Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹25.6 LAdmitted-Finance | -33.99% | ₹25.6 L | L1 | Admitted-Finance |
| 2 | L2₹26.4 L+₹79,883.37 (3.12%)Admitted-Finance | -31.93% | ₹26.4 L+₹79,883.37 (3.12%) | L2 | Admitted-Finance |
| 3 | L3₹27.1 L+₹1.6 L (6.06%)Admitted-Finance | -29.99% | ₹27.1 L+₹1.6 L (6.06%) | L3 | Admitted-Finance |
| 4 | L4₹27.3 L+₹1.7 L (6.71%)Admitted-Finance | -29.56% | ₹27.3 L+₹1.7 L (6.71%) | L4 | Admitted-Finance |
| 5 | L5₹28.6 L+₹3.0 L (11.6%)Admitted-Finance | -26.33% | ₹28.6 L+₹3.0 L (11.6%) | L5 | Admitted-Finance |
Tender Value
₹38.8 L
EMD Value
₹77,560
Closing Date
17 Jul 2026, 4:00 pmClosed
Executive Engineer RNb Dalgate DIvision Sgr
Executive Engineer RNb Dalgate DIvision Sgr
Construction of Additional Block for NTPHC at New Theed Harwan.
2026_PWDJK_315181_1
NIT No._27_/e-tendering /DAL/2026-27/_3550-58 Dt._08-07-2026
Open Tender
Civil Works
Percentage
90 days
Theed Harwan.
as per Nit
2 documents required · 2 mandatory
₹1,100
Executive Engineer RNb Dalgate DIvision Sgr
₹77,560
27 Jul 2026
8 Jul 2026
18 Jul 2026
9 Jul 2026
17 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 83.64 | Sqm | 10.59 | ₹885.75 |
| 2 | Engagement of JCB for leveling of ground, removal of undulations, slopes, hidges as per direction of EIC complete in all respects. | 5 | Hrs | 847.46 | ₹4,237.3 |
| 3 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 106.27 | Cum | 217.67 | ₹23,131.79 |
| 4 | Supplying and laying of Nallah Dry stone soling hand packed tightly including ramming, watering and filling of interstices including all carriages complete. | 13.27 | Cum | 805.08 | ₹10,683.41 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 10.95 | Cum | 4,409.24 | ₹48,281.18 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement: 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 29.13 | Cum | 6,600.34 | ₹1,92,267.9 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 44.7 | Cum | 5,585.81 | ₹2,49,685.71 |
| 8 | Brick work with common burnt clay selected bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12mm deep complete in cement mortar 1:6 (1 cement: 6 coarse sand) including curing complete in: Above plinth level and upto floor V level. | 43.43 | Cum | 7,650.17 | ₹3,32,246.88 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in: Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 5.95 | Cum | 6,416.57 | ₹38,178.59 |
| 10 | Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): kail wood. Second class | 0.97 | Cum | 85,662.58 | ₹83,092.7 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1021505.xls
BOQ • 0.46 MB
Ext27DS.pdf
PDF • 0.87 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .