, Radiators, Conservator Tank and other accessories including all lead, lift, T&Ps, Crane charges etc. complete
Pull and placing of the allotted new Power Transformer at the existing substation for loading if required (30 Mtrs. For each Transformer) (18MT x 30Mtrs)
Loading of the Power Transformer main tank with oil and dismantled accessories including pulling distance of 5 Mtrs. In to the low bed truck, tieing with truck by steel rope, turn buckle etc. including all T&Ps complete.
Transporting of Power Transfomer wih accessories from one place to another substation as per allotment by low bed truck. (upto 800Km / Unit)
Upto 30MT Upto 100 Km ( fixed rate )
Beyond 100 km ( Rate / KM/MT)(For 18MTX700Kms)
Unloading of the Power Transformer main tank with oil and dismantled accessories including pulling distance of 5 M from the low bed truck to plinth or near by plinth including all T&Ps complete.
Pull and placing of the existing Power Transformer for distance of 30M (30M for each Transformer) if required at site to vacate the plinth (18x 30)
Pull and placing the alloted new/SH Power Transformer upto plinth as per site condition(18x 30)
Turning of new/SH Transformer for 90° at site if required as per the site condition.
Labour charges for erection of 5MVA Power Transformer's Radiators, conservator tank and other accessories including minor welding works wherever necessary, minor transport of transformer accessories, tools etc. complete including the cost of sundry items such as soap, cotton waste, enamel paint, kerosin, in all respect, all lead, lift, T&Ps, Crane charges etc. complete. excluding the cost of Gasket, electricity used for this work.
Labour charges for transformer oil in the transformer and OLTC under Hot oil circulation including vacuum drying whenever applicable for 72Hrs. Or necessary to achieve the required level and circulation of oil till satisfactory results are obtained before commissioning
Upto 5,000 Litres
Above 5000 Litres
Labour charges for providing neutral bushing earthing, body earthing, channel erection, stop block welding, excavation and refilling etc. excluding the cost of MS channel and MS flat which will be supplied by the Board
Labour charges for spray painting of Power transformer and accessories including cost of enamel colour paint for valve marking waste, kerosine, soap etc. complete upto but including the cost of paint
Labour charges for loading transporting unloading of 40 - 45 Gallen capacity of empty barrels from the store to the site where the power transformer to be loaded by 10MT capacity lorrry upto 1800KM (5 Barrels x 200KM per unit )
Laying of control cable in cable duct including minor transporting binding etc. excluding cost of cables and loading of balance materials from the site for devolution.
Up to 8 Core
Above 8 Core
Labour charges for removing the cables sheaths, checking continuity inserting number and letter ferreules taping perfectly and neatly routing the leads inside the panels and mechansim box terminating the leads with lugs and tieing with belt as per drawing including cost of lugs, ferrules belt and button etc. complete
Labour charges for removing the cables sheaths, cutting armour and providing with cable glands including providing holes in the panels, mechanism box etc. for inserting of cables as per drawing including the cost of cable glands, Excluding cost of electricity used for this work including the cost for extra holes for future usage as per instruction of site Engineer
16mm cable gland
19mm cable gland
32mm cable gland
35mm cable gland
Supply of Terminal connectors various size "T", "L", "SE" Clamps
Supply of Yellow empire tape
Supply of Gasket 900 x 900 x 8mm
Supply of Gasket 900 x 900 x 6mm
Supply of Gasket 900 x 900 x 3mm
Supply of Gasket 900 x 900 x 10mm
SHRI MEENATCHI ENGINEERING
SHRI MEENATCHI ENGINEERING
SHRI MEENATCHI ENGINEERING
Bidder Name
SHRI MEENATCHI ENGINEERING
SHIVANI LAKSHMI CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .