| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 165 2 ADARSH NAGAR AURI MORE ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical 00 LALPUR KICHHA ROAD RUDRAPUR KICHHA RUDRAPUR UDHAM SINGH NAGAR UTTARAKHAND 263148 | UDAM SINGH NAGAR | UTTARAKHAND | 263148 | Rejected-Technical Firm not fulfilling all criteria as per PQC |
Tender Value
₹27.4 L
EMD Value
₹27,372
Closing Date
29 Nov 2024, 2:00 pmClosed
SE OMC-I DTPS HTPS
OFFICE OF SE OMC-I DTPS HTPS KASIMPUR
Maintenance of CW pumps and its associated duct. , valves, EOT etc. except TWS of Unit No 07 CTPS, Kasimpur, Aligarh for the period of Two Years.
2024_RVUNL_967642_1
ET-07/OandMC-I /CAMD/DTPS/HTPS/2024-25
Open Tender
Miscellaneous Works
Lump-sum
730 days
HTPS Kasimpur
As per Tender Documents
2 documents required · 2 mandatory
₹1,652
SAO EPAD
₹27,372
19 Dec 2024
22 Oct 2024
2 Dec 2024
22 Oct 2024
29 Nov 2024
22 Oct 2024
22 Oct 2024 - 29 Nov 2024
Amount
1. Erection /replacement of M.S. Pipe lines 1.01 M.S.Pipe line of 12.5x25, 32, 40mm
1.02 M.S. Pipe line of 50,60,80mm
1.03 M.S.Pipe line of 100,125,150mm
1.04 M.S.Pipe line of 175,200, 250, 300mm
2. Leakage attending:- 2.01 Pipe size 50,75,100mm
2.02 Pipe size 125, 150,200mm
3. Fabrication and fitting of cut bends. 3.01 Pipe size dia 50,60,80mm
3.02 Pipe size dia 100,125,150,200mm
4. Fabrication and fitting of flanges by welding. 4.01 size 100,125,150mm dia
4.02 size 175,200mm dia
4.03 size 250,300mm dia
5. Attending leakages through lead filling 5.01 To attend leakages from 100/150mm dia CI Underground line.
6. Floor Cleaning and up keeping of Intake Pump House, ABC Pump House and C.T. Pump House in general shift.
7. Complete cleaning of Basin of ABC, cooling tower
8. Complete cleaning of Pit of Sump Pump at ABC Pump House
9. Round the Clock cleaning of wire mesh frame installed at inlet gate of CW Pump suction pit and preventive maintenance, up keeping, attending of breakdown minor fault only, and to meet out operational requirement of all ABC Pumps, ABC cooling tower, service/sealing pumps, CT Pumps, CW high head Pump, Makeup Pumps, Tube-wells, Sump Pumps and Trolley pumps etc.
10. Shifting of unworkable pump and placing new repaired pumps 10.01 Sump pumps (vertical)
10.02 Trolley pump
10.03 Auxiliary Bearing cooling pumps
10.05 Service/ Sealing pumps
10.05 Condensate transfer pump
10.06 Make-up pump
11.0 Overhauling of defective pumps at site 11.01 Sump pumps (vertical)
11.02 Trolley pump
11.03 Auxiliary Bearing cooling pumps
11.04 Service /Sealing pumps
11.05 Make-up pump
11.06 Condensate transfer pumps
12.0 Decoupling alignment and coupling of pumps with motor 12.01 Sump pumps(vertical/ Horizontal)
12.01ABC Pumps
12.03 service/Sealing pumps
12.04 Make up pumps
12.05Condensate transfer pump
13.00 Replacement/Inspection of bearing & sleeve (both) 13.01 Auxiliary Bearing cooling pumps
13.02 Condensate transfer pumps
14.00Replacement/repairing of Gear box fan of ABC/CW cooling tower 14.01Replacement & alignment of fan blades
14.02 Replacement of Gear box
14.03 Repairing/overhauling of Gear box
15. Replacement of tube-well complete
16.00 Replacement of components of auxiliaries/ equipment’s: 16.01 Expansion joints
16.02 Butterfly valves
16.03 Gate valves/NRVs of 25mm, 40mm, 50mm size
16.04 Gate valves/NRVs of 65mm, 75mm 100mm ,125mm , 150mm
16.05 Gate valves/NRVs of 175mm 200mm, 250mm, 300mm
16.06 Valve of size 450mm
17.00 Servicing of Water valves of size 17.01 Gate valve/NRV of 25mm, 40mm, 50mm
17.02 Gate valve/NRV of 65mm, 75mm, 100mm
17.03 Gate valve/NRV of 125mm, 150mm
17.04 Gate valve/NRV of 175mm, 200mm
17.05 Gate valves/NRV of 250mm, 300mm, 450mm
17.06 Butterfly valves of 900mm
17.07 Gear box of butterfly valve
18. Inspection of Butterfly valve/sheet size 900mm
19 Inspection/Bearing replacement of Butterfly valve Gear box
Repairing of Component High Head Pump 1 Head Shaft
2 Transmission Shaft
3. Impeller Shaft
4. Upper Bowl
5. Lower Bowl
6. Spider
7. Bearing Insert Bush
8. S.S. Impeller
(B )Fabrication and fitting of Sleeve 1. Fabrication of Gland Sleeve and fitted on Head Shaft with circlip.
2. Fabrication of Hot Sleeve and fitted on Transmission Shaft with circlip.
3. Fabrication of Sleeve for Impeller Shaft. (I ) Sleeve under lower bowl (material Bronze)
(II) Sleeve under upper bowl (material Bronze)
(III) Cast Iron distance sleeve of size:- a) L-340mm, OD-130mm, ID-120 mm,
b) L-200mm, OD-130mm, ID-120 mm
c) L-185mm, OD-130mm, ID-120
d) L-25mm, OD-150mm, ID-120
4. Fabrication of Collar (material CI)
5. Fabrication of Shell of rubber Bearing
6. Fabrication of Impeller Nut(Bronze)
7. Fabrication of Lock Nut & Lift Nut(S.S.)
8. Fabrication of Key
9. Fabrication of S.S. Studs with double nuts
(C) Rerubberisation of Shell of high head pump 1. Spider Shell(OD162,ID 130,280L)
2. Insert Bush Shell(OD147,ID 130,240L)
(D) Rebabbiting old bearing of high head 1. Rebabbiting of Thrust bearing housing
(E) Dismantling and Commissioning of Pump at Site
(F) Make up water pump (No of Installed Qty-3) 1. Dismantling of pump for internal inspection of parts at site.
2.0 Complete repairing of the following components 2.1 Stage Body
2.2 Impeller
2.3 Dynamic Balancing of rotating components within accuracy (Rotor, Impeller)
3.0 Repairing of shaft by metalizing and machining to get original profile and removal of shaft run out within 0.02mm. 3.1 Head shaft
Impeller shaft
4.0 Fabrication of following components as per actual/sample and fitting in pump from own material of the contractor 4.1 Re-rubberization brass bearing
4.2 Threaded barrel coupling (SS Material)
4.3 Distance sleeve (SS Material)
4.4 Gland Sleeve(SS Material)
4.5 Lifting Nut(SS Material)
4.6 Lock Nut(SS Material)
4.7 Thrust Bearing housing (C.I.)
4.8.0 S.S. Fastners 4.8.1Re-rubberization brass bearing
4.8.2 Length 85 MM,OD 12 MM
4.9 Neck ring/wear ring for Bell mouth
4.10Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts nipples/packing’s etc. to be arranged by firm at their own cost.
4.11 Erection & commissioning of the pump at site.
(G) Auxiliary Bearing Cooling Pump (No of Installed Qty-5) 1. Dismantling of pump for internal inspection of parts at site.
2.0 Fabrication and replacement of undernoted parts from the own material of the contractor 2.1 Shaft of EN-8 steel
2.2 Gland sleeve (S.S.)
2.3 Sleeve Nut / Lock Nut (S.S.)(2 DE&2NDE)
2.4 Packing gland Assembly / gland stocker(C.I.)
2.5 Wearing Ring for casing (C.I.)
2.6 Lock Nut for Bearings with Lock washer (S.S)
3. Repairing of pump casing at bearing portion by welding with CI electrodes and machining
4. Repairing of bearing housing
5. Repairing of impeller (gun metal)
6. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost
7. Erection & commissioning of the pump at site.
(H) Sealing Pumps :- ( (No of Installed Qty-5) 1. Dismantling of pump for internal inspection of parts at site.
2.0 Fabrication and replacement of undernoted parts from the own material of the contractor 2.1 Shaft of EN-8 steel
2.2 Gland sleeve (SS)
2.3 Impeller Nut (S.S.)
2.4 Packing gland Assembly/Gland Stoker (C.I.)
2.5 Wearing Ring for casing (G.M.)
3 Repairing of impeller
4 Repairing of pump casing at bearing portion by welding With CI electrodes and machining
5 Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost
6. Erection & commissioning of the pump at site.
(I)Sump Pump(vertical / horizontal) (installed Qty. 6 Pumps) 1.0 Fabrication and replacement of undernoted parts from the own material of the Contractor. 1.1 Gland Sleeves (S.S)
1.2 Shaft of EN-8 Steel for horizontal Sump pump
1.3 Shaft of EN-8 Steel- for vertical Sump pump
1.4 Impeller Nut(SS)
1.5 Packing gland Assembly Gland Stoker(C.S)
1.6 Wearing Ring for casing.
1.7 Impeller C.I.
1.8 Bush (Material GM)
2. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost.
Diesel trolley pump (No of Installed Qty-1) 1.0 Fabrication and replacement of undernoted parts from the own material of the Contractor. 1.1 Gland Sleeves (S.S)
1.2 Shaft of EN-8 Steel-
1.3 Impeller Nut(SS)
1.4 Packing gland Assembly Gland Stoker(C.S)
1.5 Wearing Ring for casing (Gun Metal)
1.6 Impeller C.I.
1.7 Bush (Material GM)
2. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost
(K)Dewatering Trolley Pump (No of Installed Qty-4) 1.0 Fabrication and replacement of undernoted parts from the own material of the Contractor. 1.1 Gland Sleeves (S.S)
1.2 Shaft of EN-8 Steel-
1.3 Impeller Nut(SS)
1.4 Packing gland Assembly Gland Stoker(C.S)
1.5Wearing Ring for casing (Gun Metal)
1.6 Impeller C.I.
1.7 Bush (Material GM)
2. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost.
(L) Condensate Transfer pumps :- (No of Installed Qty-3) 1. Complete dismantling of the pump at site and checking of its all internals for measuring the run outs, status of wear out etc
2.0 Fabrication and replacement of following spares from the own material of the contractor 2.1 Gland sleeves (Material Phosphorus Bronze)
2.2 Wearing rings (Material Gun Metal)
2.3 Distance bushes (Material Gun Metal)
2.4 Balancing disc (Material Gun Metal)
2.5 Fabrication & Fixing of Impellers (Mat. Phosphor Bronze)
3. Repairing of wearing disc.
4. Repairing of stage bodies and suction & discharge covers
5. Dynamic balancing of rotor with impeller assembly
6. Repairing of impeller (gun metal )
7. Repairing of bearing housing
8. Repairing of shaft
9. Repairing of diffuser
10. Assembly of the pump by maintaining clearances as per manufacturer’s norms and by replacing any other small components such as keys/pins/screws/ bolts/nuts /nipples/packing’s etc. to be arranged by firm at their own cost
11. Erection & commissioning of the pump at site.
(M) Submersible pumps of tube-well (Qty. 03Job) 1. Complete repairing and fabrication of different parts of submersible pump for tube-well.
(N)Overhauling of motor (1000KW) of High head of CW Pump of Unit No. 7, (110 MW), HTPS Kasimpur, Aligarh
(O) Complete repairing of weda/mody submersible pump including Rewinding of motor & replacement of damaged parts.(capacity of 7.5 KW)
(P) Complete repairing of weda/mody pump including Rewinding of motor & replacement of damaged parts.(capacity of 3.7/3.8/5 KW)
(Q) Operation and Up keeping works of EOT Crane having capacity 15MT installed at intake pump house of unit no. #7 (110 MW) HTPS, Kasimpur, Aligarh.
M/S SCIENTECS PROCESS CONTROL (BID ID -4750083)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .