| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAdmitted-Finance GARHWA | JHARKHAND | 822112 | ₹2.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.8 Cr+₹9.6 L (3.49%)Admitted-Finance BANK COLONY ROAD PISKA MORE PISKA PANDRA RANCHI | RANCHI | RANCHI | JHARKHAND | ₹2.8 Cr+₹9.6 L (3.49%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Others-Did not submit hard copy of EMD and Cost of Tender Paper |
| Sl No | Description | Qty | Unit | M/s Ganga Construction L2 | M/s MAA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
(i) depth upto 3 m | 1,101.82 | cum | 44.98 ₹49,559.86 | 43.45 ₹47,874.08 Lowest |
| 2.00 | Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
(ii) 3 m to 6 m depth | 843.12 | cum | 51.56 ₹43,471.27 | 49.8 ₹41,987.38 Lowest |
| 3.00 | Excavation for Structures Ordinary rock (not requiring blasting) (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) | 550.9 | cum | 55.95 ₹30,822.86 | 54 ₹29,748.6 Lowest |
| 4.00 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification | 365.09 | cum | 710.86 ₹2,59,527.88 | 686.8 ₹2,50,743.81 Lowest |
| 5.00 | PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) | 31.75 | cum | 4,876.3 ₹1,54,822.53 | 4,711.8 ₹1,49,599.65 Lowest |
| 6.00 | PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification | 7.88 | cum | 5,348.2 ₹42,143.82 | 5,167.8 ₹40,722.26 Lowest |
| 7.00 | Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications M-25(USING CONCRETE MIXER) | 706.79 | cum | 6,322.12 ₹44,68,411.19 | 6,108.9 ₹43,17,709.43 Lowest |
| 8.00 | Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications M-25(USING CONCRETE MIXER)
Height upto 5m | 132.86 | cum | 6,627.09 ₹8,80,475.18 | 6,404 ₹8,50,835.44 Lowest |
| 9.00 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications | 500 | NO | 109.7 ₹54,850 | 106 ₹53,000 Lowest |
| 10.00 | Reinforced cement concrete approach slab (M-30 GRADE)including reinforcement and formwork complete as per drawing and Technical specification | 186.19 | cum | 9,849.35 ₹18,33,850.48 | 9,517.1 ₹17,71,988.85 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.6 L
Closing Date
25 Apr 2022, 12:00 pmClosed
Executive Engineer, R.C.D., Road Division, Garhwa
Executive Engineer, R.C.D., Road Division, Garhwa
Construction of H.L. Bridge Over Saraswati River Near Majhiaon More in Garhwa Town under R.C.D., Road Division, Garhwa for the year of 2022-23
2022_CECOM_58019_1
RCD/GARHWA/439/2022-23
Open Tender
Civil Works - Bridges
Item Wise
360 days
work
Please Refer Tender Document
3 documents required · 3 mandatory
₹10,000
Executive Engineer, R.C.D., Road Division, Garhwa
₹2.6 L
2 Jun 2022
19 Apr 2022
27 Apr 2022
19 Apr 2022
25 Apr 2022
19 Apr 2022
Amount
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (i) depth upto 3 m
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (ii) 3 m to 6 m depth
Excavation for Structures Ordinary rock (not requiring blasting) (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications M-25(USING CONCRETE MIXER)
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications M-25(USING CONCRETE MIXER) Height upto 5m
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Reinforced cement concrete approach slab (M-30 GRADE)including reinforcement and formwork complete as per drawing and Technical specification
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)
Providing and fixing of street light at edge... all complete job as per drawing and Technical specification. 5 mtr pole
Providing and fixing of street light at edge... all complete job as per drawing and Technical specification. 25w post top
Providing and fixing of street light at edge... all complete job as per drawing and Technical specification. pole arm
Providing and fixing of street light at edge... all complete job as per drawing and Technical specification. lithium phosphate battery 36AH
Providing and fixing of street light at edge... all complete job as per drawing and Technical specification. solar module 50W(2NOS)
steel pipe 50mm external dia as per IS:1239
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control )
Providing anchroging of slab with pier and abutment cap
Providing Linner (shoring and sheet piling to protect esisting bridge)
Drainage Spouts complete as per drawing and Technical specification
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications
Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)
Carrying out confirmatory boring for soil investigating/geotechnical investigation for each foundation as per clause2400 of most specfication
DEWATERING For Foundation
Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (including Royalty @ Rs. 30.00 per Cum but excluding watering, rolling & compaction)
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.WITH VG-30 BULK BUTIMEN
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 60cmx60cm square
Direction and Place Identification Signs upto 0.9 sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
Supplying and installation of delineators (road way indicators, hazard markers, object markers), 80-100 cm high above ground level, painted black and white in 15 cm wide strips, fitted with 80 x 100 mm rectangular or 75 mm dia circular reflectorised panels at the top, buried or pressed into the ground and conforming toIRC-79 and the drawings.
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.
Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) RCC
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) STONE MASONARY
Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) PCC
Add 12% GST on Total Amount of Civil Work (Sl. No. 1 to 49)
Add 1% Labour Cess on Total Amount of Civil Work (Sl. No. 1 to 49)+12%GST
M/s Ganga Construction
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .