| Sl No | Description | Qty | Unit | T Vaithy L2 | JM CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift | 491 | m3 | 109 ₹53,519 | 108 ₹53,028 Lowest |
| 1.10 | Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification. | 305 | Cum | 330 ₹1,00,650 | 326 ₹99,430 Lowest |
| 1.20 | Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 113 | m3 | 5,226 ₹5,90,538 | 5,164 ₹5,83,532 Lowest |
| 1.30Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification | |||||
| 1.40 | a). Drain works Below 1m Height | 396 | m2 | 528 ₹2,09,088 | 521 ₹2,06,316 Lowest |
| 1.50 | Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification | 30 | m3 | 6,571 ₹1,97,130 | 6,493 ₹1,94,790 Lowest |
| 1.60 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 113 | m2 | 7,193 ₹8,12,809 | 7,108 ₹8,03,204 Lowest |
| 1.70 | Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification. | 328 | m3 | 69 ₹22,632 | 68 ₹22,304 Lowest |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
25 Apr 2025, 3:00 pmClosed
THE COMMISSIONER
Salem City Municipal Corporation, Fort Main Road, Salem.
Formation of cc lane at Saminathapuram North Cross,Saminathapuram South Cross,Vanniyar nagar North cross-2,Vanniyar nagar north cross-4,VMR Nagar EB Office Road East Side Cross-1,VMR NAGAR CROSS ST, IN DIV -25,26 ZONE-1
2025_MAWS_542130_1
E8-Est No 43-R-2024-2025
Open Tender
Civil Works
Lump-sum
90 days
Salem city Municipal Corporation
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹24,000
21 Aug 2026
9 Apr 2025
25 Apr 2025
9 Apr 2025
25 Apr 2025
9 Apr 2025
Amount
Earth work excavation for foundation in ordinary soil, light black cotton sandy loam and dry silt including shoring, strutting, baling or pumping out water wherever necessary and refilling the sides of foundation with excavated earth in layers of 15cm thick and depositing the surplus earth at places as directed by the departmental officers with initial lead and lift
Supplying and filling in foundation and basement with Well Gravel in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain cement concrete 1:4:8 mix (One cement four sand and eight aggregate) using 40mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification
a). Drain works Below 1m Height
Plain cement concrete 1:2:4 mix (One cement two sand and four aggregate) using 20mm size ISS gauge HBBG metal including mixing, laying, consolidating, curing, cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification
Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification
Conveyance of Excavated Excess Earth away from the site to 2km including loading and transportation charges etc., complete as per standard Specification.
T Vaithy (BID ID -1304935)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .