Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 CrAdmitted-Finance CHINNAMPALAYAM POLLACHI | ₹8.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.2 CrAdmitted-Finance | ₹8.2 Cr | L2 | Admitted-Finance |
| 3 | L3₹8.4 CrAdmitted-Finance | ₹8.4 Cr | L3 | Admitted-Finance |
| 4 | L4₹8.4 CrAdmitted-Finance | ₹8.4 Cr | L4 | Admitted-Finance |
| 5 | L5₹8.4 CrAdmitted-Finance | ₹8.4 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Win Sudharsan Constructions L5 | Sirphy Builders L2 | ORANGERY INDIA SERVICES L6 | C.K.CONSTRUCTIONS L8 | CHITRAHEM CONSTRUCTION COMPANY L4 | Rajalakshmi Constructions L3 | P.A.CONSTRUCTIONS L7 | MK ROAD WORKS L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00for Maintenance of Ulandy Valley road from Topslip to Kozikamuthy Stretch -1 in Topslip of Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2025-26 | |||||||||||
| 1.01 | Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B | 3,664.2 | Cum | 170 ₹6.2 L | 200 ₹7.3 L | 200 ₹7.3 L | 244.25 ₹8.9 L | 180 ₹6.6 L | 184 ₹6.7 L | 211 ₹7.7 L | 183.11 ₹6.7 L |
| 1.02 | Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers | 1,410.75 | Cum | 6,200 ₹87.5 L | 6,000 ₹84.6 L | 6,200 ₹87.5 L | 8,577.54 ₹1.2 Cr | 5,750 ₹81.1 L | 5,700 ₹80.4 L | 6,606 ₹93.2 L | 5,721.51 ₹80.7 L |
| 1.03 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed. | 5,643 | Sqm | 1,150 ₹64.9 L | 1,050 ₹59.3 L | 1,200 ₹67.7 L | 1,814 ₹1.0 Cr | 1,040 ₹58.7 L | 1,020 ₹57.6 L | 1,306 ₹73.7 L | 1,131.22 ₹63.8 L |
| 1.04 | Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification. | 2,116.13 | Cum | 9,300 ₹2.0 Cr | 9,200 ₹1.9 Cr | 9,200 ₹1.9 Cr | 10,833 ₹2.3 Cr | 9,900 ₹2.1 Cr | 9,896 ₹2.1 Cr | 10,500 ₹2.2 Cr | 8,836.92 ₹1.9 Cr |
| 2.00for Maintenance of Ulandy Valley road from Topslip to Kozikamuthy Stretch -2 in Topslip of Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2025-26 | |||||||||||
| 2.10 | Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B | 1,263.2 | Cum | 160 ₹2.0 L | 200 ₹2.5 L | 200 ₹2.5 L | 244.25 ₹3.1 L | 180 ₹2.3 L | 184 ₹2.3 L | 211 ₹2.7 L | 183.11 ₹2.3 L |
| 2.20 | Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers | 540 | Cum | 6,100 ₹32.9 L | 6,000 ₹32.4 L | 6,200 ₹33.5 L | 8,577.54 ₹46.3 L | 5,750 ₹31.1 L | 5,700 ₹30.8 L | 6,606 ₹35.7 L | 5,721.51 ₹30.9 L |
| 2.30 | Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed. | 750 | Sqm | 1,150 ₹8.6 L | 1,050 ₹7.9 L | 1,200 ₹9 L | 1,814 ₹13.6 L | 1,040 ₹7.8 L | 1,020 ₹7.7 L | 1,306 ₹9.8 L | 1,131.22 ₹8.5 L |
| 2.40 | Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification. | 900 | Cum | 9,300 ₹83.7 L | 9,200 ₹82.8 L | 9,200 ₹82.8 L | 10,833 ₹97.5 L | 9,900 ₹89.1 L | 9,896 ₹89.1 L | 10,500 ₹94.5 L | 8,836.92 ₹79.5 L |
Updated dates
Tender Value
₹11.1 Cr
EMD Value
₹11.1 L
Closing Date
9 Mar 2026, 6:00 pmClosed
Deputy Director
361/1, Meenkarai Road, Pollachi 642001
Maintenace of ulandy valley Road from Topslip to Kozhikamuthi in Topslip
2026_TNFD_663656_1
3105/2025/D
Open Tender
Civil Works
30 days
Kozhikamuthi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹11.1 L
Yes
Deputy Director office pollachi
14 May 2026
22 Feb 2026
10 Mar 2026
22 Feb 2026
9 Mar 2026
3 Mar 2026
23 Feb 2026 - 1 Mar 2026
2 Mar 2026
for Maintenance of Ulandy Valley road from Topslip to Kozikamuthy Stretch -1 in Topslip of Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2025-26
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
for Maintenance of Ulandy Valley road from Topslip to Kozikamuthy Stretch -2 in Topslip of Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2025-26
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Supplying fabrication and placing in position steel rods for reinforced including cost of steel all works
for Maintenance of Ulandy Valley road from Kozikamuthy to Elakkaparai in Topslip of Ulandy Range of Anaimalai Tiger Reserve, Pollachi Division during 2025-26
Earth work Excavation and depositing on bank with an initial lead of 10 m and lift of 2 m in hard stiff clay, stiff black cotton, hard red earth , shales, murrams, stoney earth, earth mixed with small size boulders,and hard gravelly soil for foundation as per SS 20 B
Cement Concrete 1:5:10 using 40 mm iss H.G Metal including cost and conveyance of all materials at site , labour charges, curing etc.., complete and as directed by the department officers
Supplying and erecting Centering for sides and soffits including supports and strutting upto 3.29m high for plane surfaces such as RCC SLABS, RECTANGULAR BEAMS, TEE or ELL BEAMS, LINTELS, BED BLOSKS, STAIRCASE WAIST and landing slabs, landing beams, canopy etc., in all floors with all cross bracings using mild steel sheets of size 90cm x 60cm and BG 10 stiffened wit welded mild steel angles of size 25mm * 25mm x 3mm for boarding laid over countrywood joists of size 10cmx 6.50cm spaced at about 90cm centre and supported by casuarian props of 10cm to 13cm dia spaced at 75cm centre etc., complete and as directed.
Cement Concrete 1:2:4 using machine crushed / Hand Broken 20mm gauge hard broken granite stone jelly for all reinforced cement concrete works connected to this work exculding cenetering, shuttering and cost of reinforcement grills placed in position, but including laying, vibrating, curing and finishing, fixing fan clamps in the RCC floor and roof slab works wherever necessary and bearing surfaces of the wall at the sides and bottom of the slab, beams shall be finished smooth with cement mortar 1:3 and kraft paper laid without claiming extra cost etc., complete complying with standard specification.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_796900.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid