Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹1.8 L
EMD Value
₹3,500
Closing Date
25 Jul 2020, 12:00 pmClosed
Executive Engineer PWD R and B Division Kathua
Executive Engineer PWD R and B Division Kathua
BOQ
2020_PWDJK_100803_1
e-NIT No. 41 of 2020-21/3634-43-10/G dt 17-7-2020
Open Tender
Civil Works - Roads
Item Wise
30 days
Lathua
NIT
6 documents required · 6 mandatory
₹600
Executive Engineer PWD R and B Division Kathua
₹3,500
30 Jul 2020
20 Jul 2020
27 Jul 2020
20 Jul 2020
25 Jul 2020
20 Jul 2020
Amount
Earth work excavation in all kind of soil in trenches for foundations, drains, pipes, cables etc. ( Not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5m incl. disposal/filling of excavated earth all leads & lifts complete.
Providing & laying in position cement concrete 1:5:10 (cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) of specified grade excl. the cost of centring & shuttering incl. all leads, lifts & carriage of material by MT/ H.L.- All work upto plinth level.
Providing & laying in position cement concrete of specified grade excluding the cost of centring & shuttering incl. all leads, lifts & carriage of material by MT/H.L.-All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand :6 graded crushed stone agg. 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work upto plinth level. 1:1.5:3 ( 1 cement : 1.5 coarse sand: 3 graded crushed stone aggregate 20 mm nominal size) including all leads, lifts and carriage of material by MT / H.L.
Reinforcement for RCC work including raightening, cutting, bending, placing in position and binding all complete Thermo Mechanically Treated bars /Cold twisted bars including all leads, lifts and carriage of material by MT / H.L.
Centring and shuttering including strutting propping etc and removal of form work for
Foundations, footings, bases of columns etc. for mass concrete
Suspended floors, roofs, landings, balconies & access platform.
Edges of slab and breaks in floors and walls upto 20 cm wide
Swaran Singh
JASBIR SINGH
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .