| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-according tender condition no 14 required minimum 60.00 lac Turn Over in last three years but bidder have not qualified this turn over limit |
Tender Value
₹59.9 L
EMD Value
₹1.2 L
Closing Date
1 Jul 2026, 12:00 pmClosed
DCF Udaipur
chetak circle van bhanwan parisar udaipur
Construction of Boundary wall and Barbered wire Fencing work at Kalamata Nursery
2026_FORES_569818_1
23/2026-27
Open Tender
Civil Works
Percentage
Udaipur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Secretary, RREIS
₹1.2 L
Yes
2 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
1 Jul 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | NEW WALL 6 FEET
Clearing jungle including uprooting of rank vegetation, grass,brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 2,500 | sqm | 5 | ₹12,500 |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds | - | cum | 175 | - |
| 1.03 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level.In 1:5:10 40mm nominal size | - | cum | 2,956 | - |
| 1.04 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in : ( 1- Cement : 6- Sand) | 102.7 | cum | 2,838 | ₹2,91,462.6 |
| 1.05 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : ( 1- Cement : 6- Sand) | 354.15 | cum | 3,479 | ₹12,32,087.85 |
| 1.06 | Providing & fixing precast cement concrete coping 1 : 2: 4 mix 50mm thick complete as per specification : | 196.75 | sqm | 367 | ₹72,207.25 |
| 1.07 | Plaster on new surface on walls in cement sand mortar 1:3 including racking of joint etc. complete fine finish : 25 mm thick | 216 | sqm | 242 | ₹52,272 |
| 1.08 | Flush / Ruled/ Struck or weathered pointing.with cement mortar 1:3 (1 cement : 3 fine sand) : | 1,638 | sqm | 124 | ₹2,03,112 |
| 1.09 | POLE FENCING
150 cm high fencing of precast R.C. posts of 15cmx15cm tapered to 10x10cm at top placed at every 3m apart 30cm in ground embedded in cement concrete 1:3:6 (30x30x45cm) corner and every tenth posts to be strutted with same R.C. posts provided with 6 horizontal lines and two diagonals of black barbed wire between the two posts fitted and fixed with G.I. staples including earth work in excavation etc. complete | 100 | meter | 503 | ₹50,300 |
| 1.1 | WALL RAISING
Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in :
( 1- Cement : 6- Sand) | 566.89 | cum | 3,479 | ₹19,72,210.31 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
bid.pdf
Tender Documents • 4.63 MB
BOQ_1013955.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .