Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.2 LAccepted-AOC | ₹26.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.6 LRejected-AOC | ₹26.6 L | L2 | Rejected-AOC L2 |
| 3 | L3₹27.5 LRejected-AOC | ₹27.5 L | L3 | Rejected-AOC L3 |
| 4 | L4₹27.6 LRejected-AOC | ₹27.6 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Usmanali S L2 | K GURUMURTHY L3 | N NALLATHAMBI L1 | P SENTHILKUMAR L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all kinds of soil except
hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial | 9 | m3 | 298 ₹2,682 | 258 ₹2,322 | 246.04 ₹2,214.36 | 260 ₹2,340 |
| 2.00 | Supplying and filing in foundation and basement with filling sand in layers of 15 cm thick well rammed and consolidation including watering complying with Std specification etc. | 2 | m3 | 1,950 ₹3,900 | 418.93 ₹837.86 | 398.2 ₹796.40 | 420 ₹840 |
| 3.00 | Plain cement concrete in 1:4:8 (one cement four sand and eight aggregates) with 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc., complete. | 2 | m3 | 6,494.65 ₹12,989.30 | 5,675.6 ₹11,351.20 | 5,394.65 ₹10,789.30 | 5,700 ₹11,400 |
| 4.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. For Basment Floor | 7 | m3 | 9,000 ₹63,000 | 9,349.41 ₹65,445.87 | 8,886.61 ₹62,206.27 | 9,400 ₹65,800 |
| 5.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors | 516 | Kg | 95.42 ₹49,236.72 | 93.5 ₹48,246 | 89.22 ₹46,037.52 | 95 ₹49,020 |
| 6.00 | Roofing with Galvanised Coruugated Iron Sheet of 0.8mm thickness - 10 m2 | 870 | m2 | 1,100 ₹9.6 L | 1,071.39 ₹9.3 L | 1,018.35 ₹8.9 L | 1,071.39 ₹9.3 L |
| 7.00 | Fabriction supply and erection of to bulor post with Truss(100mm,80mm,75mm) The Rate shall be include the cost of to bul or post Truss members, labour charges for manufacturing and erection and Painting etc.,complete.as per departmental specification and drawings. | 8,700 | Kg | 108 ₹9.4 L | 126.42 ₹11.0 L | 120.16 ₹10.5 L | 126.42 ₹11.0 L |
| 8.00 | Wiring with 2x1.50 sq.mm PVC unheated SC Aluminium cable of 1100 V grade in suitable PVC rigid pipes in wall or ceiling with PVC accessories with TW switch box in flush with wall covered by hylum sheet3mm thick and painting with suitable colour of 14 SWG TC wire for light point.(SD-10) | 70 | no | 2,450 ₹1.7 L | 1,724 ₹1.2 L | 1,638.66 ₹1.1 L | 1,724 ₹1.2 L |
| 9.00 | Supply and fixing of single box type 4'40W flu Fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu. Tube with PVC unsheated leads from terminals to the fitting. | 60 | no | 870 ₹52,200 | 893 ₹53,580 | 848.8 ₹50,928 | 895 ₹53,700 |
| 10.00 | ADD GST18% | 1 | GST | 0 ₹4.1 L | 0 ₹4.2 L | 0 ₹4.0 L | 0 ₹4.2 L |
Tender Value
₹27.5 L
EMD Value
₹27,549
Closing Date
13 Feb 2026, 3:00 pmClosed
The Commissioner Madurai Corporation
Aringar Anna Maligai , Thallakulam , Madurai
Kalaiyarangam shed Arrangements at Old Vilangudi near bus stand in ward no 20
2026_MAWS_650915_1
E7 / EST.192(MLA-W)/ 2025-26
Open Tender
Civil Works
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹27,549
28 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
Earth work excavation in all kinds of soil except hard rock requiring blasting inclusive of shoring, strutting and bailing out water wherever necessary refilling the sides of foundation with excavated earth in layer of 15 mm thick well rammed and consolidated depositing the surplus earth within compound, clearing and leveling the site with initial
Supplying and filing in foundation and basement with filling sand in layers of 15 cm thick well rammed and consolidation including watering complying with Std specification etc.
Plain cement concrete in 1:4:8 (one cement four sand and eight aggregates) with 40mm gauge hard broken granite jelly for foundation including consolidation and dewatering for foundation wherever necessary etc., complete.
Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. For Basment Floor
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors
Roofing with Galvanised Coruugated Iron Sheet of 0.8mm thickness - 10 m2
Fabriction supply and erection of to bulor post with Truss(100mm,80mm,75mm) The Rate shall be include the cost of to bul or post Truss members, labour charges for manufacturing and erection and Painting etc.,complete.as per departmental specification and drawings.
Wiring with 2x1.50 sq.mm PVC unheated SC Aluminium cable of 1100 V grade in suitable PVC rigid pipes in wall or ceiling with PVC accessories with TW switch box in flush with wall covered by hylum sheet3mm thick and painting with suitable colour of 14 SWG TC wire for light point.(SD-10)
Supply and fixing of single box type 4'40W flu Fitting complete with copper choke and condensor with TW round blocks on wall or ceiling with flu. Tube with PVC unsheated leads from terminals to the fitting.
ADD GST18%
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
docs.pdf
Tender Documents • 0.79 MB
BOQ_780485.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid