Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accepted |
| 2 | Accepted-Technical | Accepted-Technical Accepted |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹19.7 L
EMD Value
₹39,481
Closing Date
2 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Deputy Conservator of Forest Alwar
Deputy Conservator of Forest Alwar
Advance Work Range Alwar (Ditch Fencing, Countour trench, Pits, Gate, Pillar ,ECD)
2026_FORES_600020_1
9092
Open Tender
Civil Works
Item Rate
120 days
Alwar
Advance Work Range Alwar (Ditch Fencing, Countour trench, Pits, Gate, Pillar ,ECD)
2 documents required · 2 mandatory
₹500
Deputy Conservator of Forest
₹39,481
3 Oct 2026
23 Sept 2026
3 Oct 2026
23 Sept 2026
2 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Ditch fencing: Size-1.50m. at base,0.90m. at top and 1.20m. high(rates are for volume including voids) .laying of dug up soil on inner side of the plantation and removing boulders from it. Mechanically Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard Soil Mixed | 3,672 | CUM | 79 | ₹2,90,088 |
| 1.02 | Digging of Contour Trenches of size 0.45mx0.45m,(rates are for volume including voids) laying of dug up soil on lower slope,removing boulders from it.(Mechanicially) Hard soil mixed 0.45x0.45cm | 1,417.5 | CUM | 79 | ₹1,11,982.5 |
| 1.05 | Digging of Contour Trenches of size 0.45mx0.45m,(rates are for volume including voids) laying of dug up soil on lower slope,removing boulders from it.(Mechanicially) Hard soil mixed with Kankar / boulders, Morrum {(0.45cm+0.45cm)/2}x0.45cm | 1,366.88 | CUM | 98 | ₹1,33,954.24 |
| 1.06 | Digging of new pits of size 0.45 x 0.45 x 0.45 m or (0.50+0.40)/2 x (0.50+0.40)/2 x 0.45 m Hard soil mixed with Kankar / boulders, Morrum 2000 Pits x( 0.45x0.45x0.45) | 1,366.87 | CUM | 98 | ₹1,33,953.26 |
| 2.01 | Construction of Earthen checkdams/Bunds (rates are for volume including voids.) In hard soil. | 7,300 | CUM | 79 | ₹5,76,700 |
| 2.02 | Construction of ECO Hut/Jhopa | 4 | Nos | 71,652 | ₹2,86,608 |
| 3 | Construction of Iron Gate and Pillar | 4 | Nos | 34,907 | ₹1,39,628 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.40 MB
Rangealwaradvanceworktenderpdf.pdf
Tender Documents • 13.38 MB
BOQ_1063537.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .