| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.6 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹22.0 L+₹32,291 (1.49%)Rejected-AOC 9 KM STONE DELHI ROAD OPP JINDAL ROLING MILL HISAR 125006 | HISAR | HISAR | HARYANA | 125006 | 2 | Rejected-AOC L2 | |
| 3 | 3₹23.4 L+₹1.8 L (8.31%)Rejected-AOC 443 V P O PUTHI 131301 | PUTHI | SONIPAT | HARYANA | 131301 | 3 | Rejected-AOC L3 | |
| 4 | 4₹23.9 L+₹2.3 L (10.5%)Rejected-AOC 1 BARWALA 125121 | BARWALA | HISAR | HARYANA | 125121 | 4 | Rejected-AOC L4 | |
| 5 | 5₹24.2 L+₹2.6 L (11.9%)Rejected-AOC | 5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹50,960
Closing Date
17 Nov 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Fatehabad WS Division
Sinchai Bhawan Bhodia Khera, Fatehabad
Reconstruction of Bridge at RD 5000 Khundan Disty
2021_HRY_195273_1
75/2021-22
Open Tender
Civil Works
Item-rate/Agreement basic
180 days
Bridge at RD 5000 Kundan Disty
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,500
₹50,960
Yes
30 Nov 2021
11 Nov 2021
18 Nov 2021
11 Nov 2021
17 Nov 2021
11 Nov 2021
90 days
Amount
Works Details
Earth work in excavation by mechanical means (Hydraulic excavation)/manual means over areas (exceeding 30 cm in depth, 1.5 in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m as directed by Engineer-in-Charge, All kinds of Soil HSR item no. 4.12.1
Brick work in 1:3 (1cement: 3 course sand) mortar with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth (derived)
Providing and laying in position ready mixed plain cement concrete M-15 with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuousagitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-Charge.(Note: - Less cement used as per design mix is recoverable. However no extra payment shall be made if excess cement is used as per design mix for sleepers). M-15 grade plain cement concrete (cement concrete considered as per HSR item no. 6.22.1.2
Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, executing the cost of centering, shuttering finishing and reinforcement, including cost of admixtures in recommended proportions as per IS:9103 to accelerate/retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-Charge. All works above plinth level upto floor IV level as per HSR item no. 6.25.1
Steel reinforcement of thermo mechanically threaded bars of graded Fee-500D for RCC work, where not included in the complete rate of RCC i/c straightening, cutting bending, placing in position, binding, wastage. Overlaps welded joints, spacer bars, chairs, stays, hangers and anealed steel wires etc. complete in all respect above plinth level as per HSR item no. 6.33.6
Centering and shuttering i/c strutting, proping and removal of form work foundation, footing and bases of colomns etc. complete as per HSR item no. 6.29.1
Centering and shuttering including strutting, propping etc. and removal of form for columns, piers, abutments, pillars, posts and struts etc. as per HSR item no. 6.29.2
Centering and suttering i/c strutting, proping and removal of form work for roof, landing etc. complete as per HSR item no. 6.30.3
Filling expansion joints with special impervious hot pour, 12.5mm wide as per HSR item no. 14.18
Providing & laying in position cement concrete 1:3:6 with 8 graded stone aggregate of 20mm size in foundation and plinth excluding centering & shuttering complete in all respect as per HSR item no. 6.1.4
Brick work in 1:4 (1 cement 4 course sand) mortar with common burnt clay non-modular bricks of class designation 7.5 in foundation and plinth complete as per HSR item no. 7.21.1 (derived)
Providing and laying dry brick on edge flooring in required pattern with bricks of class designation 7.5 on a bed of 12 mm mud mortar, including filling joints with Jamuna sand, with common burnt clay non modular bricks complete as per HSR item no. 10.34
Supply and laying 1200mm dia RCC pipe NP-3 in correct levels and alignments HSR item no. 21.95.10
Removing hume pipes NP2/NP3/NP4 including excavation and taking out the pipes manually/by mechanical means and stacking the pipes within standard lead as per direction of Engineer-in-charge above 600 mm dia as per HSR item no. 5.53.2
Dismantling of brick masonry laid in cement sand mortar manually/by mechanical means i/c stacking, serviceable materials and disposal of unserviceable material with in 50 mtr lead or as per direction of Engineer-in-Charge complete as per HSR item no. 5.7.4
Dismantling of cement concrete 1:2:4 as HSR item no. 5.23.2
Dismantling of RCC 1:2:4 as per HSR item no. 5.25
Demolishing dry brick pitching in floors, drains etc. including stacking of serviceable material and disposal of unserviceable material within 50 mtrs. Lead complete as per HSR item no. 5.6
Credit for Old Brick masonry
Credit of Old Steel
Credit for Old RCC pipes 1200 mm dia NP3
AMIT OLA CONSTRUCTION CO.
MOHAN LAL
Lal Chand Contractor
Surender Kumar S/o Sh. Ram Nath Contractor
The Vishal Coop. Labour and Construction Society Ltd.
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .