Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹30.0 LAccepted-Finance | ₹30.0 L | 1 | Accepted-Finance Accepted |
| 2 | 2₹33.6 L+₹3.6 L (12.1%)Accepted-Finance | ₹33.6 L+₹3.6 L (12.1%) | 2 | Accepted-Finance Accepted |
| 3 | 3₹35.2 L+₹5.2 L (17.3%)Accepted-Finance | ₹35.2 L+₹5.2 L (17.3%) | 3 | Accepted-Finance Accepted |
| 4 | Not Admitted-Finance | - | - | Not Admitted-Finance Others-High price |
| Sl No | Description | Qty | Unit | M/s Tashi Sona L1 | M/s Damzinla Enterprise L2 | M/s Norla Enterprise L3 |
|---|---|---|---|---|---|---|
| 1.00Site Clearance | ||||||
| 1.01 | Clearance and Grubbing Raod Land Clearing and grubbing road land including road land including uprooting wild vegetaion grass bushes, shrubs saplings and trees of girth 300mm, removal of stumps of such trees cut earlier and disposla of unserviceable materials and staking of serviceable materials to be used or auctioned upto a lead of 1000m including removal and disposal of top organic soil not exceeing 150mm in thickness as per technical specificattion clause 201
By manual means | 0.42 | Hact | 99,028 ₹41,591.76 Lowest | 99,028 ₹41,591.76 Lowest | 99,028 ₹41,591.76 Lowest |
| 1.02 | In area of non thorny jungle | 0.08 | Hact | 1,32,556 ₹10,604.48 Lowest | 1,32,556 ₹10,604.48 Lowest | 1,32,556 ₹10,604.48 Lowest |
| 2.00Earth Work (Cutting) | ||||||
| 2.01 | Earthwork in soil by manual means (excavation for roadway in sol using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and leads upto 1000m) | 2,217.1 | Cum | 250 ₹5,54,275 Lowest | 300 ₹6,65,130 | 350 ₹7,75,985 |
| 2.02 | Excavation in ordinary rock by manual means (Excavation in ordinary rock using manual means including laoding in turck and carrying of excavaged materials to embankment site with in all lifts and leads upto 1000m) | 3,667.92 | Cum | 500 ₹18,33,960 Lowest | 550 ₹20,17,356 | 560 ₹20,54,035.2 |
| 3.00Construction of Wooden Log Bridge 4m span | ||||||
| 3.01 | Providing approved best avaailable local wood for bottom (Class-BII) work in frames of log bridge and other frames wrought framed and fixed in position witth screws and nail | 673.05 | Tendcubicdm | 800 ₹5,38,440 Lowest | 900 ₹6,05,745 | 910 ₹6,12,475.5 |
| 3.02 | First class Indian teak wood 25mm wooden plankingg tongued and grooved in flooring bridge slab including fixing with screws and nails in complete | 4.2 | Sqm | 4,500 ₹18,900 Lowest | 5,000 ₹21,000 | 5,100 ₹21,420 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
17 Oct 2025, 5:00 pmClosed
Commanding Officer, 7 JAK RIF
7 JAK RIF, PIN-911107, C/O 99 APO, ALONG, WEST SIANG DISTT
Construction of 10 km trekking Route connecting Pasang Sonam and Seruptangla Lake Menchuka, Shi- Youmi District, Arunachal Pradesh
2025_ARMY_733939_1
2704/SAD/G/7JAKRIF/02
Open Tender
Construction Works
Works
60 days
Kabu Village, West Siang District, AP
As per RFP Document
2 documents required · 2 mandatory
₹100
Commanding Officer
₹60,000
7 JAK RIF UNIT LOCATION, ALONG, WEST SIANG DISTT
6 Nov 2025
6 Oct 2025
17 Oct 2025
6 Oct 2025
17 Oct 2025
6 Oct 2025
6 Oct 2025 - 17 Oct 2025
10 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.67 MB
BOQ
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .