| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-Finance | ₹9.9 L | L1 | Accepted-Finance Less |
| 2 | L2₹9.9 LRejected-Finance | ₹9.9 L | L2 | Rejected-Finance Second Less |
| Sl No | Description | Qty | Unit | Narayanan&co L2 | sangeetha L1 |
|---|---|---|---|---|---|
| 1.00Construction of Kalaiyarangam at P U Ele School Nedumbuli Village in Nedumbuli Panchayat | |||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation. | 36.42 | cum | 263 ₹9,578 | 260 ₹9,469 |
| 3.00 | Refilling the basement with excavated earth other than sand complying the cost and conveyance to the site and all labour for filling as per standard specifications | 18.56 | cum | 45 ₹835 | 45 ₹835 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 8.23 | cum | 5,551 ₹45,685 | 5,550 ₹45,677 |
| 5.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 9.49 | cum | 6,181 ₹58,658 | 6,180 ₹58,648 |
| 6.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete | 21.09 | cum | 9,292 ₹2.0 L | 9,291 ₹2.0 L |
| 7.00Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | |||||
| 8.00 | Upto Ground level: | 51.93 | Sqm | 547.5 ₹28,432 | 547 ₹28,406 |
| 9.00 | Above GL | 104.71 | Sqm | 1,095 ₹1.1 L | 1,095 ₹1.1 L |
| 10.00 | Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete. | 1.65 | MT | 91,932.1 ₹1.5 L | 91,932 ₹1.5 L |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
12 Mar 2026, 4:00 pmClosed
The President
The President Panchayat Office Nedumbuli
Construction of Kalaiyarangam at P U Ele School Nedumbuli Village in Nedumbuli Panchayat
2026_RDTN_673686_1
A3/2972/2025
Open Tender
Civil Works
Panchayat Office Nedumbuli
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹10,000
Yes
28 Mar 2026
12 Mar 2026
12 Mar 2026
12 Mar 2026
12 Mar 2026
12 Mar 2026
Construction of Kalaiyarangam at P U Ele School Nedumbuli Village in Nedumbuli Panchayat
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundation.
Refilling the basement with excavated earth other than sand complying the cost and conveyance to the site and all labour for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete
Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc.
Upto Ground level:
Above GL
Supply and fabrication of steel including cost and conveyance and all labour charges etc. complete.
Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc.
Plastering with cement mortar 1:3, 10mm thick including cost and conveyance and all labour charges etc.
Painting two coat with ready mixed plastic emulsion of first quality paint and of approved colour over a priming coat including thorogh scarpping clean removal of dirt etc complete.
Paving the flooring with special type of flooring tiles (Cement Based Hydraulically ) pressed Anti Skid tiles ( 20mm thick ) in CM 1:3, 20mm thick
Weathering coarse concrete using 20mm size broken brick jelly with in pure slaked lime over the RCC Roof in the proportion of 32 : 12 1/2 by volume laid in layer beating the concrete with the wooden batters etc as per standard specifications
Finishing Top of Roof with one Couse of pressed Tiles set in cm:1:3 Mix using tiles of size 20x20x2 cm including cost and conveyance and labour charges etc complete.
Light Point
Fan Point
Plug Point
Ceilling Fan
CFL Lamp
Tube Light Fitting
GI Pipe
Service Wire
Bulk Head Fitting
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_809791.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid