| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹76.1 L+₹1.7 L (2.33%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not enough bid capacity to participate in this lot, So Not Qualify with eligibility criteria | |
| 4 | Rejected-Technical | - | Rejected-Technical Required work experience not available, So Not Qualify with eligibility criteria |
Tender Value
₹70 L
EMD Value
₹1.4 L
Closing Date
14 Feb 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Office of The Superintending Engineer IV Circle Ir
Office of The Superintending Engineer IV Circle Irrigation Works Jhansi
Lot-5 Estimate for C.C. Lining from km. 0.200 to 3.015 of Palar Minor at Dist. Jhansi
2023_UPIDC_765454_5
02/SE-IV/2022-23
Open Tender
Civil Works
Item Rate
120 days
Jhansi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,590
₹1.4 L
13 Jun 2023
10 Jan 2023
14 Feb 2023
10 Jan 2023
14 Feb 2023
10 Jan 2023
Amount
Earth work in excavation including all lead and lift etc. with mannial compaction dressing etc.
Centering & Shuttering with all cost of material, labour, T&P, etc. required for proper completion of work
S/L C.C. 1:2:4 i/c all cost of labour, material, T&P etc
Preparation of sub grade for lining work with leveling & dressing & compaction with watering complete.
Laying 50 MM thick sand i/c all cost of labour & material, T&P etc
S/laying L.D.P.E. Film 200 micron on base of c.c. lining i/c all cost of labour & material, T&P etc.
Filling Betumin sealing compounad for every groove 14x27 mm i/c all cost of labour, material & T&P etc
C.C. 1:1.5:3 i/c all cost of labour, material, T&P etc
Centering shuttering for R.C.C. work i/c all cost of labour, material, T&P etc
Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes,T&P etc complete required for proper completion of work.
R. C.C. 1:1.5:3 i/c all cost of labour, material, T&P etc
Cutting under heary growth and bushes upto 7.5 cm dia with removal of roots with collection and disposal etc.
M/S SHYAM ASSOCIATE
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .