Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹13,965.20 (8.13%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.9 L+₹22,404.26 (13.0%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
4 Aug 2026, 6:00 pmClosed
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Constt. Of Boundary wall at GMS Mehanta di pattiyan Pyt Bhalwal Mullo Block Pargwal Distt. Jammu under ABDP budget for the year of 2026-27
2026_RDPR_317118_5
eNIT No. 219 REWJ of 2026 dated. 21-07-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,820
Yes
6 Aug 2026
21 Jul 2026
5 Aug 2026
21 Jul 2026
4 Aug 2026
21 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:15.2.1 1:3:6 or richer mix (i/c equivalent design mix) | 4.25 | cum | 1,725.2 | ₹7,332.1 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:In cement mortar | 0.62 | cum | 1,458.45 | ₹904.24 |
| 3 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 1.06 | cum | 479.3 | ₹508.06 |
| 4 | P/L in position cement conc. 1:5:10 mix Of specified grade excluding the cost of centring & shuttering using 40mm N/ size. | 0.7 | cum | 4,826.5 | ₹3,378.55 |
| 5 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | 5.75 | cum | 5,733.6 | ₹32,968.2 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 1.75 | cum | 6,591.25 | ₹11,534.69 |
| 7 | Providing and fixing formwork incl. strutting, propping, etc & removal of formwork | 23.23 | sqm | 286.35 | ₹6,651.91 |
| 8 | Brick work in bricks of class designation 7.5 in superstructure above plinth level upto floor five level and curing complete in: 6.37.2 Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.82 | cum | 7,571.55 | ₹51,637.97 |
| 9 | Half Brick Masonary in (1:4) mix cement mortar for super structure upto floor level V. | 47.4 | sqm | 947.5 | ₹44,911.5 |
| 10 | Repairs to plaster of thickness 12mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape raking out joints and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 meters lead 14.1.1 With cement mortar 1:4 (1 cement : 4 fine sand) | 18.12 | sqm | 441.5 | ₹7,999.98 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.34 MB
BOQ_1037778.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .