Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹1.6 Cr | L1 | Accepted-AOC Accepted as Techno Commercially evaluated L1 Bidder |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected in shortfall of Confirmatory Documents |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected in shortfall of Confirmatory Documents |
| Sl No | Description | Qty | Unit | SANTOSH KUMAR SINGH L1 |
|---|---|---|---|---|
| 1.00 | Excavation of coal/shale in UG mine by chiseling in trenches and drains for making notches in gallery including stacking of serviceable material and unserviceable material with a lead up to 30mt.and lift up to 1.5mt. Including neat dressing of the roof floor and sides as per the instruction of the E.I.C. | 283.2 | m3 | 9,312.97 ₹26,37,433.19 Lowest |
| 2.00 | Brick work 1:6 in foundation and plinth in class designation 50 bricks excluding carriage of material from incline mouth to the U/G mine site.Foundation | 101.95 | m3 | 9,034.79 ₹9,21,096.63 Lowest |
| 3.00 | Brick work in super structure, above plinth level up to floor-2 level | 372.47 | m3 | 10,309.79 ₹38,40,086.38 Lowest |
| 4.10 | Transporation(Track line lead =2-3 km, Manual lead = 50-100 mt.) | 136.6 | m3 | 11,757.33 ₹16,06,051.48 Lowest |
| 4.20 | Transporation(Track line lead =2-3 km, Manual lead = 50-100 mt.) | 169.74 | m3 | 11,757.33 ₹19,95,689.44 Lowest |
| 4.30 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 168.08 | m3 | 10,571.03 ₹17,76,778.08 Lowest |
| 5.00 | 12mm thick cement plaster 1:6 (1cement : 6 coarse sand) excluding carriage of materials from Incline mouth to the U/G mine site. | 414.42 | m2 | 514.53 ₹2,13,233.2 Lowest |
| 6.10 | Transporation(Track line lead =2-3 km, Manual lead = 50-100 mt.) | 116.6 | m2 | 199.36 ₹23,245.77 Lowest |
| 6.20 | Transporation(Track line lead =2-3 km, Manual lead = 50-100 mt.) | 149.74 | m2 | 199.36 ₹29,852.67 Lowest |
| 6.30 | Transporation(Track line lead =1-2 km, Manual lead = 0-50 mt.) | 148.08 | m2 | 178.66 ₹26,456.6 Lowest |
Tender Value
₹1.5 Cr
EMD Value
₹1.8 L
Closing Date
16 Jul 2025, 5:00 pmClosed
Staff Officer (Min), OA
Office of the General Manager, Orient Area, MCL
Underground construction of 15 nos of Sectionalisation Stoppings (Bricks) in 85LN Panel (Sec-C),85LN Panel (Sec-C1) and 43LN Panel (Sec-C1) at HBM of RSA
2025_MCL_338611_1
MCL/GM/OA/SOM/25/NIT-271/1038
Open Tender
Civil Works - Others
Item Rate
460 days
Hirakhand Bundia Mine, RSA, OA, MCL
PLEASE REFER TENDER DOCUMENTS
5 documents required · 5 mandatory
₹1.8 L
25 Oct 2025
30 Jun 2025
17 Jul 2025
1 Jul 2025
16 Jul 2025
1 Jul 2025
1 Jul 2025 - 9 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .