Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.7 LAccepted-AOC 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L1 | Accepted-AOC Being L1 Bidder | |
| 2 | L2₹24.8 L+₹10,920.40 (0.44%)Rejected-AOC DANGALPARA P O P S SURI BIRBHUM PIN 731101 | SURI | BIRBHUM | WEST BENGAL | 731101 | L2 | Rejected-AOC Being L2 Bidder | |
| 3 | L3₹25.0 L+₹23,519.90 (0.95%)Rejected-Finance BALLAVPUR BOLPUR BIRBHUM | BOLPUR | BIRBHUM | WEST BENGAL | L3 | Rejected-Finance BEING L3 BIDDER |
Tender Value
Refer Docs
EMD Value
₹50,400
Closing Date
13 Mar 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer,PWD,Birbhum ELectrical Division
Laldighipara, P.O. SuriDist. Birbhum. Pin. 731101 Near SuriSadar Hospital
Temporary Electrification for accommodating CAPF for WBLA ELECTION 2021 in the District of Birbhum ........12 nos of School under MARGRAM PS.
2021_WBPWD_329917_1
BIRED/46/e-Q (1st call) of 2020-2021
Open Tender
FIRE FIGHTING ORG
Item Rate
7 days
Margram Birbhum
Please refer Tender documents.
8 documents required · 8 mandatory
₹50,400
3 Aug 2021
5 Mar 2021
16 Mar 2021
5 Mar 2021
13 Mar 2021
5 Mar 2021
120 days
Amount
S & installation on hire basis following switches etc. on wooden plank board or suitable angle iron frame incl. providing inter conection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approve materials). 415 Volt,63 Amp. TPNIC Main Switch with cut out - (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
415 Volt, 63 Amp. FP Change Over Switch (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
415 Volt, 100 Amp. capacity Bus Bar chamber with 4 Nos. Cu / Al Bar (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
S & providing on hire basis 500V, 32A / way, 6 way PDB with isolator on wooden plank board or suitable angle iron frame incl. providing inter coonection, socketing, earthing attachment etc. & dismantling the same at the end of the function (With PWD approved materials). (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
S & providing on hire basis Main Switch with 1.1 KV grade PVC / A Al cable of folllowing sizes incl. laying in tranch / wall with shadding arrangement dismantling the same & mending good the damage at the end of the function (With PWD approve materials). (a) 4 core 16 sq. mm. PVC / A cable. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
(b) 2 core 4 to10 sq. mm. PVC / A cable. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
S & drawing on hire basis single core 2x 2.5 sqmm+1x 1.5 sqmm PVC Cu. wire incl. dismantling the same at the end of function. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
Distribution wiring in 3 x1.5 sqmm single core PVC Cu. Wire to light / fan points in alkathine pipe on hire basis & dismantling the same (Without individual control switch). (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
S & providing on hire basis 150 watt Metal Hallide/Sodium/ LED fitings with necessary clamping arrangemnt to be fixed on ST pole / wall incl. gear box & replacement of fuse lamp. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
S & providing on hire basis 4 Ft. 40 watt Single Tube Light/20 Watt LED tube Light (commercial type) fitings with necessary Tube lamp & replacement of fuse lamp. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
S & providing on hire basis 60/100 watt incandescent lamp. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
Supplying & Providing on hire basis 220 V AC 1200/1400 mm sweep ceiling fan with down rod as reqd. incl. dismantling the same. (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
Supplying & Providing on 600 mm sweep Air Circulator/Pedestal (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
Supplying & Providing on hire basis 2x 5 amp plug point on casing board with earthing attachment. (For Mobile Charger and Stand Fan) (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
Temporary earthing arrangement the hole system as per G.S. ( Earthing by spike/rod) (i) Up to 3 days -
(ii) Next 42 Days After 3 days -
Hiring & Installation charges for the following capacity DG Sets.incl. All accessories. 1 Nos 5KVA DG (1-phase) (FOR 9 NOS SCHOOL)
25 KVA DG (3- phase) (FOR 3 NOS SCHOOL)
Carrying charges for all materials and D.G set from agency work shop to work site and back to work shop after ending the program as per direction of E.I.C.
Cost of the running fuel of the above generator for load shading period and testing period.
Charges for Skilled Labour for maintenance of Electrical Installation work for 1person for 3nos school in each shift round the clock.
Charges for Skilled Labour for operation of D.G. set for 1 person in each shift round the clock at each school.
A) Add CESS @ 1% on "A"
N.B : Add 2% extra charge per day calculated on the fixed charges of 3 (Three) days for next 42 (Forty Two) days except Item No. from 31 to 36.
RIK ENTERPRISE
BINODE ROY
stage.html
html • 0.05 MB
technical_628086.pdf
PDF • 0.89 MB
techsummary_628086.pdf
PDF • 0.90 MB
finance_628086.pdf
PDF • 0.95 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_628086.pdf
PDF • 0.09 MB
dasenterprisemargram.pdf
PDF • 0.11 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .