| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹91.5 CrAdmitted-Finance | ₹91.5 Cr | H1 | Admitted-Finance |
| 2 | H2₹88.4 CrAdmitted-Finance | ₹88.4 Cr | H2 | Admitted-Finance |
| 3 | H3₹85.6 CrAdmitted-Finance | ₹85.6 Cr | H3 | Admitted-Finance |
| 4 | H4₹85.5 CrAdmitted-Finance | ₹85.5 Cr | H4 | Admitted-Finance |
| 5 | H5₹79.7 CrAdmitted-Finance FIRST FLOOR 124 116 S A I 12 SHYAM KUNJ COMPLEX MERCHANT ROAD WARD NO 5 JALPAIGURI WEST BENGAL 735101 | JALPAIGURI | WEST BENGAL | 735101 | ₹79.7 Cr | H5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAY BALANAND CONSTRUCTION H4 | JAYVARUDI INFRACON PRIVATE LIMITED H1 | Jal Instruments H8 | M/s Jain and Rai Construction Co H6 | M/s Bhagwati Enterprises H9 | A T C H7 | R.R. AND SONS H5 | M/s Sourabh Constructions Pvt. Ltd. H3 | NAVADIYA BROTHERS PRIVATE LIMITED H2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.01 | 1. Design and build 2 Nos. sewage treatment plant of installed capacity 4 & 8 MLD and all appurtenant structures and allied works.
2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 5.0 Km length including survey, design, construction of 2 No. of Interception Diversion Structure & pumping station and all appurtenant structures and allied works; and
3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 700 m of dia 250&200 mm (ii) Treated water pumping main of HDPE pipe having length of 7773 m of dia 90 to 200 mm from Treated water OHT to nearby water body , park agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
4. Providing, laying, jointing, testing, commissioning of Sewage pumping main of RCC NP-3 pipe having length of 30 m of dia 500 mm from I&D Structure to Pumping station including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete.
5. 2 Nos Treated Water Sump ,2 Nos. OHT with 4 Nos Pump House for reuse.
6. Construction of 1.3 km RCC Drain .
7. Construction of Boundary wall at around STP
8. Construction of 2 Nos screen chamber.
9. Construction of approach CC Road up to Both STP.
10. Providing, Supplying and erection of Electric 2 Nos of 63 KVA Sub Station and 1 km HT Feeder line including required electric conductor with all necessary equipment’s and fittings complete in all respect
11. Providing, Supplying SCADA & Instrumentation items at Both STP. | 1 | nos | 24,02,96,096.6 ₹24.0 Cr | 28,75,64,000 ₹28.8 Cr | 23,74,39,560 ₹23.7 Cr | 35,50,20,250 ₹35.5 Cr | 23,00,00,000 ₹23 Cr | 26,56,01,803.74 ₹26.6 Cr | 26,69,66,000 ₹26.7 Cr | 29,90,00,000 ₹29.9 Cr | 24,82,49,025 ₹24.8 Cr |
| 1.02 | Operation and Maintenance Cost next 10 Years | 1 | nos | - | - | - | - | - | - | - | - | - |
| 1.03 | 1st Year | 1 | nos | 2,13,45,061.41 ₹2.1 Cr | 2,40,00,000 ₹2.4 Cr | 86,00,000 ₹86 L | 80,00,000 ₹80 L | 50,00,000 ₹50 L | 1,88,00,000 ₹1.9 Cr | 2,00,00,000 ₹2 Cr | 1,90,00,000 ₹1.9 Cr | 1,60,00,000 ₹1.6 Cr |
| 1.04 | 2nd Year | 1 | nos | 2,26,25,765.09 ₹2.3 Cr | 2,65,00,000 ₹2.6 Cr | 91,16,000 ₹91.2 L | 90,00,000 ₹90 L | 54,00,000 ₹54 L | 1,88,00,000 ₹1.9 Cr | 2,00,00,000 ₹2 Cr | 2,12,00,000 ₹2.1 Cr | 1,70,00,000 ₹1.7 Cr |
| 1.05 | 3rd Year | 1 | nos | 2,39,83,311 ₹2.4 Cr | 2,72,00,000 ₹2.7 Cr | 96,62,960 ₹96.6 L | 1,02,00,000 ₹1.0 Cr | 58,32,000 ₹58.3 L | 1,88,00,000 ₹1.9 Cr | 2,25,00,000 ₹2.3 Cr | 2,24,00,000 ₹2.2 Cr | 1,90,00,000 ₹1.9 Cr |
| 1.06 | 4th Year | 1 | nos | 2,54,22,310 ₹2.5 Cr | 2,95,00,000 ₹3.0 Cr | 1,02,42,737.6 ₹1.0 Cr | 1,50,00,000 ₹1.5 Cr | 62,98,560 ₹63.0 L | 1,88,00,000 ₹1.9 Cr | 2,25,00,000 ₹2.3 Cr | 2,38,00,000 ₹2.4 Cr | 1,95,00,000 ₹1.9 Cr |
| 1.07 | 5th Year | 1 | nos | 2,69,47,648.35 ₹2.7 Cr | 3,12,00,000 ₹3.1 Cr | 1,08,57,301.86 ₹1.1 Cr | 1,50,00,000 ₹1.5 Cr | 68,02,444 ₹68.0 L | 1,88,00,000 ₹1.9 Cr | 2,50,00,000 ₹2.5 Cr | 2,52,49,000 ₹2.5 Cr | 2,00,00,000 ₹2 Cr |
| 1.08 | 6th Year | 1 | nos | 2,85,64,506.98 ₹2.9 Cr | 3,50,00,000 ₹3.5 Cr | 1,15,08,739.97 ₹1.2 Cr | 1,50,00,000 ₹1.5 Cr | 73,46,639 ₹73.5 L | 1,88,00,000 ₹1.9 Cr | 2,50,00,000 ₹2.5 Cr | 2,67,00,000 ₹2.7 Cr | 3,00,00,000 ₹3 Cr |
| 1.09 | 7th Year | 1 | nos | 3,02,78,377.49 ₹3.0 Cr | 3,70,00,000 ₹3.7 Cr | 1,21,99,264.37 ₹1.2 Cr | 1,50,00,000 ₹1.5 Cr | 79,34,370 ₹79.3 L | 1,88,00,000 ₹1.9 Cr | 2,50,00,000 ₹2.5 Cr | 2,84,00,000 ₹2.8 Cr | 4,00,00,000 ₹4 Cr |
| 1.10 | 8th Year | 1 | nos | 3,20,95,079.92 ₹3.2 Cr | 3,90,00,000 ₹3.9 Cr | 1,29,31,220.23 ₹1.3 Cr | 1,50,00,000 ₹1.5 Cr | 85,69,119 ₹85.7 L | 1,88,00,000 ₹1.9 Cr | 3,00,00,000 ₹3 Cr | 3,00,00,000 ₹3 Cr | 5,00,00,000 ₹5 Cr |
Tender Value
₹26.7 Cr
EMD Value
₹13.3 L
Closing Date
9 Mar 2026, 5:30 pmClosed
Chief Municipal Officer
Nagar Palika Office Ashoknagar
Interception and Diversion of Nallahs with STP works Project of Ashoknagar town under SBM 2.0
2026_UAD_479978_1
Technical/2026/749 DT 03/02/2026
Open Tender
Civil Works - Others
540 days
Ashoknagar
Please refer Tender documents.
4 documents required · 4 mandatory
₹50,000
₹13.3 L
Nagar Palika Office Ashoknagar
7 May 2026
4 Feb 2026
11 Mar 2026
4 Feb 2026
9 Mar 2026
10 Feb 2026
18 Feb 2026
1. Design and build 2 Nos. sewage treatment plant of installed capacity 4 & 8 MLD and all appurtenant structures and allied works. 2. Survey, review the designs, redesign where necessary, and diversion works of Nallahs with interception sewer of about 5.0 Km length including survey, design, construction of 2 No. of Interception Diversion Structure & pumping station and all appurtenant structures and allied works; and 3. Providing, laying, jointing, testing, commissioning of (i) Sewage pumping main of DI K-7 pipe having length of 700 m of dia 250&200 mm (ii) Treated water pumping main of HDPE pipe having length of 7773 m of dia 90 to 200 mm from Treated water OHT to nearby water body , park agriculture Land/River including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. 4. Providing, laying, jointing, testing, commissioning of Sewage pumping main of RCC NP-3 pipe having length of 30 m of dia 500 mm from I&D Structure to Pumping station including excavation, refilling, road cutting/dismantling, restoration, providing valves and specials and fittings all complete. 5. 2 Nos Treated Water Sump ,2 Nos. OHT with 4 Nos Pump House for reuse. 6. Construction of 1.3 km RCC Drain . 7. Construction of Boundary wall at around STP 8. Construction of 2 Nos screen chamber. 9. Construction of approach CC Road up to Both STP. 10. Providing, Supplying and erection of Electric 2 Nos of 63 KVA Sub Station and 1 km HT Feeder line including required electric conductor with all necessary equipment’s and fittings complete in all respect 11. Providing, Supplying SCADA & Instrumentation items at Both STP.
Operation and Maintenance Cost next 10 Years
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of O&M taking Discount factor at 11% (Cost in INR)(B)
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Power Consuption @ 6.5 Rs per unit
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
NPV of Power Consumption taking discount factor at 11% (Cost in INR) ©
1st Year
2nd Year
3rd Year
4th Year
5th Year
6th Year
7th Year
8th Year
9th Year
10th Year
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
specificationcompressed.pdf
Tender Documents • 20.72 MB
TenderDOCcompressed.pdf
Tender Documents • 18.53 MB
BOQ_564051.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid