Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.1 LAdmitted-Fee/PreQual/Technical/Finance | ₹14.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹14.2 L+₹8,004.21 (0.57%)Admitted-Fee/PreQual/Technical/Finance | ₹14.2 L+₹8,004.21 (0.57%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹14.2 L+₹8,286.53 (0.59%)Admitted-Fee/PreQual/Technical/Finance 93 SOUTH ZONE COIMBATORE CORPORATION | ERODE | TAMIL NADU | 638459 | ₹14.2 L+₹8,286.53 (0.59%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹15.1 L+₹91,614.21 (6.48%)Admitted-Fee/PreQual/Technical/Finance COIMBATORE CORPORATION | ₹15.1 L+₹91,614.21 (6.48%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹15.2 L+₹1.0 L (7.37%)Admitted-Fee/PreQual/Technical/Finance | ₹15.2 L+₹1.0 L (7.37%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | P. K. SHANMUGAM L4 | THIRU ASSOCIATES L1 | VADIVENDRA ASSOCIATES L5 | JK CONSTRUCTION L2 | SHARVESH AND COMPANY L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the old Damaged RCC Slab as per direction of departmental officers | 20 | Cum | 4,190 ₹83,800 | 4,311.3 ₹86,226 | 4,564 ₹91,280 | 3,500 ₹70,000 Lowest | 4,311.15 ₹86,223 |
| 2.00 | Desilting the existing drain etc complete as per direction of departmental officers. | 83 | Cum | 100 ₹8,300 | 87.5 ₹7,262.5 Lowest | 104.4 ₹8,665.2 | 200 ₹16,600 | 99.04 ₹8,220.32 |
| 3.00 | Dismantling the old Damaged Plain cement concret side wall as per direction of departmental officers | 44 | Cum | 300 ₹13,200 Lowest | 486.46 ₹21,404.24 | 515 ₹22,660 | 350 ₹15,400 | 486.47 ₹21,404.68 |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 67 | Cum | 100 ₹6,700 Lowest | 190.54 ₹12,766.18 | 198 ₹13,266 | 100 ₹6,700 Lowest | 187.02 ₹12,530.34 |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 36 | Cum | 5,500 ₹1,98,000 | 5,069.62 ₹1,82,506.32 | 5,366 ₹1,93,176 | 5,000 ₹1,80,000 Lowest | 5,068.65 ₹1,82,471.4 |
| 6.00 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m upto 4ft length including cost of nails etc., | 491 | Sqm | 400 ₹1,96,400 Lowest | 454.03 ₹2,22,928.73 | 486 ₹2,38,626 | 450 ₹2,20,950 | 454.04 ₹2,22,933.64 |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 66 | Cum | 6,500 ₹4,29,000 | 5,713.52 ₹3,77,092.32 Lowest | 6,116 ₹4,03,656 | 5,780 ₹3,81,480 | 5,714 ₹3,77,124 |
| 8.00 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 127 | Sqm | 1,150 ₹1,46,050 | 1,003.89 ₹1,27,494.03 Lowest | 1,074 ₹1,36,398 | 1,100 ₹1,39,700 | 1,003.97 ₹1,27,504.19 |
| 9.00 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour c | 19 | Qtl | 9,500 ₹1,80,500 | 8,111.78 ₹1,54,123.82 Lowest | 8,683 ₹1,64,977 | 8,500 ₹1,61,500 | 8,111.78 ₹1,54,123.82 Lowest |
| 10.00 | Supply and fixing of 600mm RCC manhole cover with frame SFRC pipe IS 12592 | 15 | Each | 2,700 ₹40,500 | 2,201.75 ₹33,026.25 Lowest | 2,457 ₹36,855 | 2,230 ₹33,450 | 2,296.12 ₹34,441.8 |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
1 Sept 2026, 3:00 pmClosed
The Commissioner, Coimbatore Corporation
Coimbatore Corporation, Main Office, Big bazaar street, Town hall, Coimbatore-1
Reconstruction of Storm water drain with Covering Slab at Teachers Colony,Sarathamill Road in Ward No 98, South Zone
2026_MAWS_694673_1
e53/2026-south single
Open Tender
Civil Works
Works
90 days
The Commissioner, Coimbatore Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹20,000
2 Sept 2026
17 Aug 2026
2 Sept 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the old Damaged RCC Slab as per direction of departmental officers | 20 | Cum | - | - |
| 2 | Desilting the existing drain etc complete as per direction of departmental officers. | 83 | Cum | - | - |
| 3 | Dismantling the old Damaged Plain cement concret side wall as per direction of departmental officers | 44 | Cum | - | - |
| 4 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 67 | Cum | - | - |
| 5 | Cement concrete 1:4:8 (one cement, four sand and Eight aggregate) using 40mm gauge hand broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted, etc., complete complying with standard specification. | 36 | Cum | - | - |
| 6 | Centering with steel centering for revertment, drain and culvert upto 1.20m depth using MS sheet of size 0.9 x0.6m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 x 0.05 three rows with support by casurina pulleys 0.075 cm at 0.45 m upto 4ft length including cost of nails etc., | 491 | Sqm | - | - |
| 7 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 66 | Cum | - | - |
| 8 | Centering for Bed block, Lintel, Beam, Slab and Staircase slab plain surface including struttingslabs plain surface including strutting etc., complete cost and conveyanceof all materials to site and all labourcharges etc., complete. | 127 | Sqm | - | - |
| 9 | Supplying, fabrication and placing in position of steel reinforcement using mild steel of Ribbed tor steel rods, for all RCC works as per the design given by the departmental officers including cost of steel and binding wore and all labour c | 19 | Qtl | - | - |
| 10 | Supply and fixing of 600mm RCC manhole cover with frame SFRC pipe IS 12592 | 15 | Each | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
SingleDocument.pdf
Tender Documents • 0.59 MB
ITB.pdf
Additional Documents • 0.19 MB
BOQ_835177.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .